The influence of roadway configurations on VCD and bulkhead designBy M Salu
Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme
Oct 12, 2022
-
Extension Hill Direct Ship Iron Ore Project – Seven Years in the MakingBy R Forster
Direct ship iron ore (DSO) operations at Extension Hill in Western Australia’s Midwest region have commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves are 14.8 millio
Jul 11, 2011
-
Development Of Lead Flotation Process Control At The Zinc Corporation, LimitedBy Dawes C. A, Mitchell R. A
A process control strategy has been developed for the lead circuit of the lead- zinc concentrator at The Zinc Corporation, Limited (ZC), Broken Hill, Australia. The general aims of the control syst
Jan 1, 1983
-
Sustainable Plant DesignBy J Kwak
Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth
Jan 1, 2004
-
Creating the Optimal Coal Working SectionBy P Lukic
The definition of the working sections that will be used in a mine is usually initially made in the field by the geologist supervising the drilling program. These initial definitions are often made on
Sep 26, 2011
-
Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of MoranbahBy S Lockie, G Ivanova, J Rolfe
One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r
Jan 1, 2009
-
Setting new standards at Kanmantoo – effective grade control proceduresBy M Reid, H Arbon
Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an
Sep 20, 2017
-
Acid Rock Drainage Treatment Technologies ù Identifying Appropriate SolutionsBy N Murphy and, S Santomartino, M Cramer
Acid rock drainage (ARD) can have detrimental effects on mining infrastructure, water reuse options and environmental discharge. As a result, some form of short- or long-term treatment is required at
Jan 1, 2003
-
Optimising flotation plant operation by using a digital twin in the control roomBy R Tooher, S J. Oliver
The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p
Aug 29, 2018
-
Sustainability in Mining Engineering - Strategies Through Education and ResearchBy A J. Gunson
The Norman B Keevil Institute of Mining Engineering, or the Department of Mining Engineering (the Department), at CanadaÆs University of British Columbia (UBC) is addressing the integration of sustain
Jan 1, 2009
-
Improved iron ore processing through digitalising conveyed ore flowsusing representative real time multi-elemental analysisBy H Kurth
High specification Prompt Gamma Neutron Activation Analysis (PGNAA) has been successfully applied to conveyed flows at iron ore operations since 2002 to representatively measure ore quality for improv
Sep 18, 2023
-
Presidential Address, 1967 Overseas Investment in the Australian Mining IndustryThere was a time, in the memory of some here tonight, when the annual meeting of The Institute was a nostalgic occasion. Often, in the 1920s, there was comment on the decline of Australian mining and
Jan 1, 1967
-
Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to ImplementationBy B Belle
In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang
Aug 31, 2015
-
Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based SimulatorsBy P Wood, S Leveritt
This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy
Sep 18, 2012
-
Light RailwaysThe story of the rise, progress, and development of our modern railway system is a long but an exceedingly interesting one. The phases it has passed through, the discussions that have arisen from time
-
Olympic Dam mine closure planning processBy G Hill, D Grant, M Tyler
Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered
Jul 25, 2018
-
New Life for the Argyle Diamond Mine – Block Cave Style and BeyondBy D C. Ford
The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation
Aug 22, 2011
-
A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk FactorsBy M Szwec, P Corbett, P Sheffield
Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place
Nov 5, 2014
-
Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler
The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w
Aug 29, 2018
-
Tunnelling within the Bunya Phyllite of Legacy Way, Brisbane, QueenslandBy M Norbert, C Bennett
The Legacy Way Tunnel was constructed from Toowong to Kelvin Grove in Brisbane, and is the first large-scale underground excavation in the Bunya Phyllite in Brisbane. The Legacy Way Tunnel is 4.3 km i
Sep 17, 2014