Search Documents

  • SAIMM
    Strategies and tactics to control seismic risks in mines - Synopsis

    The risk associated with mining induced seismicity is one of the major threats to the safety and sustainability of deep underground mines. This paper describes techniques that allow site practitioners

    Jan 1, 2009

  • AUSIMM
    Image Processing of Central Volcanic Region Geophysics

    By M A. Mongillo

    Most geophysical and geochemical data collected during regional exploration programmes are in vector form (location, value), and have traditionally been presented and interpreted in a profile or conto

    Jan 1, 1992

  • AIME
    The Magnetite Deposit near Humacao, Puerto Rico

    By R. J. Colony

    DEPOSITS of iron are widely scattered in the folded Cretaceous rocks and the associated igneous intrusives of Puerto Rico. Most of them are too small for commercial development, but a few have aroused

    Jan 1, 1935

  • SME
    Will Geophysical Technologies Return to U.S. Coal Fields?

    By Lawrence M. Gochioco

    One of the best kept technology secrets in U.S coalmining history involved a robust coal geophysics program used by a local coal company to detect and map various geologic anomalies and man-made struc

    Jan 1, 2005

  • NIOSH
    MLA 32-87 - Mineral Resources Of The Tunnison Mountain Study Area, Lassen County, California - Summary

    By Steven R. Munts

    In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 8,445 acres of the 20,650-acre Tunnison Mountain Wilderness Study Area in order to evaluate its identifi

    Jan 1, 1987

  • SME
    Cross Passage Freezing from the Ground Surface

    By Brenton Cook, Nate Long, Larry Applegate, Aaron K. McCain

    "The Northgate Link Extension project is the third phase of the Sound Transit master plan to extend light rail throughout the greater Seattle metropolitan area. When completed, the Northgate Link Exte

    Dec 1, 2018

  • SME
    Technical Note - Increased value of refined high sulfur coal

    By P. R. Dugan

    Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute

    Jan 8, 1987

  • AUSIMM
    WMCÆs Victory Heap Leaching Operation for Gold Recovery at Kambalda, W.A.

    The development of Western Mining Corporation's first commercial gold heap leaching operation is described. The laboratory testwork requirements for determining the amenability of ore to heap lea

    Jan 1, 1987

  • NIOSH
    OFR-124-77 Inherently Safe Mining Systems

    By D. D. Hamilton

    The ISMS program provided for the development and demonstration of equipment modifications for improved safety in both conventional and continuous coal mining systems. This report documents the succes

    Jan 1, 1977

  • CIM
    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • SAIMM
    Mortimer Smelter: Operations Description

    By C. Sima, M. Legoabe

    Keywords: Pyrometallurgy, furnace, platinum Mortimer Smelter is one of the three smelting operations in the Anglo Platinum Group. It is located in the Limpopo Province, approximately 100 km north

    Jan 1, 2006

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • SAIMM
    Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)

    By P. N. Lategan

    Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m

    Jan 1, 2009

  • SME
    Cable-Shovel Dipper Dynamics

    By M. A. Raza

    Cable shovels are capital-expensive and primary production equipment in many surface mines. The forces acting on the shovel dipper vary as the dipper moves through the muck-pile. The variations in the

    Jan 1, 2011

  • SAIMM
    Process design of the Phola coal preparation plant - Synopsis

    By G. M. Cresswell

    The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing

    Jan 1, 2010

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • AUSIMM
    The Bosphorus Rail Tunnel Project

    By A Unlutepe

    The Bosphorus Rail Tunnel Project, located in Istanbul, Turkey, aims to provide a Euro-Asian rail link, via an immersed tube tunnel crossing the Bosphorus Strait, along which will run all commuter, fr

    Jan 1, 2008

  • DFI
    Development of New Shaft Resistance Models for Piles Driven in the Puget Sound Lowlands

    By Armin W. Stuedlein, Youssef Bougataya

    Early stage design of driven piles primarily relies on static analysis based on one or a combination of total and effective stress approaches, the latter known as the method to estimate axial capaci

    Jan 1, 2018

  • AUSIMM
    The Abundance of Lead, Zinc, Copper and Silver at Broken Hill

    By Richards S. M

    The abundances and abundance relationships of lead, zinc, copper and silver in the major sulphide lenses at Broken Hill are examined, and their possible geochemical significance discussed.When express

    Jan 1, 1961