Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Palaeostress, Sesmicity and Plate Motion, Port Moresby and Adjacent Regions, Papua New GuineaPalaeostress analyses of the northeast-dipping Koki Fault Zone demonstrates in the hanging wall an east-west compressive stress and sinistral reverse-slip. Data from the footwall region are more un
Jan 1, 1997
-
Local uncertainty benchmarking – a coal case studyBy R Saha, D Barry, C Mawdesley, O Bertoli
Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often
Sep 20, 2017
-
The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modellingBy E Asakpo, S Chaffer, A Heath
Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin
Aug 29, 2018
-
Energy Efficiency Assessments in Design – Seminal Decisions and Effective ProcessesBy M Allen
Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta
Aug 8, 2011
-
Discovery of the Corunna Downs DepositsBy P J. Howard, P Darvall, J H. Mainwaring
In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south
Jul 13, 2015
-
Improving tungsten recovery through the reuse of mine wastewaterBy Z Gao, D Liao, W Sun, S G. Pooley, J Wang, Z Shi, G Jing, S Ren, Q Chen
Yuanjing processing plant is a scheelite and wolframite plant in southern China. Water shortages and recent environmental regulations mean that the plant must reuse the wastewater that comes from the
Aug 24, 2022
-
Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper OperationBy T D. Jolly, L A. Balzan, A R. Harris, Z Bauk
"The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th
Oct 10, 2016
-
Hoesch Ajo System for Granulation of Blast Furnace SlagsBy Kister H
Hoesch HUttenwerke AG, Dortmund, West Germany, is an integrated steel work of the Estel-group. The nominal annual production capacity-is about 7 Mio tons of steel. Hoesch has along experience in opera
Jan 1, 1979
-
Using Flexsim Simulation Models to Assess Coalmine Roadway Development PerformanceBy D Cai, E Baafi
Various enabling technologies and systems have recently been introduced in the mining industry. Such systems include miner-bolters with concurrent cutting and bolting, employment of two shuttle cars,
Sep 26, 2011
-
Modelling Open Pit and Underground Production Scheduling in ConcertBy B King
A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti
Nov 24, 2014
-
Leaching of Mt Weld Phosphate Ores with Acetone-water-SO2 MixturesBy Lee Y. K, Walker G. S, Bronswijk V. W
The effect of leaching three samples of Mt Weld ore with a-hydroxysulphonic acid [(CH3)2(COH)SO3H] was assessed. Apatite present in the samples was found to be readily soluble but calcination up to
Jan 1, 1991
-
Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum FiltrationBy R Klepper
Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick
Aug 8, 2011
-
Goldilocks – value of information for geoscience applied to coal in tactical time horizonsBy D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman
Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th
Mar 22, 2022
-
Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map ConceptBy S Thomson, G Rigby, J Norgard, D Wilkinson
Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en
Aug 24, 2015
-
Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?By S O’Connell, M Scholz, A Robertson, M L. Bloss
The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan
Jun 22, 2016
-
Applicability of Categorical Simulation Methods for Assessment of Mine Plan RiskBy A Jewbali, R Perry, R Inglis, L Allen
"The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively
Nov 24, 2014
-
Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave OperationsBy G Chitombo, A Perryman, A D. Campbell, J White, B Hollis
This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable
May 9, 2016
-
Application of the Proton Microprobe to the Partitioning of Platinum Group Elements in Sulphide and Oxide PhasesBy Ryan CG, Ramsden AR, Sie SH, French DH, Griffin WL
Proton microprobe and electron microprobe analysis are being used in combination for in situ determination of the trace element contents of oxide, sulphide and silicate minerals in a sample of the
Jan 1, 1989
-
Development of a nitrogen prediction model for 320 tonne converterBy Y D. Jeon, K S. Kim, C-H Eom, C M. Yoon
The carbon neutrality continues to require reduction of carbon usage in ironmaking and steelmaking processes. Specially, it is expected that the hot metal ratio (HMR) in the steelmaking process should
Aug 21, 2024
-
The Use of High Resolution Geophysical Technologies to Map the Base of Ore at BHP Billiton Æs Yandi Channel Iron DepositBy G Hall
BHP BillitonÆs (BHPB) Yandi ore deposit is a channel iron deposit (CID) in the Pilbara district of WA. The ore is predominantly a goethite-hematite pisolite and overlays a clay at the base of the depo
Jan 1, 2002