Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control

    By A Price, D Okle, K Brooks

    The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di

    Aug 29, 2018

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Mathematical and Physical Simulation of Non-Uniform Liquid Drainage in Packed Beds

    By Pinczewski WV, Nowak LP, Tanzil WBU, Jenkins DR, McCarthy MJ

    An experimental and theoretical study has been made of the drainage behaviour of two-dimensional packed beds drained from an outlet in the sidewall of the bed in order to identify the fundamental m

    Jan 1, 1981

  • AUSIMM
    PanAust Limited’s approach to mine waste and tailings stewardship

    By L P. Trout, D G. Reid

    PanAust Limited (PanAust) has successfully constructed and commissioned two mining operations in Lao PDR over the past decade and undertaken major studies for three new mine developments. The managem

    Jul 23, 2018

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    The Changing Commodity Supply Demand and Price Outlook

    At the outset, I guess we should define what we mean by "com- modities". In the 20 minutes or so which I have for this paper, it is impossible to tackle all commodities -one would need to con- sider

    Jan 1, 1988

  • AUSIMM
    Extending Information from Coal Bore Cores

    A description is given of a detailed examination of a coal bore core and of attempts to predict properties of equivalent "as-mined" coal using the bore core data so obtained. The accuracy of the pr

    Jan 1, 1972

  • AUSIMM
    Quantifying economic and environmental impacts of preconcentration

    By E Amini, M Scott

    Grade Engineering® involves the planning, integration and operation of coarse preconcentration techniques to reject uneconomic material as early as possible in the mining value chain to improve the qu

    Nov 10, 2020

  • AUSIMM
    Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan

    Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha

    Jul 25, 2018

  • AUSIMM
    Improved Jarosite Process

    By BTrubT M

    In the roast-leach-electrolysis process for the production of zinc, iron contained in zinc concentrates is converted to zinc ferrite during roasting. At Canadian Electrolytic Zinc (CEZinc), the Outo

    Jan 1, 1993

  • AUSIMM
    Technology and Changes in Mines Rescue

    As the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati

    Jan 1, 2004

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Your Career ù Are You an Overnight Dot.Com or a Long-Term Growth Option?

    The current boom being experienced by mining, coupled with a shortage of professionals, will mean those in the industry will have many choices. It may be easy to become carried away and run with the h

    Jan 1, 2004

  • AUSIMM
    A Non-Technical Perspective to Collecting Consistent and Representative Samples in the Mining Industry

    There are many compelling reasons why correct sampling schemes should be standard practice in the mining industry, yet there are numerous examples where poor sampling practices are known to exist in t

    Mar 1, 2010

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Comparison of Field Estimated Strengths

    By A Duran

    When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i

    Nov 5, 2014

  • AUSIMM
    Improving coal quality estimations using geostatistics and auxiliary variables

    By P Dowd, R Jeuken, C Xu

    In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty

    Sep 20, 2017

  • AUSIMM
    Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologies

    By E Amini, N Beaton

    Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre

    Nov 10, 2020

  • AUSIMM
    Mathematical Modelling and On-Line Control of Hydrocyclones

    By Eren H

    For a hydrocyclone of fIXed geometry, DC, Di, DO and ? are constants, the variable parameters affecting the performance are Qi, Fi, Du and H. (See Appendix 2 for definition of symbols).The relationshi

    Jan 1, 1990

  • AUSIMM
    The Adsorption and Desorption of Aurocyanide from Activated Carbon

    This monograph presents a unified theory of adsorption and desorption of aurocyanide on activated carbon. This theory has proved useful for CIP/CIL carbon adsorption and Zadra and AARL elution proc

    Jan 1, 1991