Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Examples of Groundwater Sustainability Issues in Mining

    For Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st

    Jan 1, 2006

  • AUSIMM
    New Ore Types from the Cauê Banded Iron Formation, Quadrilátero Ferrífero, Minas Gerais, Brazil – Responses to the Growing Demand

    By L Q. Amorim

    The mining district of the Quadrilátero Ferrífero (QF) in southeastern Brazil contributes to 70 per cent of the Brazilian iron ore production, which reached 370 Mt in 2010. Traditionally, four iron or

    Jul 11, 2011

  • AUSIMM
    Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy System

    ABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region

    Jan 1, 1971

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

    By H Kurth

    Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine

    Mar 22, 2022

  • AUSIMM
    Organisational Factors in Fatalities and High Potential Incidents

    By N LaBranche, G Callinan

    There has been a reduction in overall workforce in the mining industry during the current downturn; a corresponding reduction in fatalities and high potential incidents (HPIs) has not been observed. T

    Jun 22, 2016

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation

    By C A. Myburgh, S Craig, K Deb

    In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen

    Nov 24, 2014

  • AUSIMM
    Anglo Coal Australia ù Graduates and the Future

    Anglo Coal Australia (ACA) takes a proactive position with regards to attracting and retaining employees at a graduate level. Currently, ACA has graduates in its program across all disciplines: Mining

    Jan 1, 2005

  • AUSIMM
    Viscosity measurement of FeO-SiO2 based slags under controlled oxygen partial pressures

    By S-C Shim, H-R Lee, Y Kang, H Shin

    Since iron oxide and silicon oxide are major gangue components in various types of ore, FeO-SiO2 base slag, ie fayalite slag, has been often encountered in pyrometallurgical processes of non-ferrous m

    Jun 19, 2024

  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018

  • AUSIMM
    Investigation of silica reduction effects on HPGR operation condition in case of iron ore increasing specific surface area

    By M Saghaeian, M Zare, V Sheikhzadeh, R Hejazi

    High-Pressure Grinding Roll (HPGR) is one of the efficient methods for increasing the specific surface area (SSA) of iron ore concentrate for pellet feed production. HPGR grinding mechanism implies th

    Aug 24, 2022

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging Junior

    By H Fletcher

    Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P

    Jul 11, 2011

  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016