    Evaluation of Gravity Spirals for Beneficiation of Banded Haematite Jasper Iron Ore of India

    By D R. Venkatesulu, N K. Nanda

    Due to increased production of steel in India, the thrust is now on iron ore producers not only to enhance productivity from existing mines, but to look also into alternative resources, like lean grad

    Jan 1, 2009

  • AUSIMM
    Internalising Ecological Costs in Evaluating and Planning a Mining Project

    By Q Wang

    Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co

    Sep 26, 2011

  • AUSIMM
    Northparkes Mines – Flotation and Planning for the Future

    By G Harbort, D Clarke, D Morgan, C Sola

    Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable

    Sep 1, 2014

  • AUSIMM
    Theory of Safe and Efficient Co-extraction of Coal and Gas and its Applications

    By J-T Zhu, Q-Y Tu, S-L Kong, L Wang, Y-P Cheng, H-Y Liu, Q-L Yang

    China is the largest coal-producing country in the world, while the geological conditions of deep coal mining are extremely complicated with high ground stress, high gas pressure and low permeability,

    Aug 31, 2015

  • AUSIMM
    Laboratory Testing and Stability Analysis of Paste Backfill at the Golden Giant Mine (d53b2c09-d9ab-48b2-94c6-0c6f856d783f)

    By Bawden WF, Paynter JT

    This investigation involves laboratory testing and stability analysis of paste fill at the Golden Giant Mine. Site-cast samples are tested in unconfined, confined, and consolidated-undrained triaxia

    Jan 1, 1998

  • AUSIMM
    Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken Hill

    By G C. Reed, J M. Murray

    During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to

    Jan 1, 2000

  • AUSIMM
    A Statistical Approach for Deriving Project Design Rainfall

    By R Millar

    A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically

    Nov 26, 2013

  • AUSIMM
    Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, Indonesia

    By G W. Swana

    Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis

    Nov 29, 2022

  • AUSIMM
    Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits

    By A Melkumyan, K Silversides

    The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.

    Nov 24, 2014

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Challenges Faced by Narrow Vein Graphite Mining and Influence of Graphite Infill on Wall Stability

    By H S. Welideniya, K Ekanayake

    Carbon rich graphite deposits found in Sri Lanka are of inorganic origin and they occur as narrow steeply dipping veins. The vein width of these deposits varies from a few centimetres to metres, with

    Mar 26, 2012

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • AUSIMM
    Spontaneous Fire Risk Rating of a Colliery Proposed to be Developed by Short Wall Method of Mining

    By Sen S. K, Banerjee D. D, Nandy D. K

    It has been stressed that the intrinsic spon- taneous heating characteristics of a coal is not enough in predicting spontaneous fire risk of a mine. The influence of extraneous conditions created f

    Jan 1, 1988

  • AUSIMM
    Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces Mine

    By R M. Arellano, D M. W Harney, M Makhuvha

    Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous

    Aug 18, 2014

  • AUSIMM
    A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing Plant

    By S Döpp

    Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during

    Jul 11, 2011

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore Mine

    By B Yeganeh, A Sam, A Kohsari

    The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa

    Jan 1, 2007

  • AUSIMM
    Impurity capacities of non-ferrous slags

    By R G. Reddy

    The complexity in treating environmentally harmful impurities such as As, Sb, Bi from the base metal matte or metal in the smelting stage are responsible for the high cost of the refining process. The

    Aug 21, 2024

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis