Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Design, Commissioning And Operation Of The Castle Valley Plant In Wellington, UtBy P. J. Bethell
Background Increasingly complex geological conditions, with the presence of high ash binders in the mining horizon were encountered at the A.C. I. Dugout Mine near Price, Utah. This led to the prod
Jan 1, 2008
-
IC 8106 Research And Technologic Work On Explosives, Explosions, And Flames: Fiscal Year 1960 ? IntroductionBy Ruth F. Brinkley
This circular describes the activities and publications of the Bureau of Mines, Explosives Research Laboratory4 for the fiscal year 1960 (July 1, 1959 -June 30, 1960). Part 1 describes briefly the
Jan 1, 1962
-
Human Vibration Levels In The South African Mining IndustryBy J. L. van Niekerk
The research project reported on represents the first comprehensive attempt to measure the vibration levels of a variety of tools and equipment in the South African mining industry to determine the ef
Jan 1, 2000
-
Mechanisms Of Large Seismic Events In Platinum Mines Of The Bushveld Complex (South Africa) ? SynopsisBy D. Malovichko
Seismic events and pillar failures observed in two platinum mines in the Rustenburg area, South Africa, were investigated. We studied the sources of approximately 300 largest seismic events recorded i
Jan 1, 2012
-
Improved Pile Economics: High Design Stresses And Remote Pile TestingBy Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Utilization of voids for development and gas generation following waste disposalBy J. A. Every-Brown
Case studies are presented of three derelict sites in Kent and Essex that provide a good cross-section of opportunities for second-generation commercial uses of former chalk, limestone, clay and grave
Aug 1, 1994
-
Spectroelectrochemistry Of Enargite I: Reactivity In Alkaline SolutionsBy R. N. Gow
The presence of enargite (Cu3AsS4) is problematic in gold processing because it is environmentally hazardous due to its arsenic content but also because it is double refractory causing both cyanide an
Feb 27, 2013
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load TestsBy Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Numerical Expansion Analyses of the Strategic Petroleum Reserve in Bayou Choctaw Salt Dome, USABy B. Y. Park
This paper develops a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert of one of the
May 1, 2009
-
Millpebs Testing at Brunswick ConcentratorBy Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper
"The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr
Jan 1, 2006
-
RI 7173 A Petrofabric Study Of Tectonic And Mining-Induced Deformations In A Deep MineBy Elbridge W. Gresseth
Rock deformational structures in a deep mine were analyzed by petrofabric techniques to learn (1) the relative magnitude and direction of the principal stresses involved in tectonic deformations prior
Jan 1, 1968
-
A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West VirginiaBy R. B. Alke
Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o
Jan 1, 1984
-
OFR-54-75 Design, Develop, Fabricate, Test, And Demonstrate Permissible Low Cost Cylindrical Stress Gages And Associated Components Capable Of Measuring Change Of Stress As A Function Of Time In Underground Coal Mines. ? 1. IntroductionBy Ivor Hawkes
The purpose of the development described in this report and as stated in the contract work statement is to "design, develop, fabricate, test and demonstrate, and deliver to the government permissible
Jan 1, 1973
-
Metodología de Planificación en mina Tambomayo - Cía. De minas BuenaventuraBy Christian Flores
El proceso que se enfrentó en Tambomayo tuvo su principal complejidad en llevar un proyecto en etapa de exploración hacia la construcción de una a unidad productiva la cual permita obtener resultados
Sep 1, 2017
-
Cresson Mine Completes Two-Year ExpansionBy William R. Yernberg
The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini
Jan 1, 2002
-
Virtual Reality In Mine Training (3eb7dfa5-08f9-4834-9597-81542b7b8eb6)By R. Unger, L. Mallett
The use of virtual reality (VR) technologies to train miners is an evolving area in research and development. In July 2006, representatives of 14 international organizations met to discuss current VR-
Jan 1, 2007
-
Life-Of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine (f7fec8ba-f444-4056-8367-98da9f297180)Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate i
Jan 1, 2014
-
The Politics of Mining in New ZealandBy R Tweedie
'The politics of mining in New Zealand' is a topic I chose myself because of its importance in the future of the New Zealand mining industry. There are many people in the industry who are cy
Jan 1, 1991
-
Extensive Mechanization Produces Record Performance In Drill-Blast TunnellingBy Hans Hamrin
Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed
Jan 1, 1987
-
Reclamation of Coal Mine Wastes in New BrunswickThe major factors limiting the establishing of vegetation on the shale and sandstone wastes at Minto are high exchange acidity and low pH (shale pH 4-5, sandstone pH < 4). In the first revegetation pr
Jan 1, 1977