Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design of Carbon-in-Pulp Plants

    The efficient design of carbon-in-pulp (C.I.P.) plants involves the integration of both process engineering and design engineering.Many recently constructed plants have not recognised the above interr

    Jan 1, 1986

  • AUSIMM
    Extractive Companies, Development and Environmental Agendas

    By B Harvey

    Achieving community and stakeholder endorsement during life-of-mine planning and implementation requires a business-connected approach, as opposed to charitable giving, disconnected offsets and enviro

    Jul 16, 2014

  • AUSIMM
    Mechanical Excavation for the Tunnels in Soft Rock

    By Inoue T, Takahashi N

    To construct the accessing railroad line to the northern portal of Seikan Undersea Tunnel, nine tunnels amounting 7.4km in their total length were excavated through soft mudstones of young- er tert

    Jan 1, 1987

  • AUSIMM
    Tailings Disposal Costs ù The Hidden Design Parameter

    The purpose of this paper is to look at the costs of tailings disposal, and in particular the comparative costs of different disposal methods in different situations. Costs are often the hidden design

    Jan 1, 2000

  • AUSIMM
    Stockman Base Metals Project – Sustainability, Social Licence to Operate and Permitting Lessons Learnt

    By R Jacobs, J Yeates

    "The Stockman base metals project is situated in State Forest in the alpine area of East Gippsland, Victoria, adjacent to a National Park and within the headwaters of a major Ramsar-listed wetland cat

    Mar 8, 2016

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Three-dimensional modelling and analysis of high-speed train-induced building vibration considering different soil types

    By O Kirtel, A A. Faizan

    With the rapid increase and development of high-speed trains (HSTs), the problems such as train-induced ground vibration and its dynamic effects on nearby structures have become a major environmental

    Nov 29, 2022

  • AUSIMM
    The Artificial Ventilation of the Broken Hill Proprietary Mine, N.S.W.

    UNLIKE coal mines, in which some form of artificial ventilation is rendered necessary by gases given off by the material mined and is also enforced by the mining laws of all countries, metalliferous m

    Jan 1, 1921

  • AUSIMM
    Selecting and Implementing the Right Technology

    The selection and implementation of the right technology for a project is critical to the future development of the resource industry. It is essential for companies to ensure ongoing competitive viabi

    Jan 1, 2006

  • AUSIMM
    The Evaluation of the Mining Aspects of Coal Projects

    The basic model for the evaluation of any coal-bearing property is the cash flow projection, the major components of which are operating costs, capital charges, taxation and revenue. A range of cash

    Jan 1, 1975

  • AUSIMM
    Future skills and workforce evolution – training and skills development for mining operation engineer and drill and blast engineer in surface mineral mine PT Indo Muro Kencan

    By H Utama, R Heryadi

    PT Indo Muro Kencana (PT IMK) is a surface gold and silver mine located in Mt. Muro area, Central Kalimantan province, Indonesia. The mining operations of multiple open pits using combination of excav

    Sep 1, 2024

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Project Evaluation and Valuation – An Investor’s Golden Rule

    By L I. Rozman

    "There have always been development projects that fall short of expectations. In the last decade, we have seen more than the usual number of mining and oil/gas development projects taking significantl

    Mar 8, 2016

  • AUSIMM
    A Comparative Study of Rock, Soil and Plant Chemistry in Relation to Nickel Mineralization in the Pioneer Area, Wester Australia

    By Smith F. A, Both R. A

    The application of biogeochemical methods in mineral exploration in the semi-arid to and environment of Western Australia was investiga- ted in an area near Norseman. The reliability of these method

    Jan 1, 1973

  • AUSIMM
    Nature and Origin of West Australian Diamonds: Evidence from Mineral Inclusions and C-Isotopic Compositions.

    By Foudoulis C, Smith CB, Drew RM, Sun S-S, Sheraton JW, Hall AE

    Primay (syngenetic and protogenetic) inclusions - i.e. minerals formed during or before diamond growth and encapsulated in the diamond - provide important information on the origin of diamond. Rece

    Jan 1, 1989

  • AUSIMM
    Coal - Paper No. 10 Type Seam Sequences For Some Permian Australian Coals

    Standard petrographic profiles for many Permian seams from New South Wales and Queensland have been drawn up. The standard profiles of seams of the same age and from one or more coalfields were use

    Jan 1, 1969

  • AUSIMM
    Deep Paste Thickening Systems

    By F Schoenbrunn, T Laros

    Deep paste thickeners have been proven capable of consistently producing medium to low slump material for disposal without the need for filters. However, proper design of the entire system is critical

    Jan 1, 1998

  • AUSIMM
    On equitable distribution of mining wealth and the social licence to operate imperative – an African case study

    By S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield

    The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect

    Nov 21, 2018

  • AUSIMM
    Open Pit to Underground ù Transition and Interaction

    By P J. Terbrugge

    Many ore deposits have considerable vertical extent which is not always known at the time of commencement of mining. In many of these cases, initial mining is by opencast methods, and as ore reserves

    Jan 1, 2000

  • AUSIMM
    Transition to Sulphide Treatment - Laboratory Testwork to Operations

    As the oxide reserves in an oxide/sulphide deposit are exhausted transition to the treatment of sulphides should be investigated in detail and well before processing the sulphide ore commences. The

    Jan 1, 1989