Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case HistoryBy Christopher J. Pacitto
This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe
Jan 1, 2002
-
Performance Of Three Unique Shoring Sections For Block 75 ShoringBy Chris Sammon
The Block 75 portion of the City Creek redevelopment project in Salt Lake City required multiple shoring walls surrounding the 6 acre site constructed to depths ranging from sixty-five to ninety feet
Jan 1, 2010
-
Understanding Soils Reports - Presented At A Structural Engineers Association Of Northern California Continuing Education Seminar On Foundations/Excavations, March 1984By Loring A. Wyllie
Preparation, understanding and use of soils reports must be a team effort to be fully effective. The soils engineer must know what is to be built and exactly where. The structural engineer and owner m
Jan 1, 1986
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
Instrumentation Of Construction VibrationsBy Mark R. Svinkin
Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c
Jan 1, 2002
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
Drilled Pile Design and Installation Challenges in an Urban EnvironmentBy Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation RemediationBy Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their AnalysesBy Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006
-
I-470 Mine RemediationBy Sheryl D. Gallagher
The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the
Jan 1, 2009
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test ResultsBy Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Cut-Off Walls For Diamond Mining In The ArcticBy Wolfgang G. Brunner
A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to
Jan 1, 2003
-
Deep Mix-In-Place Soil/Cement Stabilisation Using Hollow Stem Augers For Excavation At Elland, West YorkshireBy J. A. Elliot
Deep Mix-in-Place soil stabilisation is achieved by forming columns of soil/cement arranged to overlap by secant intersection. Alternate columns are constructed initially and infilled. The cementitiou
Jan 1, 1989
-
Static Uplift and Lateral Load Testing of Piles for a New Power PlantBy José L. M. Clemente, John R. Davie
"Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi
Jan 1, 2014
-
New Focus: Environmental Impact Reduction of Proper Slurry Waste ManagementBy Zachary Q. Maassen
The purpose of this paper is to highlight the environmental benefits of properly managing slurry waste as it is generated on site. The following projects will be used to illustrate the importance of p
Jan 1, 2018