Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Numerical Modeling of Oil Shale Fragmentation Experiments

    By J S. Kuszmaul

    The economic development of modified in situ oil shale retorting will benefit from the ability to design a blasting scheme that creates a rubble bed of uniform permeability. Preparing such a design de

    Jan 1, 1985

  • ISEE
    Evaluation of Soil Cratering and Ground Vibration through Small-Scale Airblast Experiments

    By Courtney Vallejo, Rafiqul Tarefder

    This study examines the effects of small scale airblast experiments on cohesive soils and the resulting ground vibrations and crater geometries. Relationships for ground vibration attenuation with soi

    Jan 1, 2013

  • ISEE
    Pyrotechnics for Breaking Rock and Concrete in Sensitive Environments

    By Tom Hale

    Developers and blasters are faced with increasing public demand and regulatory restrictions to maintain the lowest possible levels of noise and vibration from blasting operations in populated urban ar

    Jan 1, 2008

  • ISEE
    New Variables for Rock Fragmentation Management

    By Rafael Tadeu Pinto e Moura, Giorgio De Tomi, Jacopo Seccatore

    This paper describes a research and development project in an open-cast mine with the goal to achieve an average P80 of 300 mm (11,8”) in the run-of-mine (ROM) product without altering the existing bu

    Jan 1, 2015

  • ISEE
    Relating Horsepower to Drilling Productivity (315b5cd4-5d8d-4d24-b315-826af9c6ec5d)

    By Brian Wingfield, Rick Givens, Greg Williams

    Many technological advancements have been made in explosive products and applications over the last 15 years resulting in productivity and cost gains. However, the applications of total energy (engine

    Jan 1, 1996

  • ISEE
    Underground Pillar Blasting with Bulk Emulsion explosives

    By H Russell

    An account of an experimental blast at the Sullivan Mine involving a small pillar drilled with 4 1/2" diameter up-holes, and loaded with emulsion explosives from a truck-mounted tank/pump unit.

    Jan 1, 1984

  • ISEE
    Benefits of Hercduct in Construction Blasting

    By Thomas C. Jones

    The purpose of this paper is to disseminate new information for nonelectric blasting in trenching and construction work. The presentation is not designed or intended to discredit conventional electric

    Jan 1, 1984

  • ISEE
    Reducing Coal Loss During Cast Blasting At Rix’s Creek Mine

    Bloomfield Collieries Rix’s Creek Mine is an open cut coal operation located in the Hunter Valley region of Australia. The mine produces approximately 1.1 mt of saleable product per year and routinely

    Jan 1, 2006

  • ISEE
    Near-Field Blast Vibration Monitoring, Analysis and Modeling

    By Ruilin Yang

    Techniques for the study of blast vibrations, such as monitoring, analysis, and modeling are often misused between near field and far field blast vibrations. This paper discusses the differences betwe

    Jan 1, 2007

  • ISEE
    Planning for Profit

    By Isaac E. "Chip" Harris

    Any contractor who agrees to supply materials or to perform services for a sum, is well aware of the importance of proper pre-bid information. Being able to properly plan costs and methods results in

    Jan 1, 1975

  • ISEE
    The Application of High Speed Video System for Blasting Research

    By Quian Liu

    Since the establishment of the CANMET Experimental Mine in Val d'Or, Quebec in 1991, research activities in rock fragmentation have been carried out not only in the underground laboratory but also in

    Jan 1, 1994

  • ISEE
    Large-Diameter AN-FO Priming Techniques

    By Richard A. Dick

    Few topics in the blasting industry are more controversial than the proper riming procedure for large-diameter ammonium nitrate-fuel oil (AN-FO) charges, despite the considerable amount of research th

    Jan 1, 1976

  • ISEE
    Strategy, Innovation and Change - Challenging the Future at the Gregg River Mine

    By Rick W. Bellenie, Ronald L. Woolf

    The Gregg River mine is located 40 kilometres (25 miles) south of Hinton, Alberta, approximately 330 kilometres (205 miles) west of Edmonton and lies against the Front Range of the Rocky Mountains.

    Jan 1, 1994

  • ISEE
    Applications of the Hand Held Programmable Calculator in Field Problem Solving

    By J R. "Dick" Daniel

    Over the past several years, the Hercules Technical Service Group for the Explosives Department has produced a series of programs for the TI59 programmable calculator dealing with explosive applicatio

    Jan 1, 1984

  • ISEE
    Cost Effective Loading of Large Diameter Pre-Split Holes

    By LaRay Collyer

    San Juan Mine began pre-splitting the highwall prior to cast blasting in August 1986. The first pre-split shot used six inch PVC (polyvinylcloride) pipe inside a 10 5/8 inch hole, drilled at a 74 degr

    Jan 1, 1990

  • ISEE
    Source Scaling of Single-Fired and Delay-Fired Explosions Constrained by In-Mine and Regional Seismograms

    By Brian Stump, D. Craig Pearson

    This work quantifies seismic coupling as a function of charge weight for single-fired (simultaneously detonated) explosions observed in the mine and at regional distances. These single-fired explosion

    Jan 1, 2002

  • ISEE
    Pneumatic Loading of ANFO Underground

    By J J. F Smith

    The application of pneumatically loaded ANFO for underground mining has continued to increase year by year since the technique was first developed and introduced underground during the early 1960's. I

    Jan 1, 1982

  • ISEE
    Suggestions for Successful Cut Blasting

    Blasting in a development heading or breasting operations starts from a cut. The void created by the cut provides a free face for the remainder of the round. It is the most critical part of the round

    Jan 1, 1995

  • ISEE
    Complying with Sara-Title III: The Community Right-to-Know Act as a Non-Manufacturing Facility

    By Douglas R. Burns

    Complying with SARA-Title III and the Emergency Planning and Community Right-To-Know Act as a Non-Manufacturing Facility. As of August 23, 1988 non-manufacturing facilities storing end using chemicals

    Jan 1, 1989

  • ISEE
    PPV. SD. Really? Still??

    By Doug Anderson

    Two quantities, Peak Particle Velocity (PPV) and Scaled Distance (SD), have controlled aspects of many blasting projects and operations for a long time. Vibration criteria typically use both PPV and S

    Jan 1, 2018