    Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles

    By Norm Kirk, Robert Bittner

    "The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca

    Jan 1, 2017

  • DFI
    Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained Soils

    By W. Morgan NeSmith

    A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun

    Jan 1, 2008

  • DFI
    Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information System

    By Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler

    Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017

  • DFI
    A Sound Concept that Deserves to Be Expanded

    By Deep Foundation

    Whenever an organization launches an initiative, the question arises whether that initiative has staying power. Or is the initiative, as is quite often the case, merely a fad; that is, just an activit

    May 1, 2023

  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    CFA Secant Piling In California

    By Philip Derbyshire, Dale J. Scheffler

    "Continuous Flight Auger (CFA) piling is a variation of Augered Cast-In-Place (ACIP) or augercast piling. In both cases a continuous auger with a hollow stem is used to drill a hole and a pile is form

    Jan 1, 2005

  • DFI
    Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity Analysis

    By Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe

    The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc

    Jan 1, 2017

  • DFI
    Measured And Modeled Settlements Of Power Plant On Piled Raft Foundations

    By Gianni O. Chieruzzi

    A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

  • DFI
    Development of Fiber-Reinforced Soil Improvement Using CSM Method

    By Toshio Yonezawa, Helmut Florian, Herbert Kuh, Masamichi Aoki, Takao Koono, Franz-Werner Gerressen

    "To increase the bearing capacity of the ground, soil improvement technique is often adopted. One advantage of soil improvement techniques is the fact, that the impact to the environment is low, as th

    Jan 1, 2015

  • DFI
    Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)

    By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi

    "A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

    Jan 1, 2017

  • DFI
    London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And Cooling

    By Peter Smith

    One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons

    Jan 1, 2010

  • DFI
    The World's Longest Directional Impact Driven Pile

    By Robert F. Stevens, Robin Givet, Kenneth Viking

    "Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660

    Jan 1, 2014

  • DFI
    Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002

    By Colin Curtis

    The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an

    Jan 1, 2002

  • DFI
    A Soil Quake Davisson Offset Method For Drilled Foundations

    By Michael Perlow Jr

    A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas

    By David S. Graham, Benjamin Turner, Paul J. Axtell

    Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an

    Sep 8, 2021

  • DFI
    Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”

    By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini

    "The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for

    Jan 1, 2016

  • DFI
    Depth Of Borings, Length Of Piles, Landslides, Erosion, And A Moose Hunt - A Case History Of A Comedy Of Mistakes

    By Bengt H. Fellenius

    An upgrading and straightening of a highway included building a bridge across a small river. A routine site investigation was initiated to determine the conditions for designing the foundation of the

    Jan 1, 1987

  • DFI
    Design And Specification Considerations For Environmental Cutoff Walls

    By Daniel Ruffing, Jeffrey Evans

    Vertical cutoff, or barrier, walls are an integral part of environmental site remediation efforts. Vertical barriers are commonly deployed to limit the influx of clean ground water and/or to control t