Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Field Monitoring of Loading Properties for Gassed Bulk Emulson

    By Yang Ruilin

    Bulk gassing technology is a growing trend in the commercial explosive industry. The gassed bulk products produced differ from microballooned bulk products or cartridged products. It is easy to know t

    Jan 1, 1999

  • ISEE
    Vertical Crater Retreat Mining. At the Luossavaara Research Mine

    By Bengt Niklasson

    "A test stope at the Luossavaara Research Mine in Kiruna, Sweden,was divided into four different modules in which various hole patterns and explosives were tested in order to evaluate:1. The optimum c

    Jan 1, 1985

  • ISEE
    Blast Created Trenches for Groundwater Remediation

    By Jeffrey E. Loney, Andrew F. McKnown

    Recovery of contaminated groundwater migrating through bedrock can be very difficult due to the low transmissivity of many bedrock fracture systems. To overcome these difficulties, a system of control

    Jan 1, 1995

  • ISEE
    Mine Blasting Accident Update

    By Larry R. Fletcher, John W. Kopp

    The safety record for explosives in U. S. mining is excellent considering that over 4 billion pounds of explosives are now being used each year. However, blasting accidents remain one of the most seri

    Jan 1, 1991

  • ISEE
    Rockbreaking Characteristics of Various Mining Explosives in Small Diameter Holes

    By J R. Brinkmann

    The South African gold mining industry presently uses four different types of explosives in stope blasting. There is general agreement that the type of explosive has considerable effect on Important b

    Jan 1, 1989

  • ISEE
    Drilling and Blasting a Complex Underground Ore Block

    By Paul V. Sterk, James Wieser

    Mining in underground situations requires constant change due to changing ore bodies and economics. The Homestake Mine in its 122 years of existence has gone through numerous changes due to these fact

    Jan 1, 1999

  • ISEE
    Multi-Blasthole, Multi-Row, Detonation Delay timing Simulation of Rock Blasting Using DMCBLAST_3D

    By Dale Preece, Stephen Chung

    Development of DMCBLAST-3D is continuing and now includes the capability to simulate the detonation of multiple blastholes in multiple rows that make up a conventional bench blast, either in a rock qu

    Jan 1, 2002

  • ISEE
    Flyrock Revisited: An Ever-present Danger in Mine Blasting

    By Harry Verakis, Thomas Lobb

    A great deal of information has been presented and published on the danger from flyrock created from blasting operations. The creation of flyrock is not specific to any one blasting operation. Flyrock

    Jan 1, 2007

  • ISEE
    Mining in the Genesis Open Pit above the Active Deep Star Underground Access

    By Robin L. Simmons

    Mining in the Genesis open pit has been conducted above the active haulage and ventilation declines of the Deep Star underground mine. Production has continued in both mines. The Deep Star haulage and

    Jan 1, 1998

  • ISEE
    Influence of Shock Waves on the Response of Full Contact Rock Bolts

    By Francis O. Otuonye

    The results of an ongoing study to determine the response of full contact rock bolts to shock waves due to blasting are presented. A time domain systems modeling and analysis technique was used to ide

    Jan 1, 1993

  • ISEE
    Selection of Powder Factor in Large Diameter Blastholes (fd85c28b-31b4-4c7a-b833-27f2a5d736a0)

    By Jack Eloranta

    This paper documents the relationship between material handling and processing costs compared to blasting cost. The old adage, "The cheapest crushing is done in the pit", appears accurate in this case

    Jan 1, 1995

  • ISEE
    Effective Construction Blasting Damage Control

    By Earl C. Hutchison, Gene Smith

    Extensive blasting was required to construct an underground tunnel for a 90 inch sewerage relief line. The tunnel and required excavation extended under an upper middle-class residential area in Atlan

    Jan 1, 1981

  • ISEE
    Rock Spillover Interaction Between Two Active Mining Sectors

    By R. J. Cefalo

    Blast and mining spillover between phases or critical areas of the pit is a continuing problem in the mining industry and a safety concern for operating mines. The challenge for many mines is to produ

    Jan 1, 2024

  • ISEE
    Regional Observations of Mining Blasts by the GSETT-3 Seismic Monitoring System

    By Brian W. Stump

    The cessation of testing of any nuclear explosive devices in all environments is the goal of the Comprehensive Test Ban Treaty. In order to assure compliance with such a treaty, an international monit

    Jan 1, 1997

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Maximizing tunneling advance rate and explosive loading time at Atacama Kozan mine

    By Juan Pablo Henríquez, Sebastian Lozano, Constanza Soto, Gonzalo Segura, Carlos Torres, Danko Morales

    The Atacama Kozan underground mine, located in Tierra Amarilla, Atacama, Chile, was facing over-excavation and slow progress in drift construction, issues associated with the use of traditional explos

    Jan 26, 2026

  • ISEE
    Cooperation in Regulations

    By John Petty, John Loviza

    Single sentence describing content-- "The best ally an Explosives Engineer can have in a court of law is a regulations enforcer stating all codes and standards were met on a jobsite".

    Jan 1, 1996

  • ISEE
    Marine Drilling and Blasting the Central Artery / Third Harbor Tunnel Project Boston, Massachusetts

    By Gerard O'Brien, Douglas Comstock

    "The construction of the Third Harbor Tunnel is the first major portion of the Central ArteryProject. The tunnel is designed to connect South Boston to East Boston to alleviateautomobile congestion th

    Jan 1, 1993

  • ISEE
    A New Innovative Drilling Bit for Straighter Blast Holes and Improved Productivity

    By R D. Skaggs

    A good blast is dependent on a well engineered design. However, a good design's performance depends on the control of the drilling and loading of the blast holes. The key stone to good blasting is the

    Jan 1, 1991

  • ISEE
    Efficient Coordination of Mine Planning, Drilling, Blasting, Maintenance and Production in an Open Pit Mine

    By David F. Street

    In order to achieve an efficient operation in an open pit mine it is very important to develop and maintain good coordination and communication between various departments within the operation. This p

    Jan 1, 1994