Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th

    Jan 1, 1997

  • ISEE
    Metafex®: Safe, Energetic Explosive Replacements

    By David Davison

    Metafex®* is an inert material that is more energetic than explosives when activated. Because Metafex is inert until activated (a moment before use), it can profoundly change the logistics of systems

    Jan 1, 2006

  • ISEE
    World-Wide Survey of Distress Blasting Practice in Deep Hard Rock Mines

    By Marwan M. Mohammed, Hani S. Mitri, Wilfrid Comeaul, Baoyao Tang

    In many parts of the world, rockbursts have become a major problem of mining at depth. As orebodies are being mined deeper, rockburst phenomena have become familiar to deep hard rock mines. Rockbursts

    Jan 1, 1999

  • ISEE
    Techniques for Assessing the Performance of Explosives and Initiating Devices

    By A R. Cameron

    "The number of commercial explosive products available to the mining industry has been steadilyincreasing and associated with this there has been an increase in the range of characteristics or propert

    Jan 1, 1994

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders

    By Jackson R. Pressley, Bruce Vandenberg

    An explosive’s velocity of detonation, (VOD), can be used to indicate a number of important characteristics regarding the product’s performance, under specific field and test conditions.

    Jan 1, 1997

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • ISEE
    Top Hammer Drilling-The Way Things Work

    By William D. Hissem

    For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.

    Jan 1, 1998

  • ISEE
    A Review of Rock Slope Development with Explosives Since the 1960's

    By Harry L. Siebert

    Pre-splitting was substituted for line drilling to achieve stable rock slopes and reduce excavation beyond the pay line on a Connecticut highway project in 1962-63. Changes have occurred in developing

    Jan 1, 1998

  • ISEE
    The Effect of Fragmentation on Loader Productivity

    By Michael D. McGill

    The effect of fragmentation size distribution as it relates to front end loader productivity was evaluated by comparing loader cycle times to fragmentation size of the shot rock. At Gold Mine in Sout

    Jan 1, 1994

  • ISEE
    Building the Bridge - Explosive Regulation and Application

    By Geraldine Woods

    I work for the State of Washington as an Explosives inspector. My paper will describe the mission of the Wa. State Dept. of Labor pertaining to explosives and the regulation of explosives in the State

    Jan 1, 2002

  • ISEE
    Blast Vibration Analysis, the Fourier Transform and Delay Effects on Frequency

    By Randall M. Wheeler

    "Fourier analysis is a very powerful frequency analysis tool. However, it is frequently misunderstood and sometimes used inappropriately. Part of this workshop will involve the basics of Fourier serie

    Jan 1, 1998

  • ISEE
    Low-Cost Method of Using Blasting Videos to Improve Performance

    By Jennifer Ward

    The primary objective of this paper is to establish how a low cost, high definition (HD) camera can allow for easy sustainable recordings of blasting operations. The subsequent analysis of each video

    Jan 1, 2015

  • ISEE
    Blasting for Avalanche Control Above Snoqualmie Pass and Chinook Pass in Washington State

    By Craig Wilbour, John Stimberis, Rob Gibson, Lee Redden

    An avalanche is a snow slide. A simple explanation is that the snow on a slope will slide (avalanche) when the snow strength can no longer support its own weight. Snow avalanches happen when the load

    Jan 1, 2004

  • ISEE
    The Analysis of Blast Vibration Data - What is the Current State of the Art?

    By Randall M. Wheeler

    Many of us have used a seismograph to measure peak particle velocity and frequency. But do we really understand why? Also, why do we measure particle velocity instead of displacement and/or accelerati

    Jan 1, 1997

  • ISEE
    Small Scale Testing of the Effect of Powder Factor, Timing and Charge Distribution on the Impact Breakage of Rocks

    By A Tawadrous, P D. Katsabanis, S Kim

    A series of small scale tests, have been performed to establish the effect of powder factor and initiation timing on the grindability of rocks. The blasts were performed in high quality granite blocks

    Jan 1, 2009

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders

    By Daniel Hauer

    In considering the cost of rock excavation, but little attention has been given to the economical handling and breaking up of boulders. Very few records seem to have been kept as to the cost of such w

    Jan 1, 2006

  • ISEE
    Choosing the Correct Bulk Loading Equipment Can Help Optimize Your Blasting Program

    By R Tom Watts

    The blasting industry has changed more in the last five years than in any period to date. The equipment utilized to load boreholes has changed in response to more precise blasting products and program

    Jan 1, 2000

  • ISEE
    Journal: Evaluating and Managing Blasting Risk Part I

    By Gordon Revey

    Over ten million pounds of explosives are used daily to blast rock in mines, quarries and construction projects throughout the United States. Despite the immense volume of explosives used, serious inc

    Jan 1, 2001

  • ISEE
    Logistical Processes in the Explosives Industry Using Examples from Daily Work

    By Frank Hirthammer

    Productivity, customer relations, and effectiveness of work depend to an ever-increasing extent on a functioning logistics system tailored to the needs of the user. Of course, it is not possible to co

    Jan 1, 2019