Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Mineralogy of the Tolukuma Epithermal Gold Deposit, Papua New Guinea: Occurrence, Paragenesis and Controls on Formation

    By Leach T

    The Tolukuma Gold Deposit is hosted by metamorphic and volcanic rocks, and igneous intrusions. Dilatant structures for the main veining appear to be provided by post-metamorphic flexure/faulting; syn-

    Jan 1, 1993

  • AUSIMM
    Sustainable Mineral Resource Management Systems - Delivering Resource Growth Within Sarbanes-Oxley Requirements at Gold Fields Ghana, Abosso Goldfields Ltd, Damang Mine (AGL)

    By M Brewster

    Goldfields Abosso Goldfields Limited (AGL) is a Ghanaian registered company that owns and operates the Damang Gold Mine. Gold Fields Ghana Holdings Limited holds a 71.1 per cent interest in AGL. The D

    Jan 1, 2007

  • AUSIMM
    Process Requirements for the Direct Condensation of Both Zinc and Lead as Metals in the Polymetallic Smelting of Zn-Pb-Cu Sulphides

    By Warner N. A

    There is an inherent problem in producing simultaneously lead, zinc and copper as metals in a single polymetallic smelting furnace. It relates to the condensation of lead and zinc from the gas phas

    Jan 1, 1989

  • AUSIMM
    Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling (95e85735-3d90-4a78-b6e4-557395ba00bb)

    By Gleadow AJW, Foster DA, Kohn BP, Raza A

    A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the southeastern highlands and along the continental margin of Australia provides

    Jan 1, 1995

  • AUSIMM
    Penetration behaviour of an initial sinter melt into substrates of different ore types

    By S Hapugoda, H Han, L Lu

    Sinter quality depends heavily on the mineral phases, textures and physical structure of the sinter, which are formed upon solidification of the sinter melt. The interaction of sinter initial melt wit

    Nov 8, 2021

  • AUSIMM
    Design Of Longhole Open Stoping At New Broken Hill Consolidated Limited With Particular Reference To Sloped Wall Mining

    The progress of longhole open stoping (LHOS) at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is described. The design of a novel sloped wall longhole stoping me

    Jan 1, 1983

  • AUSIMM
    Instantaneous Outbursts of Coal and Gas - A Review

    Instantaneous outbursts of coal and gas have occurred in Australia in the Sydney Coal Basin since 1895 and in the Bowen Coal Basin since 1954. The largest has been about 500 tonnes of coal and so thei

    Jan 1, 1983

  • AUSIMM
    The Zinc Refluxer at Cockle Creek

    By Cunningham DA

    Plant based on the New Jersey refluxing process has been installed at the Cockle Creek Works of Sulphide Corporation Pty. Limited to refine portion of the zinc output from the Imperial Smelting Fur

    Jan 1, 1969

  • AUSIMM
    The Geology and the Highly Selective Open Cut Mining Method of the Small, Irregular, Narrow and Low Grade St. George Orebodies at Mount Magnet

    The St George orebodies are situated within the tectonically disrupted eastern limb of the Boogardie Syncline.Highly disturbed rafts of banded chert formations occur within a sequence of felsic volcan

    Jan 1, 1984

  • AUSIMM
    The Application of Rubber and Polyurethane Screens for Sizing, Dewatering and Heavy Medium Recovery

    We are all no doubt aware that with today's high costs it is more important than ever to get the maximum possible return on capital invested in the mining industry. Screening is an important a

    Jan 1, 1984

  • AUSIMM
    A Generalized Account of the Paraburdoo Iron Orebodies

    By Jackson D. G

    Iron ore mineralisation in the Paraburdoo environs is known to extend almost continuously over a strike length of 55 kilometres. Six formations of the Mount Bruce Supergroup con- tain high grade min

    Jan 1, 1979

  • AUSIMM
    Grade Recovery Optimisation Using Data Unification and Real Time Gross Error Detection

    By R Linares

    The efficient operation of any modern metallurgical facility depends on the accurate measurement and estimation of flow rates, inventories, and composition of their intermediate and final products. Al

    Jan 1, 2005

  • AUSIMM
    Determination of Groundwater Inflow Rates for Longwall Mining, German Creek, Bowen Basin, Queensland

    By Phillips RN

    Semi-confined, trachy-andesite sills which overlie the German Creek Seam, within the critical tensile strain zone, form major groundwater hazards to longwall mining at the German Creek underground

    Jan 1, 1988

  • AUSIMM
    Design and Construction of the City West Cable Tunnel, Sydney Australia

    EnergyAustralia is a state-owned corporation in the state of New South Wales, whose responsibility includes ownership and management of an electricity distribution network. Expansion of the high volta

    Jan 1, 2008

  • AUSIMM
    Merrill-Crowe/Carbon-in-Pulp an Economic Evaluation

    By King ND

    This paper presents an economic study comparing two gold recovery processes, zinc precipitation (Merrill-Crowe) and carbon-in-pulp (CIP). Capital, operating, and gold losses costs from an actual CIP

    Jan 1, 1982

  • AUSIMM
    Lode Controls of the Hodgkinson Goldfield, Northeastern Queensland

    The Hodgkinson goldfield contains over 50 separate lodes which have produced 9.7 tonnes of gold from ore averaging 37 g/t. The gold-quartz.lodes are spatially separate from tin and base metal minerali

    Jan 1, 1991

  • AUSIMM
    Tin Exploration in Indonesia - Problems and Solution

    By Umar N

    Traditional exploration has been undertaken by both local and overseas experts to discover tin deposits in Indonesia over almost 300 years. Indonesia is part of a tin belt which runs from Myanmar in

    Jan 1, 1996

  • AUSIMM
    Burden Movement Experiments Using the Hybrid Stress Blasting Model (HSBM)

    By G Chitombo, M Ruest

    In surface mining, studies of the kinematics of blasted rocks using high speed film/video image analysis have allowed the estimation of the starting time, direction and magnitude of visible movement o

    Jan 1, 2007

  • AUSIMM
    The Effect of Resin Thickness on Bolt-Grout-Concrete Interaction in Shear

    By M S. N Hadi, J Hossein

    Numerical modelling is extensively used in civil and mining engineering applications because of cost and risk problems associated with different experimental studies. In this study, the effect of resi

    Jan 1, 2005

  • AUSIMM
    Mineral Reserve Estimation for Project Development Purposes

    By McMahon DW

    The major components of a mineral reserve estimate for project development purposes are described with respect to sampling, geology, estimation methods, mining factors, metallurgical factors, envi

    Jan 1, 1983