Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Synthetic Testing for Flotation

    By C. G. McLachlan

    INTRODUCTION The work described in the following paper was under-taken with a view to determining, if possible, the relative importance of some of the phenomena on which flotation seems to depend, in

    Jan 1, 1926

  • CIM
    The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold Corporation

    By P. W. Jensen

    Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,

    May 1, 2003

  • CIM
    Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test Results

    By Linda C. M. Elliot, Liangxue Liu

    "The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On

    Jan 1, 1997

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    A Discussion of Deep Drilling In the Blind River Area

    By D. S. Robertson

    More than 700,000 feet of diamond drilling was completed in the Blind River area between 1953 and 1958. Much of this drilling was at depths which are still not usual in North America. However, as the

    Jan 1, 1962

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    Non-Bauxite Sources of Alumina: A Survey of Canadian Potential

    By N. W. Bliss

    "Bauxite has been the almost universal ore of aluminum for about 100 years, with most of the world's reserves oc¬curring in the developing countries. As a result of fiscal and political activities pro

    Jan 1, 1976

  • CIM
    The use of wetlands for effluent polishing at Placer Dome, Campbell Mine

    By Benoit Bissonnette, David Gelderland

    "The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi

    Jan 1, 2003

  • CIM
    The Explosion in Hillcrest Mine, Alberta, September 19th, 1926

    By George Rice

    Foreword Following the explosion in the Hillcrest mine, which occurred in the evening of Sunday, September 19th, 1926, and in which two men lost their lives, the writer was invited by the Hon. J.E.

    Jan 1, 1928

  • CIM
    Experience with a Lamella Thickener at the Beaverlodge Operation of Eldorado Nuclear Limited

    By R. Bruce Ferguson

    "IntroductionThe Beaverlodge Operation of Eldorado Nuclear Limited is a uranium property located near the north shore of Lake Athabasca about 7 miles from Uranium City, Saskatchewan.The mill is a 2000

    Jan 1, 1975

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • CIM
    The Treatment of Roaster - Off Gases at Campbell Red Lake Mines Limited

    By J. S. Roberts

    "Campbell mines has been in operation since 1948. Part of the process consists of roasting of a flotation concentrate which contains arsenopyrite.At present operation level the milling rate averages a

    Jan 1, 1976

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013

  • CIM
    Blast simulation surface and underground with the SABREX model

    By G. K. Jorgenson, S. H. Chung

    "IntroductionThe SABREX Blast Modelling Program was developed jointly by the companies of the ICI Explosives Group, of which C-I-L Inc. is a member. SABREX (Scientific Approach to Breaking Rock with E

    Jan 1, 1987

  • CIM
    A Review of Long Distance Commuting Mines: Implications for Northern Mining Communities

    By Silvana Costa

    In the last two decades, there have been nearly no new mining towns built in Canada. Governments and mining companies have viewed long distance commuting (LDC), commonly known as fly-in-flyout or fly-

    May 1, 2004

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016