Search Documents

  • DFI
    An Innovative Approach To Load Testing Of High Capacity Piles

    By P. Bermingham

    A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma

    Jan 1, 1989

  • SME
    Pushing The Limits Of Gravity Separation

    By Claude Deveau, Stephen R. Young

    Introduction Tanco History Tanco is sometimes known as the Bernic Lake Mine. It is located about 180 km east-northeast of Winnipeg close to the Manitoba-Ontario boundary. Tanco operates an undergr

    Jan 1, 2005

  • NIOSH
    OFR-62-92 Mineral Diversity In The California Desert Conservation Area ? Introduction

    By Phillip R. Moyle

    A basic precept in mineral exploration is that the best places to prospect are where minerals have already been found. The California desert has many old mining districts once thought to be "played ou

    Jan 1, 1992

  • DFI
    Geotechnical Design and Performance of Road and Railway Viaducts Supported on DSM Columns - A Summary of Practice

    By Michal Topolnicki

    "Discussed is the use of wet Deep Soil Mixing, generally executed with single mixing tools 0.8 to 1.6m in diameter, employed in the foundation of viaduct supports. The applications involve economical

    Jan 1, 2015

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • SME-ICGCM
    Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia

    By Takashi Sasaoka

    The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th

    Jan 1, 2008

  • AUSIMM
    The Phytoremediation and Phytomining of Heavy Metals

    By B R, R Brooks, R Simcock, R Stewart

    As environmental costs incurred by the mining industry become increasingly subject to critical analysis, new technology is necessary to ensure the further development of good relationships between the

    Jan 1, 1999

  • SME
    Prediction of Blast‑Induced Ground Vibration Using Principal Component Analysis–Based Classification and Logarithmic Regression Technique

    By M. P. Roy, P. K. Singh, A. K. Mishra, Ashish K. Vishwakarma, Vivek K. Himanshu

    Ground vibration is one of the major hazards produced by rock-blasting operation. The accurate prediction of vibration is necessary for designing controlled blasting parameters. The existing vibration

    Jul 30, 2022

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • SME
    The Need For Innovation In Arid Land Reclamation

    By S. Grogan

    Next year marks the tenth anniversary of the Surface Mining Control and Reclamation Act (SMCRA). As the U.S. coal industry scrambles to cope with serious economic difficulties, it is appropriate to ex

    Jan 1, 1986

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • SAIMM
    Climate impacts of fossil fuels in today’s electricity systems

    By L. Schernikau, W. H. Smith

    Oil, coal, and gas account for approximately 80% of global primary energy, but only a portion of total airborne CO2 eq (approx. 35% at GWP20 to 65% at GWP100), even though they account for 95% of tota

    Mar 2, 2022

  • CIM
    Gîtes de wollastonite, province tectonique de Grenville, Quebec

    By G. J. Simandl, H. -L. Jacob, S. Paradis, G. Valiquette

    "Nos travaux de terrain dans le Grenville, effectués dans le cadre d'un projet d'inventaire des gîtes de wollastonite, ont démontré qu'il existe un secteur exceptionnellement favorable

    Jan 1, 1990

  • SAIMM
    Optimizing LHD Utilization ? Synopsis

    By D. Mkhwanazi

    The purpose of the project was to optimize load haul dump (LHD) machinery use as they were spending too much time doing what they should not be doing. During the investigation, the author found that t

    Jan 1, 2011

  • SME-ICGCM
    In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United Kingdom

    By Paul N. Freeman

    This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe

    Jan 1, 1992

  • SME
    Discussion - Shaft Sinking Today– A Boring Business Tomorrow - Technical Papers, MINING ENGINEERINS, Vol 33, No, 12 Dec. 1981, PP. 1705-1710

    By Maurice Grieves

    GC. Waterman Mr. Grieves' paper on "Shaft Sinking Today--A Boring Business Tomorrow" in the Dec. 1981 issue of MINING ENGINEERING is an excellent description of recent improvements in speed an

    Jan 3, 1983

  • AUSIMM
    Arc Exploration from the Hydrothermal Plume Perspective

    By C E. J de Ronde, I C. Wright

    Oceanic subduction-related volcanic frontal arcs extend over 20 000 km within the western Pacific basin and over 21 500 km worldwide, yet they remain largely unexplored with respect to active seafloor

    Jan 1, 2002

  • CIM
    Demonstrations and Discussion on Geophysical Methods of Prospecting: The Electromagnetic Method

    By Etienne S. Bieler

    Mr. Chairman, Ladies and Gentlemen, I come to you tonight distinctly as a physicist, not as a geologist or a mining man. My experience in applied geophysics has been short, and I do not doubt that man

    Jan 1, 1928

  • AIME
    Reservoir Performance - Field Studies - Production of Oil Under Unitization in the Wertz Dome Field, Wyoming

    By E. A. Swedenborg

    The unit agreement for the Wertz Dome field, Wyoming, was approved by the Acting Secretary of the United States Department of the Interior on November 4, 1937, effective on December 1, 1937. The state

    Jan 1, 1949

  • AIME
    Reservoir Performance - Field Studies - Production of Oil Under Unitization in the Wertz Dome Field, Wyoming

    By E. A. Swedenborg

    The unit agreement for the Wertz Dome field, Wyoming, was approved by the Acting Secretary of the United States Department of the Interior on November 4, 1937, effective on December 1, 1937. The state

    Jan 1, 1949