Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Golden Cross Project, Mill Closure, Mine Rehabilitation and Drainage Contract

    The Golden Cross project was a joint venture between Coeur NZ Ltd (80 per cent) and Viking Mining Company (20 per cent). The site is located in the Waitekauri Valley, 8 km north-west of Waihi, on the

    Jan 1, 2002

  • AUSIMM
    On-line Measurement of Magnetic Susceptibility for Titanium Minerals Processing (07ecfeb8-974f-4465-9d0b-cf00ad6e74cf)

    By P N. Holtham

    Magnetic separation is routinely used in the processing of titaniumminerals, and the efficiency of these operations can be determined bymeasuring the magnetic properties of the process streams. The va

    Jan 1, 2001

  • AUSIMM
    Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologies

    By M J. Shearer

    An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume

    Aug 28, 2017

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Stratigraphy and Sedimentary Features of the Tertiary Yandi Channel Iron Deposits, Hamersley Province, Western Australia

    By M E. Barley, A D. George, M Kneeshaw

    Detailed pit and outcrop mapping of sedimentary rocks and their alteration is providing insights into fluvial processes that operated during deposition of the world-class Yandi channel iron deposit. F

    Jan 1, 2002

  • AUSIMM
    The Influence of Some Variables on the Brinell Hardness of Lead

    During the extensive research which has been conducted in the Metallurgy Department of the University of Melbourne, into the properties of lead and its dilute alloys, the Brinell test has been used fo

    Jan 1, 1940

  • AUSIMM
    Sublevel caving a narrow vein mine – Pajingo’s case study

    By J F. Carswell, G Cheshire

    The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin

    Mar 15, 2021

  • AUSIMM
    BHP Iron Ore Protocol for Mine Closure

    By Hillis R

    As part of BHP Iron Ore's policy and goal of achieving a high standard of environmental management within its operations, a protocol for mine closure has evolved. The need to demonstrate sound

    Jan 1, 1996

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • AUSIMM
    The Porgera Gold Deposit Structure, Alteration and Mineralisation

    By T Leach, B Fulton, R Stewart

    Gold mineralisation at Porgera is inferred to have been derived from a deep differentiated magmatic source which is capped by a series of (now tilted) inward dipping sills and stocks, which comprise t

    Jan 1, 1995

  • AUSIMM
    Use of Small-Scale Passive Systems for Treatment of Acid Mine Drainage

    By P Gunn, M Watts

    The general goal of passive acid mine drainage (AMD) treatment is to reduce levels of acidity and metals to acceptable levels. Most treatment systems use either an oxidising or a reducing strategy. In

    Jan 1, 2005

  • AUSIMM
    The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term Planning

    By T Berryman, C Adams, L Griesel, C Buxton

    The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g

    Aug 18, 2014

  • AUSIMM
    Quantification and Controls on as Distribution in Westland, NZ

    By D Craw, J Pope

    The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised

    Jan 1, 2006

  • AUSIMM
    Biogeochemical Prospecting for Zinc and Lead in the Te Aroha Region of New Zealand

    The uptake of zinc, lead, and copper by the flora of the Tui Base Mine area near Te Aroha is described.Vegetation and soil samples were taken from two traverses across the Raukaka Lode. Results. after

    Jan 1, 1969

  • AUSIMM
    RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground Management

    By P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott

    Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management

    Nov 5, 2014

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zealand

    By P E. H Gregg, D Horne, R B. Stewart, N Bolan

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit

    Jan 1, 1995

  • AUSIMM
    The Coromandel Epithermal Gold-Silver Province: A Result of Collision of the Northland and Colville Volcanic Arcs in Northern New Zealand

    By D N. B Skinner

    Changes in the configuration of late Cenozoic volcanic arcs related to Pacific-Australian plate convergence in northern New Zealand may have localised large-scale epithermal gold-silver mineralisation

    Jan 1, 1997

  • AUSIMM
    The Determination of Silver in Lead Sulphide Concentrate by Atomic Absorption Spectroscopy

    By Greaves M. C, Amos M. D

    A study was made of the instrumentation and technique of atomic absorption spectroscopy developed by Walsh of the Commonwealth Scientific and Industrial Research Organisation (C.S.I.R.O.), Australia.T

    Jan 1, 1961

  • AUSIMM
    Different Methods of Alluvial Mining in Victoria

    Amongst representative men directing alluvial mining of erations in Victoria, some difference of opinion exists as to the best system of working the deep leads. The developmental operations of shaft-s

    Jan 1, 1902