Search Documents

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • TMS
    The Use of Diagnostic Leaching for Flotation Insight

    By Kymberley Worrell

    The Cripple Creek and Victor Gold Mine was acquired by Newmont in August 2015. The high grade flotation mill project was commissioned in February 2014. The mill to date has been throughput limited due

  • AUSIMM
    Research on Reduction-Magnetic Separation of Bayan Obo Ore

    Research on Reduction-Magnetic Separation of Bayan Obo Ore

    Sep 13, 2010

  • NIOSH
    Statistical Summary (580de21b-2604-4307-aa8c-299f16e3b0f9)

    By Rose L. Ballard

    This chapter summarizes data on crude nonfuel mineral production for the United States, its island possessions, and the Commonwealth of Puerto Rico. Included also are the tables that show the principa

    Jan 1, 1983

  • IIMP
    Punto de equilibrio, herramienta de toma de decisiones en operaciones mineras

    By Armando Díaz

    Anteriormente, el objetivo de las organizaciones empresariales era la optimización de los procesos productivos a través de una limitada eficiencia en el mercado. Sin embargo, esta situación ha cambiad

    Sep 13, 2001

  • AUSIMM
    Minimising Mineral Project Risk - New Zealand in a Global Context

    Mining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat

    Jan 1, 2005

  • NIOSH
    RI 3813 Equilibrium in the Reduction of Ferrous Chromite by Hydrogen and Energy Requirements in the Selective Reduction of Iron in Chromite

    By W. M. Bangert, F. S. Boericke

    "INTRODUCTION Determination of the thermodynamic properties of metallurgically important compounds of chromium has been one of the activities of the Pacific Experiment Station of the Bureau of Mines.

    Jun 1, 1945

  • SME
    Longwall Control At Shoal Creek

    By Debasis Deb

    The first version of the longwall strata control and maintenance system (LSCMS) has been successfully developed by the Strata Control Re¬search Team at the University of Alabama. The system includes a

    Jan 1, 1997

  • SME
    Small footprint, big challenges: Design and construction of the Allen Park storage tunnel

    By Brain E. Gombos

    The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary

    Jan 1, 2013

  • ABM
    Reliability Study Of Cold Mill Motors At Arcelormittal Vega

    By Ernesto Furtado de Mello Neto, Eliezer Thuler, Claudio Vano Nunes, Carlos Alberto Cristofari

    The Brazilian steel industry is dealing an adverse scenario with direct competition from global emerging markets. In this scenario, the need to improve asset operational performance, makes complex stu

    Oct 9, 2019

  • CIM
    Fine Grinding with the Szego Mill - An Update

    By G. Papachristodoulou, O. Trass

    "Performance data for both wet and dry grinding of materials have been obtained in this novel, planetary ring-roller mill over wide ranges or operating conditions. The Szego mill consists of a station

    Jan 1, 1986

  • NIOSH
    OFR-131-83 Safety And Health In Underground Mine Waste Disposal

    By J. P. Schmid

    Results of a comprehensive investigation of the impact of underground mine waste disposal on the health and safety of miners are presented. Information was gathered through an extensive search of Amer

    Jan 1, 1982

  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • ISEE
    Airblast Control Techniques in Open Cut Mines

    By Alan: Moore Richards

    Effective control of airblast requires that significant factors be identified and satisfied by blast design and careful implementation. Significant factors include charge mass, distance, face height a

    Jan 1, 2006

  • CIM
    Cable Shovel Simulation leading to A Novel Dipper Design

    By Ning Shi

    This paper suggests an alternative design approach for an innovative shovel dipper, for use in ground conditions where cutting of virgin ground rather than scooping of blasted material is required. No

    May 1, 2004

  • NIOSH
    IC 8392 Horizontal Boring Technology: A State-Of-The-Art Study

    By James Paone

    This report on the state of the art of horizontal boring technology for underground power transmission installations was prepared by the Bureau of Mines at the request of the Department of the Interio

    Jan 1, 1968

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • AUSIMM
    The Base Metal Mineral Potential of New Zealand as Related to Tectonism and Metamorphism

    An understanding of the origin of mineral deposits and their relationship to local and global geotectonics is essential if regional targets for mineral exploration are to be chosen. Volcanism, metamor

    Jan 1, 1976

  • SME
    Medium-Temperature Pressure Leaching Of Copper Concentrates - Part I: Chemistry And Initial Process Development

    By J. O. Marsden

    Over the past eight years, Phelps Dodge (a subsidiary of Freeport-McMoRan Copper & Gold, Inc.) devoted a significant amount of effort to the development of a suite of processes for the effective hydro

    Jan 1, 2007

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003