Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    The Influence of Vacation Employment upon Career Paths

    As students progress further into a degree, the decision of vocation selection, and even more importantly û securing employment in a particular industry sector, can become quite daunting. However, wit

    Jan 1, 2005

  • AUSIMM
    Phase equilibria of Al2TiO5–Ti3O5 pseudobrookite solid solution in the Al2O3–TiOx system under various oxygen partial pressures

    By W Y. Kim, Y B. Kang, Y J. Park

    The phase equilibria in the Al2O3–TiOx system were investigated in wide ranges of temperature and oxygen partial pressure: 1300~1600°C and 10-16.6~10-8 atm, respectively. The equilibrium phases and th

    Aug 21, 2024

  • AUSIMM
    The Obuasi Mine - Longitudinal Retreat Mining Method Application and Challenges

    By F Owusu-Mensah, F Nsarko

    The Obuasi Mine has been in operation for the past 100 years. Within this period a host of mining methods have been employed during its various changing phases. The causes for the changes are multiple

    Mar 26, 2012

  • AUSIMM
    The Spent Pot Lining Treatment and Fluoride Recycling Project

    By G Swayn, J Harpley

    Spent Pot Lining (SPL) is an unavoidable waste product of the electrolytic process in the smelting of aluminium. SPL is considered to be a hazardous waste in various countries because it contains sign

    Jan 1, 2002

  • AUSIMM
    Determining the Pressure Pulse for an Air Blast

    By M A. Tuck

    Air blasts or wind blasts as they are termed in underground coal mining, occur in a number of types of underground mining where a void develops and the overlying or adjacent rock fails rapidly to allo

    Jul 1, 2013

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM Studies

    By O N. Antzutkin, W Forsling, K J. Pike an

    The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means

    Jan 1, 2005

  • AUSIMM
    Legacy tailings dams – asset or liability? A case study on sub-aqueous tailings reclamation

    By M Jones

    Legacy tailings storage facilities exist within operating mine sites across Australia. These tailings storage facilities are often viewed as rehabilitation liabilities but with considered assessment m

    Sep 1, 2024

  • AUSIMM
    Empowering tailings operators through education

    By D Brett

    The Paper presents the authors thoughts on how the mining industry should be improving the education of site personnel so they can provide a greater level of effective control of tailings dam safety i

    Jul 1, 2021

  • AUSIMM
    No assumptions, no surprises

    By G Deans, M Longbottom

    OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte

    Jul 1, 2021

  • AUSIMM
    Terratec Universal Raiseborer ù Raisebore Machine Technology

    Drilling underground can be a hazardous undertaking in many circumstances. Raiseboring and boxhole boring underground could form an integral part of the block caving production methodology and getting

    Jan 1, 2000

  • AUSIMM
    Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planning

    By M Ozkayhan, N Arslan

    "The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele

    Sep 20, 2017

  • AUSIMM
    Groundwater Management Guidelines for Mining Industry in Arid Western Australia - Examples from the Pilbara

    By D Abbott

    Mining in Western Australia places significant economic and environmental responsibility on Government and the mining industry. Groundwater abstraction is regulated by the Department of Water. The Dep

    Jan 1, 2009

  • AUSIMM
    Making Safety Simple, Useful and Effective

    By M E. Webb

    Safety is a key value in most leading mining companies. Despite years of effort, and significant expense in ‘programs’, operating sites seem to have been left with no real improvement in either the el

    Jun 22, 2016

  • AUSIMM
    Issues Confronting Major Expansions and New Developments

    The mining industry has expanded significantly in the Pacific Region over the past two decades through a mix of new developments and brownfields expansions of existing operations. Despite this overall

    Jan 1, 2004

  • AUSIMM
    Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to Design

    By D David

    Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide

    Sep 29, 2013

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Sustainable Development and Tailings

    By H Jones

    The paper outlines the adoption and evolution of ‘sustainable development’ as a concept in tailings management practices in the mining industry over the last 30 years. Over 500 lives have been lost in

    Nov 22, 2011