Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Proposed Modification of the Square SetBy A. J. MOORE
When the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode and across it, were composed of panels with rectangular open
Jan 1, 1912
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
The Copper Lodes of New CaledoniaIn the course of the last twenty eight years the copper lodes of New Caledonia have been periodically worked or abandoned, until quite recently, probably attracted by the higher price of the metal, Br
Jan 1, 1901
-
Remediation of Chicken Processing Wastewater using Electrochemically Produced Layered Double HydroxidesBy Jewel A. G. Gomes
Green rust (GR) are layered Fe(II)-Fe(III) double hydroxides, having a pyroaurite-type structure consisting of positively charged hydroxide layers and hydrated ions in interlayers. This special featur
Jan 1, 2010
-
Human Resources Management at Grey River Gold Mining LimitedGrey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle
Jan 1, 1989
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge AlternativesBy M. A. Reyes, L. Yan
Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i
Nov 22, 2019
-
Minutes of the Twelfth Regular Meeting of the Rocky Mountain Coal Mining Institute, Held at Denver, Colorado, February 25 and 26, 1921 - February 25th. Morning SessionThe meeting was called to order by the President, Mr. B. J. Matteson, in Dining Room No. I of the Albany Hotel, at 10 a. in., with thirty members present. After an address of welcome by the President,
Jan 1, 1921
-
Corrosive Wear of Grinding Media in Grinding a Complex Zinc-Lead-Copper Sulphide OreBy Freeman C, Dingley W
Addition of sodium nitrite-borax, sodium hydroxide, sodIUm carbonate, lime, or sodium silicate reduced wear of forged steel balls and cast iron slugs in wet grinding a complex zinc-lead-copper sulphid
Jan 1, 1978
-
An Evaluation Study: Recent Developments and Processing of Glass Scrap RecyclingBy Burcu Ertug, Necip Ünlü
"On average, one out of two glass bottles coming on to the market is provided by recycling processes in Europe. Glass recycling has been started by the early of 1970s in Turkey, and the recycling amou
Jan 1, 2012
-
Meetings of the Institute (f1d6a8b1-1d78-41d7-8670-b18f60bb30ee)LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION TO OCTOBER, 1904 Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August,
Jan 1, 1923
-
Meetings of the Institute (6cd3fbce-d34a-4b22-9fb7-778300138ba3)LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION TO OCTOBER, 1904 Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August,
Jan 1, 1923
-
Rock Engineering Method To Pre-Evaluate Old, Small Coal Pillars For Secondary Mining ? SynopsisBy J. N. Van der Merwe
Due to the approaching depletion of reserves in the Witbank Coalfield, and the fact that the Waterberg Coalfield is as yet under developed, there is increasing pressure to extend the lives of the oper
Jan 1, 2012
-
Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze WallBy Helmut Hass, Michael B. Gilbert
The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S
Jan 1, 2007
-
An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentratorBy Barun Gorain, Andy Stradling
"The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h
Jan 1, 2002
-
RI 4807 Estimate Of Known Recoverable Reserves Of Coking Coal In Fayette County, Pa.By James J. Dowd
The investigation to evaluate the reserves of coking coal in the United States suitable for the manufacture of metallurgical coke is being made by the Bureau of Mines in three parts: (1) To estimate k
Jan 1, 1951
-
An Update on the Geological Resource Map (Germ) Computerised Mineral Deposit Inventory DatabaseThe Geological Resource Map of New Zealand (GERM) is a computerised inventory of aggregate, mineral, coal, petroleum and thermal water occurrences, containing summary information on location, producti
Jan 1, 1991
-
GeochemistryThe term geochemistry - chcmbtry' of the earth - is almost limitless in its implied subject, but of recent years a major trend of research in this field has been towards economic application in t
Jan 1, 1950
-
Model Predictive Control of the Flotation ProcessBy Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert
"In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled
Jan 1, 1999
-
Excavation And Support Of A Water Tunnel Through The Hayward Fault ZoneBy Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo
The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p
Jan 1, 2007
-
Feasibility Study On Underground Coal Gasification Of No. 15 Seam In Fenghuangshan Mine ? SynopsisBy W. G. Huang
To recover the coal resources of high-sulphur anthracite in Jincheng Mining Area, underground coal gasification (UCG) of No. 15 seam in Fenghuangshan Coal Mine was proposed. The feasibility of the pro
Jan 1, 2012