Simcoa's Continuous Drive Towards a Quality Organisation Through its Quality Leadership ProcessBy Brosnan J. G
Simcoa Operations is the only silicon smelter in the region and since the plant was commissioned in late-1989, has progressed from supplying silicon metal to the secondary aluminium market to the cu
Jan 1, 1995
-
Geological Controls on Drilling and Blasting OperationsBy T N. Little
This review paper presents an integrated and practical insight to blasting geology and its importance. This approach involves developing blasting objective up front and implementing geology specific b
Nov 8, 2011
-
Vertical and inclined raise bore performance at Dugald River mineBy M Lee, J F. Carswell, G Reitsema
"The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig
Oct 16, 2017
-
Benefits of Advanced Technology in Underground MiningBy M Edhammer
In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants
Mar 21, 2011
-
Managing Collaboration Effectively at NewcrestBy J Jones
A common problem in the mining industry is that company exploration groups operate in relative isolation to the rest of the company; resulting in poor knowledge transfer (Qureshi and Briggs, 2006
Aug 22, 2011
-
Predicting Iron Ore Fines Shipment MoistureBy J E. Everett, D Linden, P Maney
In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for
Aug 12, 2013
-
Description of Lead RefineryThe building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is
Jan 1, 1918
-
The Geology of KalgoorlieCHAPTER 1 - GENERALIn the introduction to this chapter a general account is given of the growth of the mining industry in Western Australia from J88G, when the output of gold for the whole State was o
Jan 1, 1912
-
Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mudBy L Bergin, D J. Williams, S Islam, T A. Vangsness
The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act
Jul 23, 2018
-
Improved Planning and Scheduling by Integration of Mining Application SoftrwareBy Aspinall T. O, Just G. D
Computer software systems have been developed to assist in a wide range of specific mine planning and scheduling applications. In selecting appropriate systems for any mining operation it is apparent
Jan 1, 1992
-
Competing Factors in Support Selection for the West Zone of the Beaconsfield Gold Mine, TasmaniaBy P Fuller, A R. Penney
Re-commencement of mining in the Western Zone of Beaconsfield Gold Mine following a seismically-induced rockfall fatality in April 2006 required a change of mining method involving drilling and blasti
Jan 1, 2008
-
Automated Mineralogy for Ore Characterisation and Plant OptimisationBy Y Gu, R Fandrich
Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat
Jan 1, 2007
-
Toe angle measurement for SAG mill control at Lihir gold mineBy M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz
SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel
Aug 29, 2018
-
Hydraulic Fracturing for Rapid Low Cost Stress Measurement in Underground MinesBy Crawford G. R, Wold M. B
The application of the hydraulic fracturing technique to the measurement of in situ rock stress from underground excavation is discussed; including relevant theoretical considerations, equipmenl detai
Jan 1, 1990
-
Development of an acQuire Based Geotechnical Data Management SystemBy V Pere
A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio
Aug 22, 2011
-
An Overview of Geotechnical Issues in Narrow Vein MiningBy M P. Sandy, J B. Albrecht
"Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or
Mar 26, 2012
-
Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving ConstructabilityBy E Rubio, N Morales
A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the
Sep 26, 2011
-
Numerical Modelling of Undermined River Valleys ù A Case StudyBy J W. Lee, E Baafi, N Aziz
Ground subsidence due to mining is a common dilemma confronting the underground coal mining industry. The effects of underground longwall mining on river valleys have come under scrutiny, especially w
Jan 1, 2005
-
Former metal mining areas in England and Wales – local residents’ preferences for the management of wastesBy A M. Sardo, D E. Sinnett
This study uses the Q Method to examine how those living in former metal mining landscapes value this heritage and their preferences for the long-term management of mine waste. Such sites are often pe
Jul 23, 2018
-
Erosion Prediction Models and Factors Affecting the Application of the Universal Soil Loss Equation to Post-Mining Landscapes in Central QueenslandBy Aspinall T. O, Bell L. C
Increased awareness and stricter enforcement of regulatory requirements for adequate rehabilitation of surface mining sites has made environmental planning an essential part of strip mine planning.
Jan 1, 1991