Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
Examples of Groundwater Sustainability Issues in MiningFor Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st
Jan 1, 2006
-
New Ore Types from the Cauê Banded Iron Formation, Quadrilátero Ferrífero, Minas Gerais, Brazil – Responses to the Growing DemandBy L Q. Amorim
The mining district of the Quadrilátero Ferrífero (QF) in southeastern Brazil contributes to 70 per cent of the Brazilian iron ore production, which reached 370 Mt in 2010. Traditionally, four iron or
Jul 11, 2011
-
Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy SystemABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region
Jan 1, 1971
-
The 250 million ton per annum spatial digital twinBy M Pomery
BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and
Sep 18, 2023
-
Geological Modelling and Bench Face Survey to Improve Blasting FragmentationBy E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals provinceBy A Harburg, A Dendys, G Green
Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope
Aug 2, 2023
-
Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysisBy H Kurth
Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine
Mar 22, 2022
-
Organisational Factors in Fatalities and High Potential IncidentsBy N LaBranche, G Callinan
There has been a reduction in overall workforce in the mining industry during the current downturn; a corresponding reduction in fatalities and high potential incidents (HPIs) has not been observed. T
Jun 22, 2016
-
Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut OperationsAnglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines
Nov 25, 2010
-
Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade OptimisationBy C A. Myburgh, S Craig, K Deb
In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen
Nov 24, 2014
-
Anglo Coal Australia ù Graduates and the FutureAnglo Coal Australia (ACA) takes a proactive position with regards to attracting and retaining employees at a graduate level. Currently, ACA has graduates in its program across all disciplines: Mining
Jan 1, 2005
-
Viscosity measurement of FeO-SiO2 based slags under controlled oxygen partial pressuresBy S-C Shim, H-R Lee, Y Kang, H Shin
Since iron oxide and silicon oxide are major gangue components in various types of ore, FeO-SiO2 base slag, ie fayalite slag, has been often encountered in pyrometallurgical processes of non-ferrous m
Jun 19, 2024
-
Staying in the Game – the Importance of Engineering-based DecisionsBy P J. Fairfield
This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses
Jun 22, 2016
-
Application of enterprise optimisation considering ultra high intensity blastingBy J Pan
This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl
Nov 21, 2018
-
Optimisation of surface tailings storage and tailings backfill – a case studyBy B P. Wrench, N R. Steward, C Wu
A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi
Jul 23, 2018
-
Investigation of silica reduction effects on HPGR operation condition in case of iron ore increasing specific surface areaBy M Saghaeian, M Zare, V Sheikhzadeh, R Hejazi
High-Pressure Grinding Roll (HPGR) is one of the efficient methods for increasing the specific surface area (SSA) of iron ore concentrate for pellet feed production. HPGR grinding mechanism implies th
Aug 24, 2022
-
Utilising mine planning to deliver closure landforms through productive movementBy M Bettison, R Wright, N Taylor
The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat
Jul 25, 2018
-
Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging JuniorBy H Fletcher
Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P
Jul 11, 2011
-
Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic DamBy H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant
"The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable
Jun 15, 2016