Queensland’s open cut coalmine void rehabilitation planning practices – challenges and opportunitiesBy M Clay, J Dunlop
Thermal and metallurgical coal mining in Queensland has resulted in mines which contain voids due to open cut mining. While there are several proposals for greenfield coalmines or expansions to existi
Aug 2, 2023
-
Tunnelling Induced Ground Deformations and their Effects on Adjacent PilesBy H G. Poulos
Prediction of ground deformation caused by soft ground tunnelling is an important problem facing design engineers. The ground deformations are caused by the closure of the gap formed around the tunnel
Jan 1, 1999
-
Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation MediBy M Sparrow
The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun
Mar 8, 2011
-
Challenges within the minerals industry R&D landscape in AustraliaBy P Revell, A Jenkin
This paper presents an analysis of significant Australian-based R&D programs focussed on the minerals industry, which was commissioned by CRC ORE. The landscape analysis may assist organisations with
Nov 10, 2020
-
When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample PreparationBy J Webb
"It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i
Jul 29, 2014
-
New sensor development for hydrocyclone overflow particle cumulative percent passing size online monitoring – a preliminary experimental investigation under dry conditionBy L Yang, L Chen, E Hu, D Tang
Online monitoring of particles cumulative percent passing (PCPP) for a target size at hydrocyclone overflow, compared with traditional offline methods, provides PCPP feedback in real time, and is adva
Aug 24, 2022
-
Development of Innovative, Eco-Friendly and Economic Technologies for Wealth Processing at Hindustan Zinc Limited, VisakhapatnamHindustan Zinc Limited (HZL) is one of the leading base metal producers in India. It operates a two-smelter Complex at Visakhapatnam, Andhra Pradesh. At this zinc-lead smelter zinc is manufactured by
Jan 1, 2000
-
Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock SlopeBy N Khalili, J Zhao, G F. Zhao
Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat
Nov 5, 2014
-
Building Partnerships with Indigenous People to Improve their Economic Circumstances to Achieve Social Cohesion and Social Licence to Operate û A Case Study of the West Pilbara, AustraliaThe relationships between Aboriginal Traditional Owners and mining companies have often been mired in dispute, particularly since the High Court Mabo decision and the Native Title Act of 1993. In the
Jan 1, 2009
-
Determining the properties of CaO-Al2O3-SiO2 slags from molecular dynamics simulationBy M Zhu, J Safarian
Understanding the slag composition-structure-property relationship remains challenging due to the amorphous nature of slag melts and the difficulty of high-temperature experimental investigations. Sin
Aug 21, 2024
-
Numerical Modelling of Unsaturated Flow in Uniform and Heterogeneous Waste Rock PilesBy B BussiFre, J Molson, M Aubertin, G W. Wils
Waste rock piles containing reactive sulfide minerals can serve as long-term sources of acid mine drainage (AMD). Within these piles, many physical, geochemical and biological processes can contribute
Jan 1, 2003
-
South Deep ù The ChallengesOver years of exploration the massive and tabular orebodies in the area to the South West of Western Areas Gold Mine had been assessed as containing about 50 million ounces of gold û a world class ore
Jan 1, 2002
-
Reclaimed Lignite Mining Areas A73 in Lusatia - Development of Soil Physical Parameters of an Agricultural Site within the First Years after Site ReconstructionBy J Krnmmelbein, T Raab
In Lusatia, lignite mining causes major disturbances on the landscape scale. Reclamation procedures are applied to recover the reconstructed landscape for different land use options. In this study we
Jul 10, 2012
-
Settling Pond Design and Construction for the Malvern Hills Coal Project, CanterburyThe Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very
Jan 1, 2003
-
Open Stoping with Associated Caving at Mount LyellUnderground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce
Jan 1, 1982
-
Silica Control During Zinc Calcine Leacing at Cominco's Trail OperationsBy Jankola W. A, Delong O. J
Historically, the silica content of zinc concentrates treated at Cominco's Trail Operations has been low. Silica in the roaster calcine seldom exceeded 1.5 per cent because of the low silica co
Jan 1, 1993
-
Social Factors That Are Essential for a New Type of EngineerProfessional engineers of today require a wide array of experience and knowledge. It is true that commonly engineering degrees do teach the technical requirements well, but do fall short in the way of
Jan 1, 2004
-
Getting Value From R&DNew knowledge has no economic value unless it can be applied, or æcapturedÆ, as the R&D jargon has it. Australia probably spends more than $500 m per year on mineral industry R&D, distributed amongst
Jan 1, 1998
-
Ionic structure analysis of relaxed surface of molten oxide slags for surface tension modellingBy M Suzuki
Although several models for the surface tension of molten oxide slag have been proposed, suitably accurate predictions of this property are not yet possible. The surface tension, or surface excess fre
Aug 21, 2024
-
Simulating Mine Backfill in a Fully Drained Condition Using Discrete Element ModellingBy A Karrech, A Hasan
This paper presents the numerical simulation of mine backfilling in underground stopes using three-dimensional discrete element modelling (DEM). The simulation predicts the forces exerted at the stope
Nov 5, 2014