Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Simulation of Airflow Changes in a VOD System and Evaluation of Energy Benefits through VREX Modeling

    By G. G. Li

    "A dynamic ventilation-modeling package, VREX, was used to simulate the mine activities through tracking the equipment movements in underground workings and determine the airflow demand for a new prod

    Jan 1, 2019

  • CIM
    Thermodynamic and Process Evaluation of Direct Blister Copper Smelting

    By Xian Jian Guo, Lei Li, Hua Wang

    Direct smelting of copper concentrate to blister copper has the advantages of energy saving and environmental protection. There has been a lot of effort invested in process development including test

    Jan 1, 2019

  • CIM
    Winning the Metals Race

    By J. McCreedy

    This paper reviews new methods of exploration for metals and new techniques of mining the deposits and extracting the metals from their ores. Examples of mining innovations are taken from Inco's Thomp

    Jan 1, 1971

  • CIM
    Effect of Heat Treatment on Stress Corrosion Cracking Resistance of A206 Aluminum Alloy

    By G. Morin, S. Amira, F. Chiesa, B. Duchesne

    "The effect of heat treatment on the stress corrosion cracking (SCC) resistance of A206 aluminum alloy was studied using the breaking load test according to ASTM G139 standard. This method uses the re

    Jan 1, 2016

  • CIM
    Relation of fluid inclusion geochemistry to wallrock alteration and Iithogeochemical zonation at the Hollinger-Mclntyre gold deposit, Timmins, Ontario, Canada

    By Ted J. Smith, Stephen E. Kesler

    "Zonation patterns are welt developed in the mafic metavolcanic rocks that host epigenetic quartz-carbonate-gold vein mineralization at the Hollinger-McIntyre deposit. Carbonate alteration assemblages

    Jan 1, 1985

  • CIM
    Oxidative pressure leaching of zinc concentrates

    By E. G. Parker

    "Sherritt's zinc pressure leaching process converts zinc sulphide concentrates directly to zinc sulphate solutions and elemental sulphur. Thus, one pressure process step replaces both the roastin

    Jan 1, 1981

  • CIM
    Underground Crusher Dust Control at Lake Shore Mine

    By O. E. Andrew

    THE object of this paper is to present a brief summary of the dust control system in use on the 3,825-foot level at the jaw crusher station, Lake Shore mine. During the years 1936 and 1937, dust surv

    Jan 1, 1941

  • CIM
    Modifications to Flotation Cells to Improve Metallurgical Performance at Falconbridge Nickel Mines Concentrators

    By Makarinskym F. M.

    "This paper describes mechanical and operating modifications that were and are being made to current on-line flotation cells at Falconbridge Nickel Mines concentrators. Improved metallurgical performa

    Jan 1, 1982

  • CIM
    Development and Implementation of an Expert System for Grinding Control at the Dome Mine

    By John Eggert, Paul Benford

    "Since 1982, Placer Dome Inc. -Dome Mine has steadily increased mill throughput. Tonnage has increased from a nominal design capacity of 3000 short tons per day, attained in 1985, to 4130 stpd by the

    Jan 1, 1994

  • CIM
    Where Did the Gold and Silver Go? (f8d50070-6e64-4c07-a792-b7c79c525953)

    By John C. Loretto

    "Answers to some of the problems ofRecovery and Metallurgical AccountingIn Gold and Silver Hydrometallurgical PlantsThe start-up over the last few years of new hydrometallurgical plants for the recove

    Jan 1, 1982

  • CIM
    Deep hardrock mining — the future

    By D. M. Morrison

    "The most important factor in Canadian mining is not the operating cost of current projects but the availability of capital for future projects. The future of mining at depth will be producing ore fro

    Jan 1, 1996

  • CIM
    REE and background Au/Ag evidence concerning the origin of hydrothermal fluids in the Cape Ray electrum deposits, southwestern Newfoundland

    By Derek H. C. Wilton

    "The Cape Ray Fault Zone of southwestern Newfoundland contains two notable electrum/ base metal sulphide quartz vein lode occurrences hosted by two contrasting lithological units, viz. a graphite schi

    Jan 1, 1985

  • CIM
    The measurement of radon emanation rates in a Canadian cut-and-fill uranium mine

    By J. W. M. Porritt, K. C. Cheng

    Knowledge of radon emanation rates from uranium-bearing rocks is essential to the design of mine ventilation systems for uranium mines. Measurements of equilibrium ratio between radon and its daughter

    Jan 1, 1981

  • CIM
    Geology of the Nemeiben Lake ultramafic complex, North-Central Saskatchewan

    By N. D. MacFarlane, D. J. Mossman

    "The Nemeiben Lake ultramafic complex, in the Churchill Province of the Canadian Shield in north-central Saskatchewan, is a small I. 6-km circular plug largely composed of high-alumina pyroxene cumula

    Jan 1, 1982

  • CIM
    The structure of the Strathcona Mine copper zone

    By M. K. Abel

    "The Strathcona Mine is located in Levack Township on the North Range ofthe Sudbury Basin. The main orebody consists of pyrrhotite-pentlandite-chalcopyrite mineralization associated with an embayment

    Jan 1, 1981

  • CIM
    Matching mining methods to complex coal geology

    By B. J. Morash

    "The six mineable coal seams at Quintette Coal Limited (QCL) vary in thickness from 0.75 m to 9.5 m and include waste partings varying from 0.2 m to 4 m thick. They are highly faulted and folded in so

    Jan 1, 1988

  • CIM
    Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988

  • CIM
    Maintenance Engineering - Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988

  • CIM
    Toward an inventory of aggregate resources in Newfoundland and Labrador

    By R. Ricketts, D. G. Vanderveer, F. Kirby

    "A program of mapping, sampling and testing to determine the potential of the aggregate resources throughout Newfoundland and Labrador was commenced in 1978. A 6-km-wide corridor parallel to all trans

    Jan 1, 1982

  • CIM
    Electric furnace matte tap hole developments at Falconbridge Limited

    By I. A. Cameron, F. Ham, R. Sriram

    "Planned increases in electric furnace productivity and higher matte temperatures needed for the Sudbury Smelter's S02 Abatement Plan, require an improved matte tap hole. Since startup in 1978, t

    Jan 1, 1995