Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Summary of Miocene to Recent Conglomerate Provenance and Gold Content and Plate Boundary Tectonics of the West Coast Region

    The West Coast region of the South Island is situated astride the Pacific û Australian plate boundary zone. The most significant component of this zone is the Alpine Fault. A variety of reconstruction

    Jan 1, 1996

  • AUSIMM
    Seafield ResourcesÆ Offshore Alluvial Gold Project, Westland, New Zealand

    By N F. Fraser

    Seafield ResourcesÆ offshore placer gold project covers c.10 000 km2 of the Westland continental shelf between Karamea and Jacksons Head, from the low-water mark out to the 120 m isobath (Figure 1). D

    Jan 1, 2005

  • AUSIMM
    The use of mid-panel ventilation shafts to improve positional cooling efficiency in a Bowen Basin longwall mine – a case study

    By D Brouwer, P Wild, B Belle

    Due to the steep geo-thermal gradient in Bowen Basin area, as underground coalmines reach increased depths of extraction, the Bulk Air Cooling (BAC) requirements will increase as opposed to cooling th

    Aug 28, 2017

  • AUSIMM
    Geochemistry of Wall Rock Alteration at the Waihi and Favona Epithermal Deposits, New Zealand

    By D N. Castendyk, J L. Mauk

    The world-class Waihi (>6.6 Moz Au, >41.8 Moz Ag) and adjacent Favona (>0.5 Moz Au) deposits are within a single volcanic-hosted epithermal Au-Ag district located in the southern Coromandel P

    Jan 1, 2003

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • AUSIMM
    A Team Approach to Optimising a Mining Method - Bench Stoping in the Silver/Lead/Zinc Orebodies at Mount Isa

    By Jarc H

    The steeply dipping silver/lead/zinc orebodies at Mount Isa mine have been extracted most recently by a combination of cut-and-fill and open stoping methods. Bench stoping was first used at Mount Isa

    Jan 1, 1992

  • AUSIMM
    Starting from scratch – defining remnant resources from publicly available data: a case study from the Lord Nelson and Lord Henry gold deposits

    By C Jia, J Graindorge, L M. Olssen

    Picking up abandoned mining tenements and looking to recover remnant resources around old operations is an opportunity that comes with its own challenges and risks. Reliance on information released to

    Sep 20, 2017

  • AUSIMM
    The Metallurgical Development of an Enargite-Bearing Deposit

    The Metallurgical Development of an Enargite-Bearing Deposit

    Sep 13, 2010

  • AUSIMM
    Accelerated degradation and modified slake durability testing of clay mineral-rich coal mine spoil

    By B Miles, D J. Williams, J Ahn, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    What Makes a Corporation Sustainable? The Significance of Integrating Environment, Economic and Social Aspects with Governance and Accountability

    I want to explore whether it is valid or even useful to talk about sustainable corporations. After 20 years of focus on sustainable development, the concept of a sustainable corporation is not particu

    Jan 1, 2002

  • AUSIMM
    Three case studies on the implementation of new technology in the mining industry

    By A T. Job, P R. McAree

    There is significant value at stake in the mining industry from the implementation of new technologies that support the enhanced profitability and sustainability of mines. However, in order to realise

    Jul 24, 2017

  • AUSIMM
    Recovery Process of Carbon Dioxide with Metal Oxides and Metal Hydroxides

    Recovery Process of Carbon Dioxide with Metal Oxides and Metal Hydroxides

    Sep 13, 2010

  • AUSIMM
    The Use of Satellite (Landsat) Imagery in Mineral Exploration

    Remote sensing, in general, is the recording of light and heat from a planet's surface within a certain range of the electromagnetic spectrum. For the Earth, systems capable of this recording are

    Jan 1, 1977

  • AUSIMM
    Beneficiation of Iron Ore - Washing with Surface-Active Agent

    Beneficiation of Iron Ore - Washing with Surface-Active Agent The stability of the dispersed phase in 10 wt per cent slurry of iron ore slime and fines was studied at pH 5 and different concentration

    Sep 13, 2010

  • AUSIMM
    Comparison of Industrial Cyanide Destruction Processes

    Comparison of Industrial Cyanide Destruction Processes

    Sep 13, 2010

  • AUSIMM
    Multiple Source LOTEM Surveys - An Alternative to CSMT Surveys

    By H Bibby

    Initial analysis of Long Offset Time Domain Electromagnetic (LOTEM) data has traditionally been made in terms of early and late time apparent resistivities. By using more than one grounded bipole as a

    Jan 1, 1996

  • AUSIMM
    Longwall Automation ù An ACARP Landmark Project

    By P Lever, D Hainsworth, H Gurgenci

    The ACARP Landmark initiative has created the opportunity to advance the level of automation in the coal industry by first focusing on the core production area of longwall mining. A Landmark Longwall

    Jan 1, 2002

  • AUSIMM
    Stockton Mine Acid Rock Drainage Remediation û Part 2 - Treatment

    By P Lindsay, J B. Hughes

    Underground and opencast coal mining has been ongoing since 1896 on the Stockton Plateau, West Coast, New Zealand. Acid Rock Drainage (ARD) from historic and current mine workings has had an adverse e

    Jan 1, 2007

  • AUSIMM
    Golden Cross Mine Rehabilitation Update - September 2000

    By A Goldstone, T Maton

    The Golden Cross Mine is located on the North Island of New Zealand, at the base of the Coromandel Peninsula, approximately 8 km northwest of Waihi. The project is operated as a Joint Venture with Coe

    Jan 1, 2000

  • AUSIMM
    Reducing total project cost in the study phase using zero base design

    By J Merrells

    Fluor, together with our clients, has yielded significant reductions in the total cost of mining projects by employing a systematic and methodical process of cost reduction. This paper outlines this s

    Jul 24, 2017