Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Integrated Technology Solution for Optimised and Environmentally-controlled Blasts

    By C Parihar, R Garg, A Bhandari, S Bhandari

    Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for

    Aug 24, 2015

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventory

    By J Penman, N Turner, H Liu

    This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s

    Jul 1, 2021

  • AUSIMM
    Is Measuring pH Enough?

    By J Kinal, I Mitchell

    Many flotation plants use pH to adjust the pulp chemistry of their system to achieve optimum separation. For example, in a sequential lead/zinc circuit the pH during sphalerite flotation is increased

    Jan 1, 2006

  • AUSIMM
    Future Trends in the Non-Ferrous Metal Industry of the World

    Between, 1980 and 1984, the demand for non- ferrous metals in the free world grew annually by 1.5 per cent for copper, 0.4 per cent for lead, 1.4 per cent for zinc, and 2.5 per cent for nickel. The

    Jan 1, 1986

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Australia's Coal Industry - Where Will it be in the Year 2000?

    The Australian coal industry has undergone sevenfold growth over the last 30 years and since 1985 has been the world's largest coal exporter. Three quarters of Australia's coal production

    Jan 1, 1988

  • AUSIMM
    Experimental Study on Extinguishing Characteristics of Coal Fire in Confined Space

    By B Wu, B W. Lei, B J. Duan

    When a coalmine fire occurs, it is crucial to judge the developing trends inside the fire area by analysing the changes of gas concentration in order to formulate the proper rescue measures. At presen

    Aug 31, 2015

  • AUSIMM
    A new sampler for grain and other free-flowing particulates

    By G J. Lyman

    Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi

    May 9, 2017

  • AUSIMM
    The Use and Optimisation of Ferrous Feed at the Whyalla Blast Furnace

    By G Caddy, M Middleton, S Kerec, R Keil, J Tsalapatis

    Arrium’s OneSteel Whyalla Steelworks in South Australia is a fully integrated plant which operates a single blast furnace. The key operational objective has been to maintain high process availability

    Jul 13, 2015

  • AUSIMM
    Aligning Resource Estimates with Mine Planning

    By D Kentwell

    A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma

    Nov 24, 2014

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in Japan

    By D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki

    "Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of

    Nov 5, 2014

  • AUSIMM
    Improved hydration management on Australian mine sites with the MX3 hydration testing system

    By T Kilpatrick

    Managing heat stress on Australian mine sites is a complex and enduring challenge due to the combined and variable contribution of environmental conditions, physical activities, and protective equipme

    May 5, 2022

  • AUSIMM
    Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur Content

    By Z Li, J Pan, D Zhu, W Zhou

    In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing

    Aug 12, 2013

  • AUSIMM
    Processing of Magnetite Iron Ores - Comparing Grinding Options

    By A Jankovic, D David, P Payne

    Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and

    Jan 1, 2009

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998