Search Documents

  • CIM
    Tailings Disposal at Kidd Creek Mines Ltd.

    By T. J. Yeomans

    "The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi

    Jan 1, 1986

  • SME
    An Integration Of Long-Term Mine Planning, Tailings And Reclamation Plans

    Oil sands processing generates huge volumes of slurry, known as tailings, that is being stored in tailings ponds. The volume of produced tailings is a very important factor in oil sands surface mine p

    Feb 27, 2013

  • SME
    What Will Halt The Worldwide Decline In Mine Equipment Performance?

    By R. Adsero

    The analysis of equipment trends in AUSIMM?s Revision of Monograph 19; Australasian Mining and Metallurgy Operating Practices (AMMOP) in the paper by Dight et al (in press) raised some interesting and

    Feb 27, 2013

  • NIOSH
    OFR-108-77 The Effect Of Organizational Climate And Policy On Coal Mine Safety

    By Mark S. Sanders

    The present study was designed to explore the contribution of organizational climate and management practices to the injury experience in underground coal mines. A cross-lagged panel design was used i

    Jan 1, 1976

  • SME
    Earthquake Engineering Of Tunnels - Revisited

    By G. Norman Owen, Roger E. Scholl

    INTRODUCTION The analysis and design of underground structures to resist vibratory motion due to earthquakes has been of interest to engineers for several decades. The dynamic stability of a powerh

    Jan 1, 1985

  • AUSIMM
    The Thalanga Massive Sulphide Deposit

    By Hartley JS, Wills KJA

    The Thalanga massive sulphide deposit is hosted by Upper Cambrian rhyolites and volcaniclastics of the Mt. Windsor Volcanics near their contact with overlying dacites, rhyolites and sediments of t

    Jan 1, 1987

  • AIME
    SME's Annual Membership Report - 1961 Membership Directory

    SME's Annual Membership Report - 1961 Membership Directory

    Jan 7, 1961

  • AUSIMM
    The Effect of Sulphide and Lead on the Rate of Cold Cyanidation

    By Tumilty JA, Schmidt CG

    Sulphide ion is a powerful poison in gold cyanidation, however, the detrimental effect is less severe in plant practice. This is thought to be due to the presence of depassivating elements in the o

    Jan 1, 1989

  • CIM
    Barrick Goldstrike Roaster Facility Dry Grinding and Leach

    By Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen

    "The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the

    Jan 1, 2001

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • AIME
    New Design Concepts For Electric Mining Shovels

    By L. A. Price

    With increased stripping ratios and with dwindling ore content, the mining fraternity is increasingly turning to larger and larger equipment for profitable open pit operations. The availability of hig

    Jan 1, 1970

  • SAIMM
    Recent Developments In The Automation Of Mining Analytical Laboratories For Base Metal Analysis - 1.0 Introduction

    By P. K. Hofmeyr

    Base Metal (Cu, Ni, Mo, Zn, Co etc.) analysis traditionally has been very slow in conventional analytical laboratories which can lead to additional costs being incurred in waiting time of drill rigs o

    Jan 1, 2005

  • CIM
    Continuous Training – Insurance for Sustainable Operation

    By Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala

    Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co

    Jan 1, 2019

  • IOM3
    Risk in minerals project: analysis, perception and management

    Paper presented at the UK minerals industry conference and published in: Minerals extraction towards the millennium. UK minerals industry conference, 3-5 April 1995, University of Leeds. London: Insti

    Jun 19, 1905

  • NIOSH
    IC 6948 Aerial Tramways In The Metal-Mining Industry - Part 1 ? Introduction

    By O. H. Metzger

    This is the first of two papers dealing with construction and use of aerial tramways in the metal-mining industry. It describes practices and equipment used in tramway construction and discusses the d

    Jan 1, 1937

  • SME
    From Planning to Commissioning: A Complete Overview of the Northeast Boundary Tunnel Project - NAT2024

    By Moussa Wone, Jeff Peterson, Filippo Azzarà, Daniele Nebbia

    The DC Water and Sewer Authority's Long Term Control Plan includes tunnels, sewer separation, pumping station rehabilitation and green infrastructure to reduce combined sewer overflow (CSO) discharges

    Jun 23, 2024

  • NIOSH
    RI 6603 Oil Recovery From 17 Water-Injection Projects In Clay, Jack, Montague, And Wise Counties, Tex.

    By Jr. Frank Parrish

    This report describes the performance of 17 selected water-injection projects producing from Pennsylvanian-and Permian-age reservoirs. Illustrations depict reservoir structure and thickness, and produ

    Jan 1, 1965

  • TMS
    The Industrial Non-Cyanide Hydrometallurgical Recovery Of Silver And Gold Utilizing Nitrogen Species Catalyzed Pressure Oxidation

    By Corby G. Anderson

    In the majority of industrial operations recovering gold and silver by hydrometallurgical means, cyanide is the predominant lixiviant. However, as an economic alternative, production of massive quanti

    Jan 1, 1998

  • SME
    Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in Tunneling

    By Remo Grandori

    The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve

    Jan 1, 2001

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014