Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Selective Flocculation Of Fine Phosphate Materials (8c939b54-ad68-4cf0-a2e6-037610cedf74)By H. Sis, D. Dahlin, S. Chander, C. Summers
Bench-scale selective-flocculation tests were conducted on samples of Florida and Western phosphate process tailings. Physical, mineralogical, and surface characteristics were determined for both typ
Jan 1, 2002
-
On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic PlantBy Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon
"In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on
Jan 1, 2000
-
Extractive Metallurgy Division - High-Purity TantalumBy R. F. Rolsten
VAN Arkel 1 prepared ductile tantalum by the thermal decompoiition of tantalum pentachloride on a resistively heated wire (2000° C) in an evacuated bulb maintained at 100°C. Burgers and Basart2'3
Jan 1, 1960
-
Advances in Copper Anode Reverberatory Furnace PracticeAt Copper Refineries Pty. Ltd., Townsville, two reverberatory furnaces of 420 tonnes capacity are used to melt 210000 tonnes/year of copper for subsequent anode casting. When the refinery commenced pr
Jan 1, 1977
-
Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct TunnelBy C. D. Hebert, M. R. King
The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with
Jan 1, 2007
-
World Financial Center Foundations, New YorkBy G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and ShaftBy Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Technical Assessment of Subsequent Burdens due to Hard Coal MiningBy Axel Preusse
On the basis of the Law on Financing Hard Coal Mining dated 28 December 2007, the subsidized German hard coal mining industry will be shut down to the end of the year 2018 in a socially acceptable man
Jan 1, 2008
-
Some Geological Problems of Central SaskatchewanBy F. H. Edmunds
I N presenting this paper, the writer wishes to point out some of the difficulties and problems of geological work in that part of Saskatchewan in which outcrops are few. These problems are well known
Jan 1, 1937
-
Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? IntroductionBy I. Ocak
Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme
Jan 1, 2011
-
Variation in property parameters of iron ore granulated mix with moisture contentBy C Li, D O’Dea, R Moreno-Atanasio, T Honeyands
The behaviour of iron ore granules in the feeding process of sintering is significantly influenced by the material properties of the granulated mix. Therefore, the measurement of key material properti
Jul 24, 2017
-
Pyrometallurgical Refining Of Copper In An Anode FurnaceBy H. Antrekowitsch
The decreasing quality of the input materials in copper recycling leads to a higher content of impurities in the anode copper. An improvement of the pyrometallurgical refining process is therefore nec
Jan 1, 2005
-
Opportunities for Integrated Mine Management to Minimise Risk and Create ValueBy D Rattray, D Macfarlane, I Robb, N Halpin, G T. Dale
Mining faces many environmental, social and regulatory liabilities of which water management is just one. Others include site rehabilitation, carbon emissions, biodiversity offsets, strategic cropping
Nov 26, 2013
-
Reconnecting The Rogue River To The Channel Migration Zone: An In-Channel Bank Stabilization ProjectBy E. F. Schnitzer, D. R. Haight, G. T. Krogman
The 1997 New Year’s Day Rogue River flood near Medford, Oregon, USA, entered historic channels, eroded a 150-foot-wide buffer, and captured an inactive gravel pond located within the channel migration
Jan 1, 2006
-
A long hole stoping system for mining narrow platinum reefsBy P. Valicek, M. Farren, R. G. B. Pickering, G. Harrison, P. van Dorssen, W. Joubert, H. J. van Rensburg
Introduction In South African metalliferous mines, stoping operations are largely confined to narrow, tabular orebodies making mechanization extremely difficult. Limited flexibility in terms of st
Sep 1, 2001
-
"Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo
For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish
Jan 1, 2016
-
Phase Equilibria In High MgO Ferro- And Silico-Manganese Smelting SlagsPhase equilibria have been determined experimentally for pseudo-ternary sections of the form ?MnO?-(CaO+MgO)-(SiO2+Al2O3) with a fixed Al2O3/SiO2 weight ratio of 0.17 and MgO/CaO weight ratios of 0.25
Jan 1, 2004
-
De Beers, Sandvik Team Up On Underground AutomationDe Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber
Jan 1, 2008
-
Patterning Atop Shape Memory Polymers and Their CharacterizationBy Y. Zhoa
The surface morphology of materials is of fundamental importance to many surface related applications, such as wetting, friction, reflection, drag, and adhesion. Various approaches for micro/nano patt
Jan 1, 2010
-
Development of a Cadmium Removal Process for Vale’s Long Harbour Hydrometallurgy PlantBy P. C. Holloway, A. Tshilombo, T. Xue, M. J. Collins, R. Lopetinsky, I. Mihaylov, I. M. Masters
The Voisey’s Bay deposit contains a trace amount of cadmium, which reports to solution during pressure leaching of the nickel concentrate at Vale’s Long Harbour Hydrometallurgy Plant, and must be remo
Jan 1, 2019