  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • NIOSH
    RI 4879 Recent Practice At The Bureau Of Mines Boulder City, Nev., Titanium Plant

    By H. C. Fuller

    This paper discusses 105 production runs at Boulder City, Nev., in which titanium metal was made in 200-pound batches. It describes the equipment and techniques used in preparing raw material, the red

    Jan 1, 1952

  • NIOSH
    IC 6429 Method And Cost Of Recovering Quicksilver From Low-Grade Ore At The Reduction Plant Of The Sulphur Bank Syndicate, Clearlake, Calif. ? Introduction

    By Worthen Bradley

    This paper describing the metallurgical practice and costs at the reduction plant of the. Sulphur Bank Syndicate, Clearlake, Calif., is one of a series of papers on the treatment of ores being prepare

    Jan 1, 1931

  • SAIMM
    Method statement for Excavation of Powerhouse Cavern Considering Mudstone Layers in Masjed Soleiman Dam

    By M. Shahabi, M. Kashfi

    This paper briefly describes the excavation procedure of a powerhouse, comprising of its incremental excavation, reinforcement measures, and the installed monitoring system. During the first phase of

    Jan 1, 2003

  • AUSIMM
    The Implementation of Floatstar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits (95bc70ac-0a71-42d0-95cb-764715f2cd9c)

    By P Moswate, D Phillpotts, S M. Mantsho, P Strobos

    A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical

    Jul 15, 2013

  • DFI
    Helical Pile Foundation Anchors As A Practical Alternative

    By Dilip Khatri

    Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ

    Jan 1, 2003

  • SME
    Performance Of A Soft Ground Tunnel On The Washington Metro

    By Edward J. Cording, William H. Hansmire

    INTRODUCTION The Washington Metro, a rapid transit system that will serve the District of Columbia, Virginia, and Maryland, has been under construction for about two years. Construction of the Metr

    Jan 1, 1997

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • SAIMM
    Comment On The Paper ?Strong Ground Motion And Site Response In Deep South African Mines?, By S.M. Spottiswood And A. M. Milev - In The Journal Of The SAIMM, Vol. 105, No. 7, Pp. 515?524

    In their excellent paper, Milev and Spottiswoode have provided quantitative and definitive descriptions of an important phenomenon that hitherto has been largely the subject of conjecture. They conv

    Jan 1, 2006

  • CIM
    The Automatic Burning of Coal

    By A. Ignatieff

    "Demonstrations of Automatic Coal Burning EquipmentAT THE 1951 and 1952 Annual Coal Research Conferences sponsored by the Dominion Coal Board and attended by delegates from the Dominion and Provincial

    Jan 1, 1953

  • NIOSH
    OFR-19-90 Rare-Earth Element- And Yttrium-Bearing Pegmatite Dikes Near Dora Bay, Southern Prince Of Wales Island

    By James C. Barker

    Yttrium and rare-earth element. pegmatite dikes are associated with a peralkaline granitic and nephelene syenite complex near Dora Bay on southern Prince of Wales Island. Mineralized dikes were mapped

    Jan 1, 2011

  • DFI
    Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous Earth

    By Arash Khosravifar, Matt Steffan

    An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is

    Jan 1, 2018

  • NIOSH
    OFR-13-86 Development Of Environmentally Attractive Leachants Volume IV, A Minitest Of An In-Situ Uranium Leach Solution

    By Robert S. Schechter

    A minitest of the new potassium chloride-potassium carbonate two-stage in-situ uranium leach process has been carried out at the Intercontinental Energy Corporation (IEC) Zamzow project site in South

    Jan 1, 1985

  • IIMP
    The sleeper pit lake - a successful model for pit closure

    By Martin Williams

    During the coming decade, many of the first generation of ‘super-pit’ gold and base metal mining operations in North and Latin America will reach the end of their economic lives. The closure of such p

    Apr 22, 2003

  • CIM
    Using Millmapper ™ to Reduce Milling Costs and Improve Performance

    By Tom Gabardi, Peter Clarke

    "MillMapperTM is a new 3D laser scanning technology that has only recently been introduced into the North American mining industry. It enables mill operators to gain a much more complete understanding

    Jan 1, 2012

  • NIOSH
    Subject Index to Bureau of Mines Publications from July 1, 1990 to January 1, 1960 - Subject Index D-L

    "D bed, Ky., coaL, washing characteristics RII 5140coking coal, reserves, estimate RI 5037Pa., coal, washing characteristics RI 4834, 4941D bed mine, Ky., coal, washig characteristics"

    Jan 1, 1960

  • SME
    Conceptual and Geometric Design of Steep Slope Contour Mining

    By John H. Gasper

    The success of steep slope (>20°) contour mining depends on many factors. Most important is the selection of the mining method that best suits the premining site conditions environmentally and economi

    Jan 1, 1991

  • ISEE
    Stemming Enhancement Tests

    A series of stemming confinement tests were conducted at a test site near Vernal, Utah. The purpose of the study was to determine the relative performance of various stemming enhancement “plugs”, stem

    Jan 1, 2000

  • DFI
    The Evolution of Augered Cast-in-Place Piles

    By Willie M. NeSmith, W. Morgan NeSmith, Alan Roach

    "In 2013, Augered Cast-in-Place (ACIP) piles are a mature foundation technology throughout the United States. General guidelines for the design and construction of ACIP piles are available along with

    Jan 1, 2013

  • NIOSH
    Use Of CFD Modeling To Study Inert Gas Injection Into A Sealed Mine Area

    By Michael A. Trevits

    Since the promulgation of the MINER Act and the follow-up changes to the regulations governing mine seal construction and maintenance, mine operators must be acutely aware of the atmosphere in sealed

    Jan 1, 2010