Search Documents

  • SME
    International education of mining engineers ? an update on the Australian experience and international opportunities for collaboration

    Collaboration between education providers is the key to long-term sustainability and improved quality in mining education. The mining industry is now, more than ever, an industry doing business on a g

    Jan 2, 2010

  • AIME
    Drilling - Equipment, Methods and Materials - Temperature Distribution in a Circulating Drilling Fluid

    By L. R. Raymond

    With the trend toward deeper and consequently hotter holes, measurements of drilling mud properties at atmospheric temperatures are becoming increasingly inadequate.' Both the prediction and cont

    Jan 1, 1970

  • AUSIMM
    Gold Mineralisation at Porgera, Papua New Guinea

    The Porgera gold deposit is an epithermal gold base-metal deposit located in the Enga Province of Papua New Guinea. Gold-silver-sphalerite-galena-pyrite mineralisation is related to stocks and dykes o

    Jan 1, 1980

  • NIOSH
    Coal Mine Safety Achievements In The USA And The Contribution Of NIOSH Research

    By R. G. Gürtunca

    Over the past century coal miner safety and health has seen tremendous improvements, the fatality and injury rates continue to decrease while productivity continues to increase. Many of the hazards th

  • AUSIMM
    Cleaner Production in Alcoa

    By S Sandover, D Glenister

    Alcoa World Alumina Australia is committed to sustainability principles as a basis of business success into the future. In March 2001, Alcoa Inc chairman Alain Belda announced a set of far-reaching en

    Jan 1, 2002

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • AUSIMM
    Ore Treatment at Martha Current Operations and Future Directions

    The treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t

    Jan 1, 2001

  • AUSIMM
    Implications of Flyrock Associated with Blasting in Urban Areas

    By J D. St George

    Flyrock is the unexpected and undesirable projection of rock fragments during detonation of a blast and managing this risk is becoming an increasing challenge as urban development encroach toward mine

    Jan 1, 2001

  • ISEE
    A Digital Surface Remote Blasting System

    By Peter Reinders, Dirk Hummel

    This paper describes a newly developed Surface Remote Blasting System (SURBS) for electronic detonators, which is currently being introduced into surface blasting applications. The rationale for devel

    Jan 1, 2005

  • SAIMM
    The application of pumpable emulsions in narrow-reef stoping (c3a49f1e-796f-497e-8d58-8a582c0eb90b)

    By S. P. Pearton

    "Pumpable emulsion explosives have been available to surface and underground massive mining operations for decades, and their unique properties offer significant advantages in terms of improved safety

    Jan 1, 2015

  • CIM
    Enterprise Optimization Releasing Value Through Better Planning Decisions

    By Gerald Whittle

    What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea

    May 1, 2010

  • SME
    A database of ventilation friction factors for Quebec underground mines

    One of the most important parameters in mine ventilation planning is the friction factor (K). Accurate values of friction factors are critical especially when carrying out mine ventilation simulations

    Jan 1, 2009

  • RMCMI
    1992 RMCMI Advertiser Listing ? Invitation

    Allis Mineral Systems ARCO Coal Company Buckley Powder Co. CALCO, Inc. Coal Magazine Colowyo Coal Company Continental Conveyor & Equipment Company Crane & Hoist Sales Cummins Southwest, Inc.

    Jan 1, 1992

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • SME
    Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 Tunnel

    By S. H. Jason Choi

    The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne

  • SAIMM
    Haul Roads Can Make Money!

    By A. T. Visser

    "SynopsisAlmost 20 years have passed since the cutting-edge research by Thompson and Visser on the design and management of opencast mine haul roads was conducted in South Africa. This system is based

    Jan 1, 2015

  • ISEE
    Presplitting and Controlled Blasting Techniques, Including Air Decks and Dimension Stone Criteria

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1991

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000