Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore Mine

    By B Yeganeh, A Sam, A Kohsari

    The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa

    Jan 1, 2007

  • AUSIMM
    Mine to Mill Reconciliation - Three Case Studies

    By J T. Carswell, N A. Schofield

    Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the

    Nov 20, 2012

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Integration of Geological and Geotechnical Data for Three-dimensional Modelling

    By K Zunica, A R. Penney

    The principles of three-dimensional geological modelling are well understood and routinely used. Sample data is collated and geostatistical tools used to ensure that sample data is suitable for its en

    Aug 18, 2014

  • AUSIMM
    Uncertainty in Soil Sampling ù A Case Study

    By K Luthbom, A Lagerkvist

    According to the Swedish Environmental Protection Agency, the number of potentially contaminated sites in Sweden is approximately 40 000. The funding for remediation from the Swedish Government alone

    Jan 1, 2005

  • AUSIMM
    Geostatistics and Sample Numbers from an Acid and Metalliferous Drainage Perspective

    By C Linklater, A Garvie, D Kentwell

    Various Australian and international regulatory bodies (Environmental Protection Authority, 2015) require an early assessment of the geochemistry of waste rock. This usually includes estimates of the

    Jun 28, 2016

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    Proposed Government Security Controls for Explosives and Ammonium Nitrate in Western Australia

    By B Roberts

    The Department of Industry and Resources (DoIR) is responsible for several sets of legislation, which, among other things, regulate the storage, handling and transport of dangerous goods as well as ev

    Jan 1, 2004

  • AUSIMM
    Process Control and Flocculant Optimisation of Tailings Thickeners at PT Freeport

    By M Simanjuntak, A M. Supomo

    PT Freeport IndonesiaÆs copper/gold operation disposes of approximately 222 000 dry metric tonnes of tailings per day via two thickeners. Reduction of the flocculant dosage rates in each of the tailin

    Jan 1, 2003

  • AUSIMM
    Critical state soil mechanics in filtered TSF design

    By J Rola

    This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro

    Jul 1, 2021

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Managing the Transition from Low Stress to High Stress Conditions

    The transition from low stress to high stress conditions is a challenge eventually faced by most mines in Australia that extend to depths greater than (generally) about 1000 m. In areas with strongly

    Nov 25, 2010

  • AUSIMM
    Developing technologies for a complex orebody

    By G Anderson, V Lawson, P Voigt

    Glencore operates zinc concentrators at both Mount Isa and McArthur River. Both orebodies have a history of complexity and required the development of new technologies to maximise the value from thes

    Nov 21, 2018

  • AUSIMM
    Mass Blasting for Mine to Mill ù The AT04 Mass Blast, Kanowna Belle Gold Mine

    By D Kay, M Lovitt

    Mass Blasts are generally required at the completion of longhole stoping cycles to maximise the recovery of ore from a specific orebody. During the course of mining, the practice is to leave pillars o

    Jan 1, 2002

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    On the development of a viscosity model for molten multicomponent slag systems with several glass-forming, amphoteric and modifier oxides

    By G M. Zhomin, A S. Arkhipin, A Kondratiev

    Viscosity of multicomponent slags is one of the crucial physicochemical properties for many industrial processes and technologies. While the viscosity-temperature relationship of completely molten sla

    Aug 21, 2024

  • AUSIMM
    Direct observation of the fayalite slag formation behaviour from large SiO2 grains

    By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami

    The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea

    Jun 19, 2024