Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Diggs Does Deep FoundationsBy Robert Bachus, Nikolaos Machairasm, Allen Cadden
Data Interchange for Geotechnical and Geoenvironmental Specialists (DIGGS) is a data transfer standard that is gaining widespread acceptance in the geotechnical and geoenvironmental communities. Origi
Jan 1, 2019
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Repairs Of Diaphragm Walls, Lessons LearnedBy Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011
-
Underpinning Using Long Minipiles In Compressible SoilsBy Mohamad H. Hussein
A minipile system was employed in underpinning a historical structure in Florida. The existing structure is founded on shallow foundations. Subsurface conditions at the project site consist of deep or
Jan 1, 1993
-
Diaphragm Wall For Deep Basement Provides Efficient Use Of Waterfront Property At Harbor East In BaltimoreBy S. Y. Fantaye
This paper discusses the design, construction and performance of a 30 inch thick diaphragm wall recently constructed in Baltimore, Maryland at Inner Harbor East. The project site is an established ma
Jan 1, 2008
-
East Boston Branch Sewer Relief Project: Support Of Excavation Case StudyBy Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Marine Prefabricated Vertical Drains for the Craney Island Eastward Expansion (c2c7d75f-a035-4e5c-9df5-e768ce1a9e85)By Mohamed Mekkawy, William W. Wheaton, Ira Brotman
"The Virginia Port Authority and the U.S. Army Corps of Engineers are partnering to construct the Craney Island Eastward Expansion (CIEE) to meet the dual purpose of extending the life of Craney Islan
Jan 1, 2017
-
An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & ConstructionBy Abid O. Adekunte
The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing
Jan 1, 2008
-
Marine Prefabricated Vertical Drains For The Craney Island Eastward ExpansionBy Ira Brotman
The Virginia Port Authority and the U.S. Army Corps of Engineers are partnering to construct the Craney Island Eastward Expansion (CIEE) to meet the dual purpose of extending the life of Craney Island
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction Potential Of Fine Sand By Wet Top Feed Vibro Replacement Method – A Case StudyBy Parameswaran V. S, Anshuman Singh
This is a case study on ground improvement using Stone columns at Kokrajhar in Assam which comes under seismic Zone V as per IS: 1893. The strata at site comprised of mostly fine sands with low SPTN v
Nov 1, 2022
-
Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place PilesBy Timothy C. Siegel
Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi
Jan 1, 2010
-
Design of Pile Foundation for Tall Railway Bridges in North-East IndiaBy Sumantra Sengupta
"Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu
Jan 1, 2015
-
Structural Aspects Of The Stabilization Of Ten Mile SlideBy Adrian Gygax, Sarah Gaib, Rod Kostaschuk
The British Columbia Ministry of Transportation and Infrastructure (Ministry) recently completed a slope stabilization project at Ten Mile Slide on Highway 99. The highway is an essential part of the
Oct 1, 2022
-
The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site CharacterizationBy Anahita Modiriasari, Benjamin S. Rivers
Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca
Oct 1, 2022
-
Cost Effective Drilling Of Extra Large [XL] Monopile FoundationsBy Phil Wilkinson, Sam Whitaker
"The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo
Jan 1, 2017