Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Methods of Designing Mechanical Roof Bolting in Horizontally Bedded Strata (7261e3ed-3657-491d-b3f5-21e326427bd6)

    By David H. Y. Tang

    The reinforcement mechanism of suspension effect is analyzed based on beam-column theory. The equations of the maximum bending stress, deflection and transferred bolt load for the bolted roof strata

    Jan 1, 1984

  • SME-ICGCM
    A Statistical Overview of Retreat Mining of Coal Pillars in the United States

    By Christopher Mark

    The demographics and safety record of the pillar retreat segment of the U.S. coal industry was analyzed using statistics collected by the Mine Safety and Health Administration. Pillar recovery is prac

    Jan 1, 1997

  • SME-ICGCM
    The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal Seam

    By Rodger Fry

    All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an

    Jan 1, 1984

  • SME-ICGCM
    Engineering Methods For The Design And Employment Of Wood Cribs

    By Thomas M. Barczak

    Wood cribs are used extensively to stabilize mine openings by providing resistance to deflections of the immediate roof and floor and by supporting the weight of unstable rock masses. While the unit c

    Jan 1, 1993

  • SME-ICGCM
    Field Testing of the Fully Grouted Thrust Tensioned Bolts

    By Kot Unrug

    Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati

    Jan 1, 2002

  • SME-ICGCM
    Analysis Of Practical Ground Control Issues In Highwall Mining

    By R. Karl Zipf

    Highwall mining is an important coal mining method. Upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production. A review of the M

    Jan 1, 2004

  • SME-ICGCM
    Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)

    By Sun Henghu

    This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn

    Jan 1, 1992

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    Analysis of Panel Stability for Post-Mining Slurry Injection

    By Tim Ross

    Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces

    Jan 1, 1998

  • SME-ICGCM
    Surface Subsidence Velocity of Fully-Mechanized Thick Seam Top Coal Caving Mining

    By Wenbing Guo

    Surface subsidence for fully mechanized thick seam top coal caving was measured, and surface subsidence characteristics were then analyzed. The subsidence initiation distance from the set-up room and

    Jan 1, 2011

  • SME-ICGCM
    A Case Study of Bolt Performance in a Two-entry Gateroad

    By Stephen P. Signer

    This paper presents the results of a case study conducted in a two-entry gateroad in a coal mine where excessive roof deformation and bolt loading resulted in failure of many roof supports. The instru

    Jan 1, 1998

  • SME-ICGCM
    A Design Approach For A Swelling Rock In An Underground Mine In Türkîye

    By A. G. Pasamehmetoglu

    The swelling process is an important problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of testing

    Jan 1, 1992

  • SME-ICGCM
    Methods Used To Monitor Roof Geology And Entry Supports

    By James M. Tennant

    In the mid 1970's, American Electric Power significantly expanded its internal coal production. This involved opening several large mines in seams that had never been mined on a large commercial

    Jan 1, 1982

  • SME-ICGCM
    Bolting Practice In Longwall Gateroads At The Miike Colliery

    By Kikuo Matsui

    Standing supports such as steel arches or square work supports along with the necessary struts and lagging have been traditionally employed in the longwall gateroads of the Japanese underground coal m

    Jan 1, 1993

  • SME-ICGCM
    Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot Longwall

    By J. G. Stewart

    Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since

    Jan 1, 1984

  • SME-ICGCM
    Experimental Study of Acoustic Emission Characteristics for Burst-prone Coal/Rock Fracture Process

    By Liu Changyou

    This paper analyzes experimentally the stress-strain relationship and the characteristics and variation trends of acoustic emission signals of the medium- and high-burst-prone coal/rock fracture proce

    Jan 1, 2003

  • SME-ICGCM
    Specialty Truss System And Their Performance

    By Ben L. Seegmiller

    Specially truss systems? including the Intersection Truss®, Continuous Entry Truss®, Cutter Roof Truss® and Roktrus® have been used in many coal mines in the mid- west and western United States during

    Jan 1, 1990

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)

    By Stephen C. Tadolini

    The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve

    Jan 1, 2001

  • SME-ICGCM
    Design Of A Roof Truss Bolting Plan For Bear Mine

    By C. P. Mangelsdorf

    Between June of 1975 and November of 1978 Stateham and Radcliffe of the Denver Research Center of the Bureau of Mines in cooperation with officials of the Bear Coal Company of Somerset. Colorado Condu

    Jan 1, 1984