Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Unlocking resource confidence in coal through use of conditional simulation

    By B Haase, R Saha

    Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h

    Mar 22, 2022

  • AUSIMM
    Implicit Modelling Applied to Grade Control Data

    By J Ireland, S Rose

    The main outcomes of mining grade control include defining the boundary between ore and waste and then categorising the ore according to which stockpile it should be sent. A typical workflow includes

    Aug 18, 2014

  • AUSIMM
    Recovering RE with NH<sub>4</sub>Cl Roasting from Bastnasite Ore

    By Q Xin, X Shengming, C RuÆan, Z Zhigeng a

    The optimum defluorinating conditions for Sichuan bastnasite crude ore were determined by orthogonal experiments. Over 95 per cent fluorine in the crude ore was stripped by roasting 30 minutes of the

    Jan 1, 2000

  • AUSIMM
    Wide area mapping of ground instabilities from space: InSAR for geotechnical risk assessment and hazard monitoring

    By J Morgan

    Regular monitoring of surface deformation over mine sites is important for providing updated information to managers regarding geotechnical risks related to ground instabilities. This is particularly

    Nov 30, 2018

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven&apos;t spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    What Do Geologists Really Do?

    In 1952 when universities imposed fees on students and most students won either Commonwealth or Government department or private scholarships to study, I won a scholarship to study mining engineeri

    Jan 1, 1994

  • AUSIMM
    Role of Environmental Ore Deposit Models in Resources Development

    By Y T. J Kwong

    With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource

    Aug 22, 2011

  • AUSIMM
    Eco-Environmental Problems Caused by the Process of Limestone Mining and Management Options

    By X X. Qiu, T Zhang, B L. Wang, X Qiu, Y H. Du

    This paper summarises the information about current state of eco-environmental problems, geological disaster and mining waste causing during the process of limestone mining. By comparing the managemen

    Jul 10, 2012

  • AUSIMM
    Two South Australian Coastal Rehabilitation Programmes After Mining

    Two separate mine rehabilitation programmes carried out by Australian Consolidated Industries Limited (A.C.I.) in South Australia at Normanville and Port Lawler are discussed. Emphasis is given to

    Jan 1, 1976

  • AUSIMM
    Miining Development, the Public Sector and The AusIMM - Issue and Future Directions

    The mining of Australia&apos;s rich and diverse mineral resources has been central to the development of the continent by "Europeans" over the past two hundred years. Mining has historically been en

    Jan 1, 1988

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    MMG’s Australian Operating Model – the Implementation, Successes and Learning

    By R M. S Watsford, M Davis

    In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening

    Jun 22, 2016

  • AUSIMM
    A guide to reporting Mineral Resource exclusive of Mineral Reserve

    By H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera

    With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa

    May 24, 2023

  • AUSIMM
    Aren't You Too Young to be a Consultant?

    Many young mining engineers do not consider consulting as a possible job, believing that many years of working on-site is required to achieve practical experience, develop expertise and acquire indust

    Jan 1, 2009

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    A Geological Overview of HyLogging 18 000 m of Core from the Eastern Goldfields of Western Australia

    By T Roache, K Yang, M Quigley, C Young

    In late 2004 a large-scale evaluation of a new suite of tools for semi-automated core logging was carried out in the Eastern Goldfields of Western Australia. Known as HyLoggingÖ Systems, these combine

    Jan 1, 2006

  • AUSIMM
    Geometallurgical Characterisation of a Tailings Storage Facility – A Novel Approach

    By T Napier-Munn, E Louwrens, L Keeney

    Geometallurgical characterisation of ore deposits is accepted practice in some parts of the mining industry today. Its primary aim is to provide constrained inputs that reflect inherent geological var

    Jul 27, 2015

  • AUSIMM
    The Determination of Dust Losses in Metallurgical Processes, As Practised at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    IN carrying out experiments to determine the amount of metal taken away by fume or fine dust the apparatus used requires to be strong and compact, as it is generaIIy necessary to work on a staging fix

    Jan 1, 1922

  • AUSIMM
    Systems thinking and its need in the workforce of tomorrow

    By D Brown, K Markovic

    The world is becoming an increasingly complex environment to operate within. Adoption and evolution of technology is occurring at a rapid pace and operating spaces are growing in interconnectedness an

    Sep 1, 2024