Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Special Stainless Steels in the Smelting and Refining of Non Ferrous Metals

    By Bukovinsky SB

    The smelting, refining and hydrometallurgical operations practised in the winning of non-ferrous metals are associated with severe aqueous and high temperature corrosion problems.With the increasing c

    Jan 1, 1985

  • AUSIMM
    Gold, Calcite, and Other Materials on Activated Carbons from CIP Pplants

    By Woodcock J. T, Sparrow G. J

    Activated carbon particles obtained from a number of Australian CIP operations were examined with an optical and a scanning electron micro- scope and an electron microprobe. External surfaces, and po

    Jan 1, 1988

  • AUSIMM
    Support Performance Prediction for Hydraulic Fills

    By Hill J. R M, McDonald M. M

    A prediction technique for support perfor- mance of hydraulic backfill in narrow stopes is applied to two stopes separated vertically by a sill pillar. Predicted stope wall closures and fill pressu

    Jan 1, 1973

  • AUSIMM
    Mine Water Resource Management Systems

    By Gillies A. D S, Lee A. H

    The major operational objectives of a mine water resource management system (WRMS) are to supply the water needs of the mine and mill, to minimise disturbance to mining due to rainfall flooding or see

    Jan 1, 1992

  • AUSIMM
    Advances in Dense Medium Cyclone Plant Design

    By G Gibson, B Bessen

    In coal preparation, large dense medium cyclones (DMC) at low pressure heads (typically 9D where D = cyclone diameter) are the norm. This contrasts with high density mineral applications where, largel

    Jan 1, 2009

  • AUSIMM
    Grade Modelling Reconciled to Open Pit Mining at the Golden Plateau Mine, Cracow, Queensland

    The Golden Plateau Mine is located at Cracow in central Queensland, 350 kilometres north west of Brisbane. The mine was operated by Golden Plateau NL as an underground mine from 1933 to 1976 with a

    Jan 1, 1994

  • AUSIMM
    The distribution of gold between bullion, speiss, and slag during zinc-lead smelting

    By Holliday R, Floyd JM

    A laboratory investigation was carried out to determine the distribution of gold between the products of lead-zinc concentrate smelting in the Imperial Smelting Furnace (ISF). Bullion, speiss and

    Jan 1, 1986

  • AUSIMM
    Geostatistical Modelling of the Hilton and Mount Isa Lead-Zinc Orebodies, Mount Isa, Australia

    By Raymond G. F

    Geostatistics - a tool used by geologists and mine planning engineers to estimate grades and rapidly evaluate alternative mining strategies has reached an advanced stage of development for the silver-

    Jan 1, 1993

  • AUSIMM
    The Underground Fire, Sealing and Subsequent Recovery of Liddell State Coal Mine

    On Monday, October 25th, 1971 at approximately 12.15 a.m. the night shift proceeding underground discovered smoke at No.1 and No-3 cut throughs on the eastern side of the belt heading and in close

    Jan 1, 1972

  • AUSIMM
    Resistivity Surveys for Groundwater at Depot Springs, Near Agnew, Western Australia

    By Omnes G

    Sixty Schlumberger electrical soundings were carried out in the Depot Springs area, near Agnew, Western Australia as part of an investigation into the availability of groundwater for the Agnew nic

    Jan 1, 1975

  • AUSIMM
    Grade Control Techniques at Paddington Gold Mine

    By Amos QG

    The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substan

    Jan 1, 1986

  • AUSIMM
    Long-Term Erosional Development of Rifted Continental Margins: Toward a Quantitative Understanding

    Two independent sets of observations from rifted con-tinental margins suggest a way to reach a quantitative under-standing of how the topography of rifted margins erodes. First, a prominent erosional

    Jan 1, 1990

  • AUSIMM
    Preming Investigations for the Prediction of Hazards Ahead of Faces

    The most appropriate technology needs to be applied to premining geological investigations to achieve reliable data for predictions of geological conditions ahead of mining. The paper describes th

    Jan 1, 1988

  • AUSIMM
    Post-Permian Subsidence and Tectonics, Vulcan Sub-Basin, North West Shelf, Australia

    Tectonic subsidence plots have been calculated for well, extrapolated-well and significant off-well (seismically-based) locations in the Vulcan Sub-basin and adjacent highs (western Timor Sea). The su

    Jan 1, 1990

  • AUSIMM
    Application of Computer Graphics in Mine Design

    By Van Barnefield J G

    This paper is based on an evaluation project engaged upon jointly by Mount Isa Mines Limited nnd" IBM Austra]ia Limited. Mount Isa Mines Limited produces most of its copper from large underground o

    Jan 1, 1977

  • AUSIMM
    Economic Investigations on Sub-Level Stoping with Consolidated Rockfill

    By Heidecks C

    Sub-level stoping with consolidated rockfill is the main method for mining steep dipping baryte and fluorite veins in Germany. Drifting is fully mechanised using drill jumbos, LHD units and shotcret

    Jan 1, 1995

  • AUSIMM
    The Planning and Design of the Prospect to Pipehead Tunnel

    The Prospect to Pipehead Tunnel is a component of the Sydney Water Board's multi-million dollar Drinking Water Quality Program to improve the quality of Sydney's potable water supply to meet

    Jan 1, 1993

  • AUSIMM
    Resource and Geoscience Modelling for Exploration and Land Use Planning in NSW: The Mineral Resource Audit

    By Barnes R. G, Agostini A, Lewis P. C

    The Mineral Resources Audit is a five-year Program established to produce a comprehensive and objective assessment of the mineral resources of New South Wales, including prospective resources. The

    Jan 1, 1995

  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    Geology and Resource Estimation at the Panguna Porphry Copper/Gold Mine Papua New Guinea

    Daily geological mapping of the Panguna porphyry copper/gold system since mining began in 1971 has provided a good basis for resource estimation and mine planning as the mine and estimation methods

    Jan 1, 1987