Search Documents

  • IIMP
    Optimización en el ore control de la unidad Yauli

    By Jesús Ylazaca

    El presente trabajo describe el método de control de calidad del mineral o el denominado "Ore control", realizado en la unidad minera Yauli, cuya finalidad es maximizar el valor del mineral minado par

    Sep 12, 2005

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • TMS
    Cost Analysis Of Used Battery Recycling In Taiwan

    By Esher Hsu

    In Taiwan, around 8,000 tons of batteries are consumed per year but only 17% of which were collected and transported to oversea for recovery. The dumping used batteries have become a potential enviro

    Jan 1, 2006

  • NIOSH
    Coal Bed Discontinuity Effects on the Production of Degasification Boreholes and on Emissions during Longwall Mining

    Geological discontinues in the coalbed, such as faults, sandstone channels, permeability facies, lithotype changes, and large scale partings in the coal seam, can cause intermittent production problem

    Jan 1, 2008

  • SME
    NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th Bore

    By Bhaskar B. Thapa

    The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p

  • IIMP
    Optimización del proceso gold mill Yanacocha Minera Yanacocha

    By Luis Vente

    El presente texto describe las mejoras implementadas en el proceso Gold Mill de Minera Yanacocha luego de 3 años de operación desde marzo 2008 hasta la fecha. El desarrollo de diferentes diseños en lo

    Sep 12, 2011

  • NIOSH
    IC 6796 Apparatus and method for determination of helium in natural gas

    By C. C. Anderson

    "While conducting investigations in connection with the helium program of the Bureau of Mines, the Cryogenic Laboratory has improved an apparatus for the rapid and accurate determination of the helium

    Jun 1, 1934

  • CIM
    Clayburn-Harbison Limited Operations in British Columbia

    By R. H. Beaton

    "About 1905, a plant was constructed at C1ayburn, in the Lower Fraser valley, 4'5 miles east of Vancouver, to process shales from Sumas mountain into heavy clay products. In time, mining operations we

    Jan 1, 1959

  • TMS
    A Process for the Simultaneous Leaching and Recovery of Gold, Platinum Group Metals and Base Metals from Ores and Concentrates

    A novel pressure leaching process for platinum group metal (PGM) feedstocks is described. The process is particularly well suited for treatment of ores or concentrates that are too low grade for econo

    Jan 1, 2000

  • AUSIMM
    Lead-Zinc Flotation Circuits Tested at Mount Isa Mines 1959-1963 (9858f0dc-f385-4a3d-8b45-7d50f36477d6)

    By Tanner A. C, Harraway D. H

    Various circuits were tried at Mount Isa Mines during the period 1959 to 19G3 with the objective of improving the differential flotation of galena and sphalerite. Many benefits and disadvantages of th

    Jan 1, 1963

  • AUSIMM
    The distribution, petrology, and mineralisation of Mid Cretaceous to Palaeogene Marine Volcanics in Papua New Guinea: An initial survey

    By Rogerson R, Queen L

    The petrology and age of mid Cretaceous to Palaeogene marine volcanics may provide important clues to the palaeogeography of the period, particularly for tectonic elements and events outboard of t

    Jan 1, 1991

  • SAIMM
    Blast optimization at Kriel Colliery - Synopsis

    By A. M. Neale

    Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe

    Jan 1, 2010

  • TMS
    Cerro Verde Hydrometallurgical Plant Design Features and Operation

    By O. Durand

    The Cerro Verde Hydrometallurgical Plant, located at Arequipa in the southern part of Peru, started its operation in 1977 with a design capacity of 33,000 MT/year of copper cathodes. The plant has tr

    Jan 1, 1987

  • AUSIMM
    The Composition of the Peko Copper Orebody, Tennant Creek

    The Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.

    Jan 1, 1955

  • TMS
    Definition of Mineral Textural Types Aiming at the Beneficiation of Aljustrel and Neves-Corvo Massive Sulphides

    By Orlando C. Gaspar

    The textures of the ores, the fine mineral intergrowths, the complex distribution of the deleterious minor elements, and the low base metal contents in some ore types, pose many technological problems

    Jan 1, 1995

  • DFI
    Sandwich Wall Beneath Amsterdam Centraal Station - An Innovative Approach For Jet Grouting Under Difficult Conditions

    By J. C. W. M. de Wit

    An excavation, within which a tunnel is sunk as a part of the Centraal Station underground station (platform section) of the Noord/Zuidlijn ('North/South Line'), is to be created beneath the

    Jan 1, 2006

  • ISEE
    Experimental and Computational Investigation of the Fundamental Mechanisms of Cratering (c03a8e57-961a-42b6-9348-3dd891fa944e)

    By B Brown, P J. Hommert, B J. Thorne

    "Early attempts at estimation of stress wave damage in blasting by use of finite element analysis met with limited success due to numerical instabilities that prevented calculations from being carried

    Jan 1, 1990

  • SME
    CART?: A Fundamental Tool For Process Circuit Design

    By A. Noble

    The design of separation circuits can be a complex, labor-intensive and costly process. While the engineer?s experience along with extensive data sets and simulation are crucial tools for determining

    Feb 27, 2013

  • SME
    A Review of Copper and Nickel Extraction from Wastewater by Emulsion Liquid Membrane (ELM) - Mining, Metallurgy & Exploration (2023)

    By Kristian E. Waters, Hao Ma, Haibei Wang

    Over the past few decades, ELM based separation processes have become an attractive and efficient way to remove toxic metal ions from the various aqueous waste effluent streams. This paper provides a

    Jan 6, 2023

  • CIM
    Classification at the Sullivan Concentrator

    By G. J. Knighton

    Introduction The Sullivan concentrator treats the complex lead-zinc-iron ore from the Sullivan mine of the Consolidated Mining and Smelting Company of Canada, Limited, to make a lead and a zinc con

    Jan 1, 1947