Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Bench and Pilot Scale Test Programs to Specify Autogenous Grinding Circuits

    By C. J. Farrow, M. J. Smith

    "Bechtel has managed a number of test programs to establish autogenous grinding circuits and size mills for a variety of ores.This paper outlines the procedures whereby bench scale and pilot plant tes

    Jan 1, 1982

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • CIM
    Advanced Control for Mineral Processing: Better Than Expert Systems

    By Robert K. Jonas

    "Minerals processors can improve production by using the best available control technology to control their operations. Many mines use expert systems that can provide improved results over manual or b

    Jan 1, 2008

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    Using the SUPASIM Flotation Model to Diagnose and Understand Flotation Behavior from Laboratory through to Plant

    By M. P. Hay

    "For a model to be successful it must address the concerns and needs of a target audience. Further, the model must demonstrate the same patterns of behaviour as the real system, and need only be compl

    Jan 1, 2005

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Froth Based Indicators as a Tool for Flotation Diagnosis

    By Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent

    "Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte

    Jan 1, 2006

  • CIM
    Mill Operations - Lean and Keen

    By P. R. Richardson

    "Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,

    Jan 1, 1988

  • CIM
    25 Years of Collector Development for Sulphide Mineral Flotation

    By B. S. Fee, R. R. Klimpel

    "Froth flotation is the most widely used and economic means of concentrating metal sulfide ores such as those containing copper, lead, zinc, nickel, molybdenum, and pyrite. Also recoverable are other

    Jan 1, 1987

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    Hydraulic Calculation of Gravity Transportation pipeline System of Cemented Coal Gangue Backfilling in Suncun Coal Mine, China

    By Q. Zhang

    The necessary capability of the gravity transportation pipeline system for cemented coal gangue backfilling at the Suncun Coal Mine, China, is about 74.4 m3?h-1 according to mining production and work

    May 1, 2007

  • CIM
    The Canada Tungsten Property, Flat River Area, Northwest Territories

    By L G. White

    During 1958, prospecting parties working for the Mackenzie Syndicate in the Flat River area of the Mackenzie mountains, Northwest Territories, identified tungsten mineralization and located the proper

    Jan 1, 1963

  • CIM
    The Installation and Operation of Heap Leaching Test Facilities

    By J. Maheu

    Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test

    Jan 1, 1982

  • CIM
    An Evaluation of Flotation Reagents at the Majdanpek Copper Mine

    By P. V. Avotins, I. Djurkovic, D. R. Nagaraj, M. Grunjic, A. Day

    "As part of a major reconstruction and expansion of the Majdanpek Copper Mine, an investigation and optimization of the flotation collector regime was undertaken. The flotation response of the major m

    Jan 1, 1992

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    Effect of environmental variables on pitting corrosion

    By S. Rajeswari, D. Gopi

    "Pitting corrosion inhibition of 304 stainless steel (SS) in groundwater with a ternary inhibitor mixture (phosphonic acid + bivalent cation + various surfactants) was studied with different environme

    Jan 1, 2003

  • CIM
    The Extended Mathews Stability Graph: Quantifying case history requirements and site?specific effects

    By Penny C. Stewart

    Narrow vein underground stope design engineers in Australia have expressed significant interest in the requirements and methodology for developing site-specific stability charts. This is largely due t

    Oct 1, 2001