Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Structuring Meaningful Mentoring

    By J Coombes

    Within the mining industry there is a growing trend of placing inexperienced technical people into positions of responsibility beyond their readiness. Their responsibilities often include providing th

    Nov 20, 2012

  • AUSIMM
    Understanding the Susceptibility of the ZA-27 Zinc Base Alloy to mAcrosegregation and Inverted Pipe Formation

    By Nava-Vasquez E, Torres-Torres J, Mendez-Nonell J

    The ZA-27 zinc base alloy was poured into cylindrical moulds and solidified under different conditions ie normal freezing and unidirectional freezing. In addition a cylindrical ingot with rheocast m

    Jan 1, 1993

  • AUSIMM
    Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyser

    By M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal

    Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected

    Sep 20, 2017

  • AUSIMM
    The Use of Reverse Cleaning in Testwork on Currawong Copper-Zinc Ore

    Laboratory testwork was carried out on an overall orebody composite, of 2.9 per cent Cu and 4.2 per cent Zn, prepared from drill core taken from the Currawong fine-grained, copper-zinc massive sulphid

    Jan 1, 1999

  • AUSIMM
    Improving the Recovery of Coarse Coal Particles in a Jameson Cell

    By G J. Harbort, Z Pokra

    It has been observed in several Jameson cell installations where the source for flotation feed is deslime screens, that the recovery of coal particles greater than 0.5 m is not as great as that of fin

    Jan 1, 2005

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011

  • AUSIMM
    Bulk Low-Grade Mining at Mount Charlotte Mine

    By M F. Lee

    Although the Mt Charlotte gold resource was discovered in 1893, it was only in 1954 that geologists correctly interpreted drill data and defined a large low-grade orebody. The mine has been a large, l

    Jan 1, 2000

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    The Influence of Solar Radiation on Evaporation for Three-Dimensional Flux Boundary Modelling of Soil Cover Systems on Waste Rock Dumps

    By G W. Wilson

    Net solar radiation is one of the key factors affecting evaporation from soil covers on waste rock dumps. While net solar radiation is normally taken as a uniform parameter over a site for modelling p

    Jan 1, 2003

  • AUSIMM
    A Collaborative Model for Developing Future Continuing Education and Training in Mining

    By S W. Houlding

    The Certificate in Mining Studies program at the University of British Columbia, Vancouver, Canada is a collaborative initiative between mining schools and industry to provide accessible, cost-effecti

    Nov 22, 2011

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Mineralization at the Morning Star Gold Mine, Wood's Point, Victoria

    The Morning Star diorite dyke has been subjected to two periods of mineralization. The earlier, genetically related to the dyke magma, gave rise to a weak chalcopyrite-pyrrhotite-pentlandite-gold mine

    Jan 1, 1958

  • AUSIMM
    An Inversion Method for the Prediction of Peak Particle Velocity in Blasting

    By A T. Spathis, M L. Lawlor-O’Neill

    A methodology for the inversion of a scaled charge weight superposition model to predict peak particle velocity (PPV) has been examined. The inversion involves two steps: first simulated annealing is

    Aug 24, 2015

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    Screen Media Aperture Size Measurement Using MetsoÆs Screen Tracker

    By G van Niekerk, M Wortley

    Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.

    Sep 26, 2011

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021