Piles In Peat Under Artesian Pressure: A Case Study ? SynopsisBy K. Y. C. Chung
A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga
Jan 1, 2010
-
Rammed Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle EastBy Brian Metcalfe, Kord Wissmann, Gianni Martinez
The Middle East consists of vast deserts that reach temperatures up to 50 degrees Celsius, with some areas characterized by endless sand dunes. When the project team selected the location for a large
May 1, 2022
-
Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, IndiaBy Deepak B. Deshpande
This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site
Jan 1, 2002
-
Estimation of Shaft and Base Responses from Pile Load TestBy Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran
"Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc
Jan 1, 2017
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
Response to Load for Four Different Types of Bored PilesBy Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
Hand-Excavated Pier Foundations For A High-Rise Hotel In The City Of Dalian, China ? SynopsisBy A. K. C. Chan
Recent hotel investment projects in China often involve very tight programmes for design and construction. An example given in this paper involves a 24-storey reinforced concrete hotel tower with 460
Jan 1, 2010
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)By Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in
Jan 1, 2007
-
Recommendations For Implementing And Interpreting NonDestructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.By Jose L. Garcia
The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra
Jan 1, 2006
-
Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration StandardsBy K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and
Jan 1, 2014
-
Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing BridgeBy Roy M. Schnabel
The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in
Jan 1, 1993
-
Anchored Excavation Support Using SMW (Soil Mixed Wall)By Seth L. Pearlman
A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe
Jan 1, 1993
-
Technical VisitBy the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST
Jan 1, 1994
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
111,000m Of Continuous Flight Auger Piling For LNG Tank Bases In Poor Alluvial Soils, Isle Of Grain, UKBy Shane Baker
Cementation Foundations Skanska Ltd encountered many significant challenges in designing and constructing the foundations for the LNG (Liquefied Natural Gas) tanks and associated structures at the Isl
Jan 1, 2006
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement PilesBy Monica Prezzi
"Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol