Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    In Search of Quality: Tanco's Cornucopia

    Hidden under picturesque Bemic Lake, in Canada's eastern Manitoba, lies a highly fractionated pegmatite orebody, hosting a unique assemblage of minerals. Accidentally discovered in 1929, the o

    Jan 1, 1989

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Synthesis of actinide chlorides for molten salt preparation

    By S Serp, M Duchateau, P Chevreux

    Molten salt reactor (MSR) is a promising advanced reactor system aiming to the transmutation of minor actinides such as americium in order to reduce the inventory of ultimate nuclear waste. The fuel i

    Jun 19, 2024

  • AUSIMM
    Evolution of Cretaceous - Recent Drainage Networks and Distribution of Associated Gold Placers in Otago and Southland, New Zealand

    The development and distribution of gold placers in Otago û Southland is related primarily to the evolution and architecture of three distinctly different drainage networks that developed during and s

    Jan 1, 2006

  • AUSIMM
    Criteria for the Design of Emergency Refuge Stations for an Underground Metal Mine

    By G P. Bates

    The rationale for the design of the Emergency Egress (escape andentrapment) strategy for one underground metal mine has beenpreviously described (Brake, 1999). Two of the key conclusionsfor this mine,

    Jan 1, 1999

  • AUSIMM
    Clean Energy and Mining – Future Synergies

    By R Memary

    The environmental and economic impacts of a significant dependence on fossil fuels are affecting the future of sectors such as of mining. These impacts are prompting the Australian Government to seek

    Nov 22, 2011

  • AUSIMM
    Copper Converter Slag Treatment at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Lumsdaine I, O&apos

    Converter slag assaying 3.7 per cent Cu is produced by Mount Isa copper smelter at a rate of up to 180 000 tonnes per annum.Priority is given to the processing of ore, however concentrator capacity pe

    Jan 1, 1993

  • AUSIMM
    A Case History of a Deep Excavation in a Big Circular Shaft in Singapore Marine Clay

    By H Zhang, A Lawrence

    To accommodate the fast growing need for services in Singapore’s Marina Bay downtown area, Marina South, the construction of a common services tunnel (CST) was required. The CST includes various servi

    Sep 17, 2014

  • AUSIMM
    The Rise of the On-Site Geotechnical Engineer

    The current boom in the mining sector has required mining operations to ramp up production to meet the international demand for minerals. This increase in production is putting enormous pressure on on

    Jan 1, 2006

  • AUSIMM
    Advanced mine to mill application at the Barrick Cortez mine

    By J Young, S Yu, P Moyo, M Powell, A Musunuri, B Bonfils, S Kanchibotla, P Yaroshak, V Jokovic

    The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn line

    Aug 29, 2018

  • AUSIMM
    Cost-Benefit Comparisons of Ecological Risk Against Water Management Options in the Finniss River System, Australia

    Quantitative probabilistic ecological risk assessment has been used to evaluate the likely effect on fish diversity and abundance of filtered and bioavailable metals in streamwater affected by acid dr

    Jan 1, 2003

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • AUSIMM
    Coal - Paper No. 7 Permian Sedimentation In The Newcastle Coalfield, N.S.W.

    By Johnson M. W

    Factual data about the sedimentation in the Newcastle Coal. Measures are presented. Data concerning the total coal measure sequence (isopachs, sand /shale ratio and total coal thickness variation),

    Jan 1, 1969

  • AUSIMM
    Surrounded by Change - Collective Strategies for Managing the Cumulative Impacts of Multiple Mines

    By D Brereton, C J. Moran

    Intensive resource extraction, in the form of multiple mining operations, presents significant assessment and management challenges for resource developers, governments, community and the environment.

    Jan 1, 2009

  • AUSIMM
    The Evolution of Modern Canadian Shaft Sinking Technology

    This paper deals with the evolution of Canadian shaft sinking technology over the last 15 years. Most, if not all, shaft excavation projects in Canada prior to 1990 were sunk using traditional benchin

    Jan 1, 2002

  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Ore Control and Reconciliation to Maximise Metal Delivery ù A Case Study at Ridgeway Gold Mine

    By G Smart, D Ward, J Grace

    Ridgeway Gold Mine is part of Cadia Valley Operations which is wholly owned and managed by Newcrest Mining Limited. It is an underground sublevel cave (SLC) operation mining approximately 5 Mt per ann

    Jan 1, 2003

  • AUSIMM
    The Implementation of Selective Mining Practices at Hadleigh Castle Mine, Charters Towers

    By I P. Hodkinson

    SMC Resources Limited is implementing a selective mining approach at the Hadleigh Castle mine, formerly operated by Aurora Gold Limited. The main ore zone has a length of 250 metres and dips at 40 - 4

    Jan 1, 1998

  • AUSIMM
    Exploring the Use of Fibre Reinforced Shotcrete in Large Diameter Shafts

    By D J. Kilkenny, D A. O’Toole, P B. Hills, K L. Seah

    An investigation was undertaken to critically analyse the use of fibre reinforced shotcrete (FRS) for a variety of applications in large diameter shafts. Those applications included the use of FRS wit

    Nov 5, 2014