Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Modulus of Elasticity in Deep Bored Piles

    By Carlos Lam, Joram M. Amir, Erez I. Amir

    "Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta

    Jan 1, 2014

  • DFI
    Special Foundation Systems - Introduction

    By D. A. Greenwood

    Dr David Greenwood opened the first technical session of the conference by highlighting the diverse nature of the papers in this session but drawing attention to the common theme that each solved a pa

    Jan 1, 1991

  • DFI
    Results Of Dynamic And Static Load Tests On Helical Piles In The Varved Clay Of Massachusetts

    By Jorge Beim

    Helical Piles are increasingly being used to support and rehabilitate structures subjected to compressive axial loads. Traditionally, empirical correlations between installation torque and load capaci

    Jan 1, 2012

  • DFI
    Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine

    By James W. Weaver

    The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea

    Jan 1, 2011

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • DFI
    Design Of Drilled Pier In Expansive Soils

    By G. T. Hong

    A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p

    Jan 1, 2007

  • DFI
    Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary

    By Alec C. Bloem

    A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of

    Jan 1, 1991

  • DFI
    Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of Canada

    By Richard Deakin

    This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and

    Jan 1, 2011

  • DFI
    Guidelines for Selecting Cutoff Wall Systems

    By Mary Ellen Large

    This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system

    Jan 1, 2021

  • DFI
    Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge

    By Jacob Chacko

    The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new

    Jan 1, 2002

  • DFI
    Söderströmstunneln – An Immersed Tunnel Founded on Steel Core Piles

    By Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert

    "AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel

    Jan 1, 2014

  • DFI
    Collaborative Alliances – A Sustainable Way Forward For Construction?

    By Stefano Trevisani

    Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,

    Jan 1, 2014

  • DFI
    Innovative Riverbank Erosion Control Retaining Wall System for the Brazos River

    By Tracy Brettmann, Will Bohlen

    An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban

    Jan 1, 2018

  • DFI
    Positive Cut-Off Wall in Indian Dam – A New Technique for Difficult Geology

    By Steni Stefani, Sanjay Dave

    "This paper describes an innovative method, used for the first time in India, for the construction of a 1.0metre-thick positive plastic concrete cut-off wall (CoW) at the upstream toe of the dam at th

    Jan 1, 2017

  • DFI
    Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance

    By Gustavo Armijo

    Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha

    Jan 1, 2006

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • DFI
    Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And Limitations

    The intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi

    Jan 1, 2004