A New Method of Quality Control for Construction Joints in Diaphragm WallsBy Nikolaus Schneider
"Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta
Jan 1, 2014
-
The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;By Robert A. Field
Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t
Jan 1, 1997
-
Quality Control For Installation Of Augered Cast-In-Place PilesBy Francis J. Arland
The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh
Jan 1, 1997
-
The Use of Seismic Trace Characterization to Guide the Analysis of DST Results to Obtain More Accurate Soil ParametersBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is a very popular applied seismology site characterizing tool within geotechnical engineering. A challenging aspect of DST is to characterize the acquired seismic data s
Jan 1, 2018
-
Are Specifications for Deep Foundation Concrete Up-To-Date?By Karsten Beckhaus
"Abstract Tremie concrete for special geotechnical works needs special properties, especially during the casting process. Today’s execution standards for bored piles and diaphragm walls, EN 1536 and E
Jan 1, 2014
-
Construction Of The Deepest Kelly System Foundation Piles In Kuala Lumpur, MalaysiaBy Vijayakumar Viramuthu, Martin Heinrich
Tower of Lot L, L1 & M, Kuala Lumpur City Centre when completed would stand 700 m tall. This Mega tall Skyscraper would merely be less than 500 m away from the world tallest Twin Tower, the Petronas T
May 1, 2022
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
Behavior Of Step Tapered Bored Piles In Sand Under Axial LoadingBy Nabil F. Ismael
The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al
Jan 1, 2008
-
Sustainability: A Role for Blended Cements and Industrial Byproducts in Soil Mixing, Grouting, and Slurry WallsBy Charles M. Wilk, Lori Tiefenthaler
"Information presented in this paper can be used to support deep soil mixing, subsurface grouting and slurry wall technology as sustainable construction technologies. Ordinary Portland Cement (OPC) is
Jan 1, 2017
-
Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical GardenBy David C. Kraft
Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped
Jan 1, 2011
-
Operator Independent Installation Of Lime Cement (L/C) ColumnsBy Tobias Hansson
The quality of Lime Cement (L/C) columns is to a great extent dependent on the installation procedure. At a site in the south of Sweden, the client reported problems with the installed columns. To eva
Jan 1, 2000
-
The Effects Of System Components On The Deflection Of MSE Retaining WallsBy Scott C. Vollmer
This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str
Jan 1, 2003
-
Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm WallsBy B. Sivarama Sarma, Biswabikash Rout
"Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes
Jan 1, 2017
-
Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile ConstructionBy Andrew L. Peterson
CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac
Jan 1, 1997
-
The Effect Of Overburden On Pile Capacity In A Calcareous MarlBy William M. Camp
An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet
Jan 1, 1993
-
Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.By Paul M. Wiltcher
This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas
Jan 1, 2006
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New MethodBy George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing MethodBy Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and CasinoBy Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018