Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case Histories

    By Michael Gauna, Christopher Mark

    "Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted

    Jan 1, 2016

  • SME-ICGCM
    Longwall Geomechanics, An Australian Perspective

    By Michael Kelly

    Longwall mining is the principal method of underground coal mining in Australia, with 70 million tonnes being produced by longwall mines in 1999. However, the mechanisms that control longwall geomecha

    Jan 1, 2000

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    Site Characterization For Planning Underground Stone Mines

    By Francis S. Kendorski

    Underground stone mines tier construction aggregates and industrial minerals are being planned in increasing numbers throughout the United States. At the middle of the last century (1950s) underground

    Jan 1, 2000

  • SME-ICGCM
    Roof Geology Mapping In Underground Coal Mines

    By Daniel W. H. Su

    Underground roof geology reconnaissance is being conducted by CONSOL Inc. to enhance mine productivity. Often, roof instability within mine entries is the consequence of highly variable geology that c

    Jan 1, 1999

  • SME-ICGCM
    Investigation of Rock Mass Stability around Tunnels in an Underground Mine in USA by 3-D numerical modeling

    By L. A. Sandbak, Yan Xing

    "The purpose of this study is to evaluate the rock mass stability around the tunnels by three-dimensional (3-D) numerical modeling. Complex geological and tunnel features have been included in the mod

    Jan 1, 2016

  • SME-ICGCM
    Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004

    By Lewis Dr. Wade

    It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO

    Jan 1, 2005

  • SME-ICGCM
    Computer Modelling And In Situ Instrumentation Techniques: A Quantitative Approach To Scientific Mine Design

    By Bruce H. Gardner

    This paper describes the application procedure of the Stress Control mine design method. This procedure has evolved over the past 20 years of the practice of this Method in trona, potash, salt, and, m

    Jan 1, 1984

  • SME-ICGCM
    Radon Detection of Mining–Induced Fractures in Overlying Strata of Shallow Coal Seams in China

    By Dongsheng Zhang, Xufeng Wang, Wei Zhang, Gangwei Fan

    "Large-scale longwall mining of shallow coal seams could cause mining-induced fractures to communicate with the surface immediately in Northwest China, leading to a series of mine safety and environme

    Jan 1, 2015

  • SME-ICGCM
    Microseismic Monitoring In The Sydney Coalfield

    By G. R. Corbett

    Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst

    Jan 1, 1994

  • SME-ICGCM
    A Method to Determine the Corrosion Potential of Rock Bolts on Coal Mines

    By Kanchan Mondal, Anthony (Sam) Spearing, Gopi Bylapudi, Joseph C. Hirschi

    "The U.S. coal mining industry uses about 100 million rock anchors per year. ASTM F432 specifies the requirements for rock bolts on mines but does not address corrosion. Corrosion has been found to be

    Jan 1, 2010

  • SME-ICGCM
    Surface Flooding-Considerations For Mining Facilities Site Selection

    By Daniel S. Mazzei

    This paper will be a general discussion of surface flooding considerations as they affect mining facilities site selection, based primarily on experience with several such problems with which MSHA&apo

    Jan 1, 1982

  • SME-ICGCM
    Time–Lapse Photogrammetric Monitoring of an Underground Stone Mine

    By Brent A. Slaker, Michael Murphy, John Ellenberger, Erik Westman

    "Photogrammetry, as a tool for monitoring underground mine deformation, is an alternative to traditional point measurement devices, and may be capable of accurate measurements in situations where tech

    Jan 1, 2015

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    A Comparison of the Overburden Loading in ARMPS and LaModel

    By Ihsan Berk Tulu, Keith A. Heasley, Chris Mark

    "The Analysis of Retreat l\.fining Pillar Stability (ARJ\1PS) and the Lal\.fodel programs have been used successfully in the U.S. for designing safe pillar recovery operations for many years. However,

    Jan 1, 2010

  • SME-ICGCM
    Mining Method For Extracting An Eight Metre Coal Horizon Containing A Sandstone Layer

    By Freddie Hunter

    An underground mining method for extracting an eight metre (26') coal horizon, containing a sandstone layer. A decrease in the thickness of the rock strata between the number two and number th

    Jan 1, 2003

  • SME-ICGCM
    Instrumentation of a Roof Bolter Machine for Void Detection and Rock Characterization

    By Soheil Bahrampour

    Void detection and identification of bed separation while drilling holes in rocks for roof bolting can be a great source of information for the evaluation of ground conditions and adjustment of ground

    Jan 1, 2013

  • SME-ICGCM
    Field Measurements of Overburden and Chain Pillar Response to Longwall Mining

    By Daniel W. H. Su

    Current longwall pillar design relies heavily upon past experience and many assumptions about pillar and entry response to longwall abutment pressures. Caving characteristics of the immediate and main

    Jan 1, 1987

  • SME-ICGCM
    Strength and Deformation Characteristics of Coal under Cyclic Loading

    By Yongjie Yang

    Experimental study on the strength and deformation characteristics of coal under cyclic loading provides guidance for designing coal pillar which is subjected to repeated mining influence during minin

    Jan 1, 2006

  • SME-ICGCM
    Application of Phenolic Foam in Longwall Mining

    By Marc Arl

    Failures of the face and roof above longwall shields have caused days and sometimes weeks of lost production. A common recovery method for these failures has been to pump light weight cementitious gro

    Jan 1, 2005