Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Temperature-dependent Langmuir model in the coal and methane sorption process: Statistical relationship - SME Transactions 2016By X. Tang, N. Ripepi
The Langmuir model has been widely used for the coal-methane sorption process through an isothermal test. However, even though the temperature-dependent Langmuir model was recognized theoretically and
Jan 1, 2016
-
Geotechnical Investigations and Preliminary Design for the LBNF Far Site Conventional FacilitiesBy Seth Pollak, Jon Hurt, Mark Havekost, David Vardiman, James Schick
"INTRODUCTION The Long Baseline Neutrino Facility (LBNF) Far Site Conventional Facilities are proposed to be sited at the Sanford Underground Research Facility (SURF) located within the former Homesta
Jan 1, 2016
-
LTA 219 Project: Multiple Unique Tunneling Solutions in One Subway Package in Singapore - NAT2024By Alix Thierart, Yann Rouillard, Bernard Catalano
Bessac's presence in Singapore started in 2014 with the construction of the Thomson metro line, which includes 18 miles of twin-bore tunnels and 22 stations split into 17 construction packages. Bessac
Jun 23, 2024
-
The Geology Of The Mont Klahoyo Iron Ore Deposit, Ivory CoastBy R. C. Schmidt
The Mont Klahoyo magnetite deposit is located about 600 km northwest of Abidjan, Ivory Coast. During an exploration period ending in 1977 an international joint venture group investigated the deposit
Jan 1, 1979
-
Coupled Finite‑Difference and Discrete‑Element Method for Modelling Direct Shear Tests on Combined Rock‑Cemented Rockfill Specimens - Mining, Metallurgy & Exploration (2022)By CHONG WEI, TATYANA KATSAGA, DEREK APEL
This study provides an effective determination process of the interface microstructural parameters in the numerical modelling of the mechanical interaction between two different geomaterials involved
Nov 2, 2021
-
Roof and Ground ControlBy Robert Stefanko
13.1-SUBSIDENCE AND GROUND MOVEMENT ROBERT STEFANKO 13.1.1-SUBSIDENCE AND FAILURE This treatment of subsidence and ground movement will be confined to subsidence control for limiting surfac
Jan 1, 1973
-
Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021By Taner Aydogmus
The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co
Jun 13, 2021
-
Stability Assessment of a Tailings Pond Considering the Effect of Staged Construction and Embankment Raising Rate: a Numerical Study - Mining, Metallurgy & Exploration (2023)By Abhishek Kumar, T. G. Sitharam, Surender Singh
The height of tailings pond (TP) embankments is frequently raised to accommodate the ever-increasing volume of tailings released by the mining industries. Excess pore water pressure (EPWP) may develop
May 16, 2023
-
Development of Mine Haul Road Surfacing Condition Monitoring Through Digital Image Processing (SEPTEMBER 2015 Mınıng engıneerıng)By S. Pastor, S. Hahn
"As the concept of autonomous haulage systems (AHS) moves from prototypes to production-ready applications, the operating performance of the haul road will become critical to the overall success of au
Jan 1, 2015
-
Study of Straw Charcoal as Reductant in Co‑reduction Roasting of Laterite Ore and Red Mud to Prepare Powdered Ferronickel - Mining, Metallurgy & Exploration (2021)By Dong Yang, Jicai Han, Xiaoshuang Guo, Tichang Sun, Zhengyao Li
Straw charcoal was used as a novel reductant in the co-reduction roasting of laterite ore and red mud. The influence of the reductant dosages, co-reduction temperature, and co-reduction time were inve
Aug 12, 2021
-
Site Evaluation For Cavability And Underground Support Design At The Climax MineBy John T. McDonough
The Climax Mine of AMAX's Climax Molybdenum Division is currently producing approximately 34,000 tons of molybdenum ore per day from two underground levels (see Figure I), and initial design is u
Jan 1, 1977
-
Legal Due Diligence --The Skeletons In The Closet (e37e583c-5d9d-49db-b964-f1ef042939a3)By J. M. King
A crucial step in the acquisition by one company of the assets of another, the acquisition of the stock of another company, or the merger of two com-ponies, is the legal due diligence which needs to b
Jan 1, 1990
-
Site Characterization Of Minnesota Manganese Deposits For Determining In Situ Mining PotentialBy P. A. Tuzinski, L. J. Dahl, N. R. Adamson, S. E. Brink, R. L. Blake
The US Department of the Interior, Bureau of Mines is developing a process to selectively extract manganese from oxide ores as part of its in situ mining research program. The Bureau is conducting sit
Jan 1, 1994
-
Automatic Extraction of Accurate Particle Sizes from a 3D Point Cloud of Rock Masses Based on a Hybrid Modified Bounding Box Algorithm - Mining, Metallurgy & Exploration (2024)By Adabala Raja Venkata Sai Naresh, Radhakanta Koner
Particle size distribution (PSD) is an essential parameter in assessing the overall efficiency of blasting operations in mines and the subsequent mine-to-mill process in the mining industry. Despite s
Dec 29, 2023
-
Making Iron Directly From Concentrate by Gaseous Reduction - Mining, Metallurgy & Exploration (2023)By H. Y. Sohn
Considering the two most important issues the ironmaking industry faces today, i.e., energy consumption and greenhouse gas emissions, it would be advantageous to utilize the concentrate-size raw mater
May 12, 2023
-
Wastewater Discharge Sites From Mining Operations In The "New Lead Belt" Of MissouriBy Nord L. Gale
Lead, zinc, copper, silver, cadmium and many other heavy metals which are potentially hazardous if released into the environment in wastewater discharges have been of considerable concern to governmen
Jan 1, 1977
-
Exploration of Limestone Pillar Stability in Multiple‑Level Mining Conditions Using Numerical Models (Mining, Metallurgy & Exploration)By Michael Murphy, Gamal Rashed, Brent Slaker
Pillar stability continues to be a significant concern in multiple-level mining conditions, particularly for deep mines when pillars are not stacked or the thickness of interburden between mining leve
Jul 27, 2022
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
El Abra: World’s Largest SX/EW Mine on Track to Join Copper Mining EliteBy Robin J. Hickson
El Abra is one of the world’s premier copper de-posits. The project is located in northern Chile, 140 km (87 miles) inland from the Pacific coast. It has the same geologic age and structural setting
Jan 1, 1996
-
Plant-Site Evaluation of Air-Sparged Hydrocyclone Technology for Phosphate Flotation SeparationBy Ning Liu, Di Yin, Xuming Wang, Yongqiang Lu, Jan D. Miller
Air-sparged hydrocyclone (ASH) flotation technology has been evaluated for phosphate recovery from the central Florida phosphate deposits. As expected, it was demonstrated in pilot-plant tests that th
Jan 1, 1999