Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Continuous Grouting In Embedding Of Sheet PilesBy Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
RI 3274 Accuracy of Manometry of Explosions: General Survey of the Problem and Comparison of Piston-Type with Diaphragm-Type ManometersBy M. D. Heresy, H. F. Coward
"Whenever a manometer has been used for recording explosion pressures it has been calibrated under a series of static pressures. Whether the readings taken during the rapidly changing pressures of an
May 1, 1935
-
Repair Of Deep Foundations - SummaryBy Dennis W. Boehm
The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current
Jan 1, 1999
-
The Principles And Practice Of Sampling Metallic Metallurgical Materials, With Special Reference To The Sampling Of Copper Bullion. - Introduction.By Edward Keller
The work covered by this report was undertaken at the request of Dr. J. A. Holmes, late Director of the Bureau of Mines, to whom the writer had been recommended by C. W. Goodale and E. P. Mathewson, o
Jan 1, 1916
-
Direct Smelting of Zinc Smelter Residues in the Electric Arc FurnaceBy W. K. Connor, O&apos
Thermal Treatment Technology Division Albany Research Center, U.S. Dept. of Energy Oregon. This evaluation included a characterization study and direct smelting tests conducted in a bench-scale electr
Jan 1, 2000
-
OFR-69-80 Process For Recovering Chromium And Other Metals From Superalloy ScrapBy J. J. de Barbadillo
This report describes a process for recovering chromium and other metals from superalloy scrap. Part I contains the results of laboratory scale experiments which were conducted to test a complex f
Jan 1, 1980
-
Arctic mineral wealth — Will there be a two-sided coin?By Joanna LaForte
"In response to “Arctic Mineral Wealth —Equitable Participation with Aboriginal Landowners – A slow or fast process?”, this author’s impression is one that, to her, seems obvious — this is definitely
Jan 1, 1996
-
Addresses Given at BanquetBy Lawrence Addicks
T HIS has been a most momentous year in the annals of the Institute. We have been in the midst of a situation which, were it not for the convulsions of social unrest with which life is surrounded on e
Jan 1, 1920
-
Diversity of Spontaneous Vegetation on Post-Industrial Sites - Importance in Reclamation ProcessBy G. Wozniak, R. Rostanski, H. Pfanz, G. Aschan, E. Sierka
"Industrial wasteland is a typical element of the landscape of all the industrialised regions in Europe. There are many examples from Poland as well as from other European countries that post-industri
Jan 1, 2005
-
Mechanical Shoveling In Underground Metal Mines - IntroductionBy McHenry Mosier
Mechanical loading, adopted long ago in open-pit, coal, and non-metal mines, was not used extensively in underground metal mines until the World War. In less than a decade it became standard practice
Jan 1, 1940
-
Cost-Benefit Studies of Mining Projects from the National Economic ViewpointThe National Economic Viewpoint? Any substantial project undertaken by private enterprise would normally be subjected to a Discounted Cash Flow analysis of its commercial viability, and would proceed
Jan 1, 1984
-
The Wellington Lake Power ProjectBy E. M. Stiles
THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that
Jan 1, 1940
-
OFR-155-82 Longwall Mining Principles For Safely Working Steep Coal SeamsBy Roger F. J. Adam
This report summarizes the principles of safely working steep coal seam using longwall mining methods. It presents the state-of-the-art and identifies the problems which result from seam inclination.
Jan 1, 1981
-
Development and application of new technology for 3D Geomechanical model test of large underground group cavernsBy S. Jiansheng, H. Nakayama, D. Lu, A. Wang
ABSTRACT: New techniques and methods for 3D geo-mechanical model test are presented in this paper. The new model material NIOS with high density and low cost; the so-called DPSS (Discrete Principal St
Jan 1, 2003
-
RI 3490 Annual Report Of The Explosives Division, Fiscal Year 1939 ? Introduction (2dcb94ad-dd15-44ff-8b85-29719cc37115)By Wilbert J. Huff
The work of the Explosives Division, Bureau of Mines, United States Department of the Interior, for the fiscal year ended June 30, 1939, is described in the following pages. This paper is the fourth o
Jan 1, 1940
-
RI 4178 Georgia Iron Deposits, Cherokee, Bartow, Floyd, and, Polk Counties in Two Parts Part IBy Walter T. Lewieki
"INTRODUCTION Numerous deposits of iron ore are found in Cherokee, Bartow, Floyd, and Polk Counties in northwest Georgia. The deposits are generally small and irregular in shape. The ore is usually re
Jan 1, 1946
-
RI 3519 Underground Transportation Of Coal - Progress Report 1By Albert L. Toenges, Frank A. Jones
"INTRODUCTION The introduction of mechanized pining in coal mines, which has speeded loading, has emphasized the importance of efficient underground transportation systems. The purpose of this invest
Jun 1, 1940
-
Spring Constants of Belled Caissons for Seismic Retrofit of an Existing Critical Structure in a Seismically Active AreaBy David E. Albus, Ahmadreza Mortezaie, Bidjan Ghahreman
The structural evaluation of seismic performance of an existing hospital in Long Beach, California, required spring constants of foundation elements. The structure included support by deep foundation
Jan 1, 2018
-
RI 3975 Exploration of Reward (Vekol) Zinc Deposit, Pinal, AZBy P. S. Haury, Thomas C. Denton
"INTRODUCTION AND RESUMEThe Reward zinc property was one of the first selected for exploration by the Bureau of Mines at time when zinc supplies for war production were very short. Preliminary examin
Nov 1, 1946
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999