Search Documents

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • NIOSH
    IC 8308 Research And Technologic Work On Explosives, Explosions, And Flames: Fiscal Year 1965 ? Introduction (fc6ec9d2-37f0-451f-a85a-5afcc31c5e11)

    Major activities of the Bureau of Mines Explosives Research Center during fiscal year 1965 (July 1, 1964, to June 30, 1965) are reviewed briefly. Part 1 summarizes significant accomplishments of the p

    Jan 1, 1966

  • SME
    Toward Open-Source Hardware and Software for the Mining Industry: a Case Study of Low-Cost Environmental Monitoring System for Non-Metallic Underground Mines Mining, Metallurgy and Exploration

    By Mokhinabonu Mardonova, Yosoon Choi

    Open-source technology for supporting the Industry 4.0 has become the target of academic research in many sectors. This study reviewed the trends of open-source technology, its forms, and some industr

  • SME
    Toward Open-Source Hardware and Software for the Mining Industry: a Case Study of Low-Cost Environmental Monitoring System for Non-Metallic Underground Mines Mining, Metallurgy and Exploration (3a9c5e4e-b387-4996-946a-2dab73f8a3f7)

    By Mokhinabonu Mardonova, Yosoon Choi

    Open-source technology for supporting the Industry 4.0 has become the target of academic research in many sectors. This study reviewed the trends of open-source technology, its forms, and some industr

  • CIM
    The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches

    By A. Boucher, D. Marcotte

    "Abstract- The accepted practice for the estimation of thin (2D) vein deposits recommends the use of the grade x thickness service variable (i.e., the accumulation). Grade estimates are obtained indir

    Jan 1, 2001

  • CIM
    Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case history

    By A. Philipp, A. S. Middleton, G. A. Harron, A. B. Durham

    "Basal till sampling techniques were used to search for gold mineralization in the Timmins, Ontario area. During 1978 and 1979, approximately 90 overburden sampling drill holes were completed in Murph

    Jan 1, 1987

  • SME
    Shaft Sinking on the MetroWest Water Supply Tunnel Project

    By A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson

    The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f

    Jan 1, 1999

  • AIME
    Manganese as a Nonferrous Metal (823e69d5-87d2-451e-9729-b39c4ffc64c5)

    By Reginald S., Dean

    The commercial availability of electrolytic manganese has greatly changed the position of manganese as a nonferrous alloying metal. Manganese metal commercially available up to about ten years ago was

    Jan 1, 1953

  • CIM
    Effects of blasting on damage and grindability of impacted rock

    By C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen

    A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and

    Jan 1, 2006

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • NIOSH
    Mineral Resource Investigations Of Selected Roadless Areas In Idaho National Forests ? Introduction

    By Ronald B. Stotelmeyer

    This report summarizes studies of 55 Idaho national forest roadless areas completed by the U.S. Bureau of Mines (USBM) in the period 1966-1992. These roadless areas have been recommended for addition

    Jan 1, 1994

  • AUSIMM
    The Hydraulic Transportation of Sands

    Factors leading to the necessity for some individual testwork in solving most specific hydraulic transportation problems are listed and a description is given of a method used in determining critical

    Jan 1, 1959

  • NIOSH
    IC 6611 Small-Scale Placer-Mining Methods ? Introduction

    By Chas. F. Jackson

    During the current business depression the Bureau of Mines has received many inquiries concerning placer mining, the prospects for men of small means to make wages by small-scale placer operations, th

    Jan 1, 1932

  • CIM
    Beneficiation of Oolitic Iron Ores

    By K. Peake, A. Dalvi, V. Hernandez, S. Chang, M. Oliazadeh

    "Ironstone Resources Ltd. is developing the Clear Hills oolitic iron ore deposit in northwest Alberta, Canada. Sources of oolitic iron ore worldwide are abundant and ubiquitous, but there is currently

    Jan 1, 2014

  • ISEE
    The Evaluation of Explosives Performance: an End Users Point of View

    By N T. Moxon, L W. Armstrong

    Explosive manufacturers have for many years provided a service to the mining industry which has,until recently, been unchallenged by mine operators. Today mine operators are more aware of the properti

    Jan 1, 1991

  • SME
    Excess Spoil Minimization And Fill Stability

    By M. Superfesky, P. Michael

    Introduction The US Office of Surface Mining (OSM) is proposing changes to the Code of Federal Regulations in the interest of minimizing the adverse effects of excess-spoil-fill construction on the

    Jan 1, 2007

  • CIM
    Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities

    By Ian Bruce

    Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp

    May 1, 2002

  • NIOSH
    OFR-54-(3)77 Exploration Of Illumination Concepts For Underground Coal Mines - Appendix E - Electronic Ballast For The Lucalox High Pressure Sodium Lamp

    This report, authorized by a subcontract with the Crouse-Hinds Company per Section 1.1.3b of Contract Number H0220065 Amendment Number Six, and the consent of the Contracting Officer, documents the re

    Jan 1, 1976

  • NIOSH
    RI 6946 An Economic And Technical Evaluation Of Magnesium Production Methods (In Three Parts) 2. Carbothermic

    By D. A. Elkins

    This report is the second of a series of three that will evaluate, in order, the metallothermic, carbothermic, and electrolytic methods of magnesium production. The historical development of the carbo

    Jan 1, 1967

  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017