Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Approach to Optimising Coal Mine Design for Sustainable Development

    By M E. Karmis

    Traditional coal mining planning seldom considers key æsustainability factorsÆ such as: societal impacts in the area; jobs (both created and lost); dislocation of towns and residences; impact on neigh

    Jan 1, 2009

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    Developing Gold Mines in the 1980's

    The 1980's has seen a revolution in gold mine developments in Australasia. We are witnessing a near ten fold increase in all phases of gold mine development ranging from exploration through to pr

    Jan 1, 1986

  • AUSIMM
    A Collaborative Model for Developing Future Continuing Education and Training in Mining

    By S W. Houlding

    The Certificate in Mining Studies program at the University of British Columbia, Vancouver, Canada is a collaborative initiative between mining schools and industry to provide accessible, cost-effecti

    Nov 22, 2011

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Justification for Integrating Mechanical Sampling with Online Analysis

    By D W. Stevens

    Mechanical sampling provides a definitive value for the product sampled but the results are not instantaneous, meaning that decisions on process control can only be made hours after the sample is take

    Jul 29, 2014

  • AUSIMM
    Sensitive dependence on initial conditions in resource estimation

    By D Kentwell

    This extended abstract and associated presentation provide a series of real examples of the complex interactions between the numerous input parameters, both geological and mathematical, that are requi

    Nov 21, 2018

  • AUSIMM
    A Great Project Team - Bringing Together Location and Culture

    By A M. Ebbels, D Pratt

    The current commodities super-cycle has seen an explosion in the number of mining projects demanding human resources throughout the world. The demand for key personnel currently far outweighs the inte

    May 24, 2012

  • AUSIMM
    Impurity Removal in the Reverse Flotation of Iron Ore

    By M Ma, W J. Bruckard, C Gontijo, R Holmes

    Vale is the largest iron ore producer in the world. Since the 1970s, Vale has been using reverse cationic flotation to remove siliceous impurities from its iron ores. Whilst this flotation process has

    Aug 12, 2013

  • AUSIMM
    Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)

    By D Cumming-Potvin

    Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe

    Mar 24, 2014

  • AUSIMM
    South-west Ventilation Shaft Project at Newstan Mine

    By D Piason

    Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of

    Aug 31, 2015

  • AUSIMM
    Chemical- and micro-analytical techniques for molten slags, mattes, speisses and alloys

    By E Jak, P Hayes, J Chen

    The paper provides an overview of the various analytical and microanalytical techniques currently in use to characterise the outcomes of pyrometallurgical processes, examining the advantages and limit

    Jun 19, 2024

  • AUSIMM
    Application of Infrared Spectral Data for Predictive Modelling of Alteration-Mineralisation Systems

    By S Pontual

    The use of spectral data has traditionally been for obtaining mineral information and for mapping out alteration systems. The output from these data is typically in the form of mineral assemblages and

    Aug 22, 2011

  • AUSIMM
    Technology options for processing complex and double refractory gold ore

    By D Connelly

    The initial results for the cyanide leach gold recoveries were very poor on a high-grade primary sulphide ore of 6.2 g/t Au with no silver. Subsequent mineralogy showed the ore to be a characteristic

    Nov 21, 2018

  • AUSIMM
    Mining Towards 2000

    By Clifford C. E

    1 eat my peas with honey I've done it all my lifeIt makes them taste rather funny But it keeps them on the knife.Innovation is that elusive characteristic which involves the determination of mult

    Jan 1, 1993

  • AUSIMM
    Bendigo Mine Grade Control

    Bendigo is AustraliaÆs second-most productive goldfield, having produced some 22 million ounces of gold between 1851 and 1954. Bendigo Mining Limited (BML), the sole lease-holder of the Bendigo Goldfi

    Jan 1, 2006

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    "Proposed Methodology for Utilising Automated Core Logging Technology to Extract Geotechnical Index Parameters"

    By R Berry, J Lett, C L. Harraden

    "In the past decade, increased processing capacity combined with precision robotics in high resolution spectrometers has resulted in a new generation of high-speed hyperspectral core logging systems.

    Jun 15, 2016