Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
-
Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? SynopsisBy Y. Z. Wang
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2
Jan 1, 2010
-
Slurry Trench Design and Construction in Difficult ConditionsBy Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile ComparisonBy David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Risk Management Techniques to Avoid LitigationBy Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Environmentally Friendly Geothermal Piles At Keble College, Oxford, UKBy Tony P. Suckling
This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct
Jan 1, 2002
-
The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?By Manfred Schoepf
"Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import
Jan 1, 2015
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Deep Mixing Column Group Reinforcement by a Shallow Mixing Layer bBeneath an EmbankmentBy Tomohide Takeyama, Binh T. T. Nguyen, Masaki Kitazume
"Deep mixing columns are widely used to support embankments constructed on soft ground area. Researches on the stability of deep mixing columns were done by some authors when the columns do not simult
Jan 1, 2015
-
Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWYBy David Coleman
This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive
-
Innovative Micropile Retrofit Of Two Existing StructuresBy Terence P. Holman
Micropiles are employed to retrofit existing foundations, including underpinning prior to future construction operations and resupport of existing structures that have experienced distortion and settl
Jan 1, 2007
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Mindful Monitoring Of A Variable Excavation Support SystemBy B. Philip Shull, Allen W. Cadden, Johanna M. Simon, Michael S. Senior
A 670 linear meter (2,200 linear foot) large-diameter sanitary sewer interceptor installation at depths ranging from 3 to 10 m (10 to 30 ft) below existing grade in an area with a high water table req
-
Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving PermitsBy Alan Christopherson
Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med
Jan 1, 2013
-
San Francisco-Oakland Bay Bridge: OPA WinnerBy Gerry Houlahan
"The 2015 Outstanding Project Award (OPA), which recognizes the superior work of DFI members, was awarded for the San Francisco- Oakland Bay Bridge New East Span. The award was presented to representa
Jan 1, 2015
-
JFKIA - Post Grouted Drilled Shafts And Driven Piles - Update - SynopsisBy Walter G. Brusey
This paper describes a comprehensive pile test program conducted at John F. Kennedy International Airport (JFKIA) to evaluate pile types and design capacities ranging from 890 to 4450 KN (100 to 500 t
Jan 1, 2000
-
Micropiles In Soft Florida LimestoneBy James D. Hussin
The Florida limestone is a relatively soft rock which presents many challenges to engineers when designing deep foundations. One alternative is micropiles which have grown significantly from their ear
Jan 1, 2003
-
Ground Improvement Resulting From Installation Of Drilled Displacement PilesBy Timothy C. Siegel
Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement o
Jan 1, 2007