Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Effluent Treatment System at Pasminco Metals - EZBy Plamer D. J, Newman O. M G
The Effluent Treatment System at Pasminco Metals - EZ (PMEZ) was commissioned in December, 1991 and has operated satisfactorily, ensuring that aqueous discharges from PMEZ comply with the Tasmanian
Jan 1, 1993
-
A Practical Method of Approach to the Problems of Mineral FlotationResponse of a mineral to anionic and cationic flotation reagentsvaries with the nature of the mineral and the particle size. A ruleis deduced for the selection of the correct type of reagent, which le
Jan 1, 1963
-
A Bounding Surface Model for Sand Subjected to Blast-induced VibrationsBy L M. Zhang, T H. Xu, J Zhao
Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc
Nov 5, 2014
-
Representative Sampling of Animal Feed and Mixtures in the Danish Agricultural SectorBy K H. Esbensen
Sampling of grain, animal feeds (solid and liquid) including important mineral mixtures in the Danish agricultural sector is subject to an ongoing investigation with the objective of improving existin
Jan 1, 2005
-
Profit Drivers in the Open Cut Coal IndustryThe æProfit Driver ModelÆ is a tool which builds costs from first principles and integrates revenue, costs and physical mining parameters and, hence, can quantify the impact and leverage on profit. In
Jan 1, 2000
-
Trading Water Access Entitlements in QueenslandBy A Stasi, B Brice
Water is a limited and precious resource in Australia. Because of the increasing demand for water from all sectors of the economy and the variability in supply, efficient management of water resources
Jan 1, 2006
-
Apatite from Alkaline Complexes û Geological Aspects, Behaviour in Mineral Processing and Characterisation TechniquesBy M M. M LT Tassinari, A B. Braz, L M. SantÆAgostino, C Ulsen
Several mineral resources have been recognised to alkaline igneous rocks. In general, these mineralisations present low P grades, so a complex concentration process is required to achieve commercial g
Jan 1, 2008
-
The Pre-Undercut Caving Method at the El Teniente Mine, Codelco ChileBy A Bonani, R Molina, H Constanzo
With conventional undercutting sequence the infrastructure on the production level often has a short serviceable life before major rehabilitation is necessary and is characterised by high maintenance
Jan 1, 2000
-
The Big Bend and Cobra Molybdenum Prospects - A ComparisonThe Big Bend and Cobra molybdenum prospects which occur near the margin of the Karamea Batholith in the Northwest Nelson molybdenum province are compared. The Big Bend Prospect is a 3000 m by 800 m ar
Jan 1, 1979
-
Power Supply for Remote Mining DevelopmentsBy Bailey H. W
Power supply for remote mining developments is compared with supply to the general public with the conclusion that the private power plant operator has many opportunities to minimise his costs whi
Jan 1, 1973
-
Environmental Performance of Large Open Pits in Western Australia - A PerspectiveBy Lindbeck K
The mining industry in Western Australia is a large sector of the WA economy providing $12 billion (1993) of the export income for the State. Historically, mining in WA developed from traditional pr
Jan 1, 1994
-
Block Model Data Reduction and Sensitivity AnalysisBy J E. Everett
Maximising ore tonnage at a selected target grade requires that appropriate ore identification criteria be established. Iron ore mining block models may consist of many millions of estimated blocks, e
Jul 13, 2015
-
Selective Mining at Thabazimbi Iron Ore Mine (South Africa)By W A. van der Westhuizen
Selective mining played a major role in saving a mine and a communityÆs existence as well as creating a working culture that is the model for all KumbaÆs mines. The successes that resulted from select
Jan 1, 2005
-
Close-Out - The Risk of Too Much WaterAt many locations in Australia the decommissioning of mining operations will require the disposal of excess water. If the water is contaminated its disposal may be restricted by government guideline
Jan 1, 1994
-
Multiskilling at the Hellyer ConcentratorBy Campbell J
After eighteen months of discussions with employees and their trade unions, multiskilling was introduced at the Hellyer concentrator in early 1989, coinciding with the plant commissioning. Multiskil
Jan 1, 1991
-
The Electrostatic Precipitation of Suspended Particles from GasesBy Marshall K. I
THE problem of satisfactorily eliminating the fumes and dust which are unavoidably produced in various metallurgical and manufacturing industries is one which has received considerable attention in th
Jan 1, 1923
-
Industrial Ecology and Metal ProductionAs the worldÆs population and global standard of living increase, the role of metals in the economy will not diminish in the 21st century, despite substitution and dematerialisation trends. Industrial
Jan 1, 2000
-
Planning and Cost Criteria for Mining InfrastructureBy Mahony BK
This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans
Jan 1, 1983
-
Regulation of Overland Flow in Queensland - Implications for the Mining IndustryBy K Marler
The Water Act 2000 includes provisions to manage the take of overland flow water. Overland flow water is water that runs across the land after rainfall either before it enters a watercourse, after it
Jan 1, 2006
-
The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NTBy Hein K. A A
The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.
Jan 1, 1994