Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    The Design and Operation of a New Ventilation System at the Zinc Corporation Limited and New Broken Hill Consolidated Limited

    In 1948, it became clear that the ventilation system of The Zinc Corporation Limited and New Broken Hill Consolidated Limited mines, would be inadequate for future operations. The,paper describes in d

    Jan 1, 1956

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011

  • AUSIMM
    Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, Canada

    By J Millard, K Sexsmith

    BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb

    Jan 1, 2003

  • AUSIMM
    Analytical Fingerprint of Columbite-Tantalite (Coltan) Mineralisation in Pegmatites - Focus on Africa

    By A Gerdes, H BrStz, E GSbler, D Davis, F Henjes-Kunst, S Dewaele, T Graupner, T Oberthnr, M Sitnikova

    Following the United Nations initiative to fingerprint the origin of conflict materials, the German Federal Ministry for Economic Cooperation and Development has decided to fund a pilot study on colta

    Jan 1, 2008

  • AUSIMM
    Hydrotermal Alteration Zones and Sulphur Deposits in Upper Cenozoic Vocanoes of Salar De Gorbea, Andes of Northern Chile

    The segment of the Upper Cenozoic volcanic chain (CVZ) located on the western border of South America (16-28¦S lat.) is constituted by an association of strato- volcanoes and ignimbrite sheets, with

    Jan 1, 1987

  • AUSIMM
    The Gold-Rich Dizon Porphyry Copper Mine in the Western Central Luzon Island, Philippines: Its Geology and Tectonic Setting

    The Dizon open pit mine of Benguet Corporation in western Central Luzon, Philippines has yielded some 182 000 t copper, and about 26 000 kg gold and 48 000 kg silver as by products since it starte

    Jan 1, 1987

  • AUSIMM
    A Geological Review of the Tampakan Copper-Gold Deposit, Southern Mindanao, Philippines

    By B Rohrlach, J Gonzalez, A Buenavista

    Located on the island of Mindanao in the Southern Philippines, the Tampakan copper-gold deposit represents a major high-sulfidation epithermal deposit superimposed on an underlying porphyry copper sys

    Jan 1, 2004

  • AUSIMM
    Musselwhite Mine - The History of a Giant Gold Deposit

    By A Cheatle

    GoldcorpÆs Musselwhite mine in north-western Ontario, Canada has in recent years become a world-class deposit. Initially discovered in the early 1960s by Alan and Harold Musselwhite, the then marginal

    Jan 1, 2009

  • AUSIMM
    Performance of Mono-Layer Evapotranspirative Covers in Response to High Precipitation and Extended Drought Periods in the Southwestern United States

    By Tzung-mow Yao, S Ki, J Word, J Vinson

    Properly designed evapotranspirative (ET) cover systems can greatly reduce the amount of infiltration and groundwater recharge (deep percolation) into potential acid generating mine waste. In arid and

    Jan 1, 2003

  • AUSIMM
    Raiseboring Experience with the Wirth Two Stage Sequential Reaming Head and HG330 Raiseborer

    By Fletcher A. E W

    Ever since it made its debut in 1962, in the form of a Robbins 31R, the raiseborer has become an accepted tool in the mining and civil construction industries. The first raiseborer to be used in th

    Jan 1, 1987

  • AUSIMM
    Coal as a Source Rock for Hydrocarbon Gas in the Aldebaran Sandstone, Denison Trough, Bowen Basin - Geochemical Evidence

    By Golding S. D, Price P. L

    The Early Permian Aldebaran Sandstone is the main hydrocarbon reservoir in the Denison Trough. Contained hydrocarbon gas has a wet gas index (C1/CI - C4) of between 0.87 and 0.97 (N=10), and consti

    Jan 1, 1991

  • AUSIMM
    Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently

    Jan 1, 1924

  • AUSIMM
    Developments in Steel Recycling Technology

    By Y Pan

    The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc

    Jan 1, 2004

  • AUSIMM
    Back to basics: resourcing the mining industry

    By S Dunbar, S Harrison, J Cilliers

    ‘Those who cannot remember the past are condemned to repeat it.’George Santayana (16 December 1863 in Madrid, Spain to 26 September 1952 in Rome, Italy). Philosopher, essayist, poet and novelist.The m

    Aug 29, 2018

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    Reverse stoping using wireless initiation at CSA Mine

    By B Small

    CSA Mine, named after the nationalities of the mines first owners being Cornish, Scottish, Australian, is one of Australia’s deepest and highest-grade copper mines. A combination of the modified Avoca

    Mar 29, 2023