Search Documents

  • DFI
    Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall

    By Allan Sylvester

    Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel

    Jan 1, 1997

  • SME
    St. Cloud Mining Company’s Stone House Zeolite Mine And New Uses For Clinoptilolite

    By G. S. Austin

    The St. Cloud Mining Company extracts clinoptilolite about 6.5 km south of Winston, Sierra County, New Mexico. Production is about 18,000 mt/year. Natural zeolites are good adsorbents for positively c

    Jan 1, 2002

  • DFI
    Selection & Design Of Augered Cast-In-Place (ACIP) Piles

    By Dan A. Brown

    Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa

    Jan 1, 2004

  • DFI
    Results Of An International Pile Load Testing Prediction Event

    By N. Charue

    An international prediction event was carried out within the framework of a 30-pile testing program organized in a sandy soil in Belgium (Limelette). That program called upon sev­eral testing methods:

    Jan 1, 2002

  • NIOSH
    RI 9328 - Laboratory Testing of the CSE SR-100 Self-Contained Self-Rescuer for Ruggedness and Reliability

    By N. Kyriazi

    The U.S. Bureau of Mines subjected the CSE SR-lOO self-contained self-rescuer (SCSR) approved by the National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Admini

    Jan 1, 1990

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014

  • NIOSH
    IC 8177 Oil Recovery By Miscible-Phase Displacement: A Bibliography ? Introduction

    By L. K. Weaver

    The Bureau of Mines has started an engineering study of oil recovery by miscible-phase displacement. As a preliminary part of the investigation a literature and patent study was made to prevent duplic

    Jan 1, 1963

  • SME
    Development Of An Energy-Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, Alaska

    By J. T. Hollow

    The Fort Knox Mine is located in Alaska?s interior, where the average ambient air temperatures range from -24°C (-11°F) in January to 16°C (61°F) in July. The mill processes a free-milling gold ore ut

    Jan 1, 2007

  • CIM
    Towards Sustainable Mining

    ?Why TSM in Canada ?How it was developed ?Architecture and Goverance ?COI panel ?Performance indicators and how they work ?External Verification ?Reporting ?The national organization of the Can

    May 1, 2011

  • AUSIMM
    Water Quality of Streams Draining Various Coal Measures in the North-Central West Coast

    After a snap-shot survey of water quality of streams draining various coal measures carried out in 2000 - 2001, West Coast Regional Council expanded its monitoring programme to better establish the co

    Jan 1, 2003

  • CIM
    The Copper Situation

    By Arthur Notman

    Since addressing the Institute a year ago on The Future of the Copper Industry (l), many things have happened, most of them bad. It has been a hard year for profits and prophets. It was, therefore, wi

    Jan 1, 1932

  • NIOSH
    Identification Of Noise Sources On Longwall Panels Using Multiple Time-Synchronized Dosimeters

    By E. R. Spencer, D. R. Babich, L. A. Alcorn, A. K. Smith

    Noise is one of the most pervasive health hazards in mining. A compilation of Mine Safety and Health Administration (MSHA) noise survey data for fiscal year 1990 shows that approximately 40% of the to

  • DFI
    Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization

    By Frederick W. Slack

    This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage

    Jan 1, 2003

  • NIOSH
    OFR-123(5)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume V Application Of PSU/MVS To The Ventilation Planning Of A New Mine

    By R. Stefanko

    In this report, the use of Penn State Ventilation Simulator (PSU/MVS) for planning and evaluating new coal mine ventilation systems is demonstrated. The simulator's application to evaluate the ve

    Jan 1, 1977

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010

  • SME
    Reproducibility Of Bond Work Index With Different Standard Ball Mills

    By P. C. Fletcher, E. Kaya

    The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o

    Jan 1, 2002

  • CIM
    Grinding Circuit Improvements at Barrick Goldstrike’s Roaster Facility

    By Jim Wickens, Andy Cole, John Pekrul

    "The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut

    Jan 1, 2003

  • ISEE
    Protection Against Litigation with Good Pre-Blast Surveys, Damage Inspections and Record Keeping

    By Randall Wheeler, R. Frank Chiappetta

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation. and Explosives Applications - Orlando, Florida, USA July 24 - 27,200O 2000 BAI - PROTECTION AGAINST LITIGATION WITH GOOD PRE-BLAST SURVEYS,

    Jan 1, 2000

  • SME
    The Role Of Occupational Health & Safety Management Systems In Implementing Best Management Practices For Self-Monitoring Programs In Mining Operations ? Introduction

    By A. Korchevisky

    Environmental self-monitoring is one of the advanced approaches for industrial sustainability programs. Organization for Economy Cooperation and Development (OECD) defines self-monitoring as ?the syst

    Jan 1, 2012

  • ISEE
    Presplitting Techniques and Field Controls

    The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlled

    Jan 1, 1992